If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-103-24166 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.26,"lon":-81.74,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Medina | |
Municipality: Hinckley Township | |
Operator Name: PINE TOP INC | |
Well Pad ID: | |
Farm/Lease Name: HRUSKA | |
License Status: Producing | |
License Date: 1985-06-24 | |
Spud Date: 1985-07-19 | |
Spud Drilling Contractor: ARMSTRONG DRLG | |
Final Drill Date: 1985-07-23 | |
Well Total Depth: 3343.00 ft | |
Configuration: Vertical | |
Latitude: 41.260000 | |
Longitude: -81.740000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1985-06-24 | 570 PINE TOP INC GeoDate 6/24/85 |
Oil and Gas | 1985-06-24 | Issued Date 6/24/85 Expired Date 6/24/86 Acres 0021500 Tool Type RTA Proposed Formation CLINTON Proposed Depth 03343 Proposed Drill Depth 03343 |
Original Spud | 1985-07-19 | |
Completed | 1985-07-23 | |
Reached Total Depth | 1985-07-23 | |
Completion Report Received | 1986-02-24 | |
Construction Permit Expires | 1986-06-24 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 3133 | 3212 | 0 |
3133 | 3212 | 0 | |
2006-09-11 | 3155 | 3176 | 17 |
3155 | 3176 | 17 | |
3133 | 3212 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 66000 Gal | 40000 | PRELIMINARY |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | PINE TOP INC | 0.00 | 0.00 | 0 |
1988 | PINE TOP INC | 11220.00 | 0.00 | 365 |
1989 | PINE TOP INC | 10009.00 | 159.00 | 365 |
1990 | PINE TOP INC | 5299.00 | 87.00 | 365 |
1991 | PINE TOP INC | 3772.00 | 69.00 | 365 |
1992 | PINE TOP INC | 6060.00 | 129.00 | 365 |
1993 | PINE TOP INC | 3309.00 | 0.00 | 365 |
1994 | PINE TOP INC | 1628.00 | 0.00 | 365 |
1995 | PINE TOP INC | 1402.00 | 0.00 | 371 |
1996 | PINE TOP INC | 789.00 | 0.00 | 338 |
1997 | PINE TOP INC | 789.00 | 0.00 | 338 |
1998 | PINE TOP INC | 789.00 | 0.00 | 338 |
1999 | PINE TOP INC | 19.00 | 116.00 | 365 |
2000 | PINE TOP INC | 0.00 | 0.00 | 0 |
2001 | PINE TOP INC | 138.00 | 0.00 | 365 |
2002 | PINE TOP INC | 0.00 | 0.00 | 365 |
2003 | PINE TOP INC | 0.00 | 0.00 | 365 |
2004 | PINE TOP INC | 0.00 | 0.00 | 365 |
2005 | PINE TOP INC | 14.00 | 0.00 | 365 |
2006 | PINE TOP INC | 301.00 | 0.00 | 0 |
2007 | PINE TOP INC | 347.00 | 0.00 | 0 |
2009 | PINE TOP INC | 249.00 | 0.00 | 2 |
2011 | PINE TOP INC | 114.00 | 0.00 | 365 |
2012 | PINE TOP INC | 416.00 | 0.00 | 366 |
2014 | PINE TOP INC | 172.00 | 0.00 | 365 |
2016 | PINE TOP INC | 6.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | PINE TOP INC | Brine | 50 | 0 |
1988 | PINE TOP INC | Brine | 705 | 365 |
1989 | PINE TOP INC | Brine | 1156 | 365 |
1990 | PINE TOP INC | Brine | 549 | 365 |
1991 | PINE TOP INC | Brine | 213 | 365 |
1992 | PINE TOP INC | Brine | 275 | 365 |
1993 | PINE TOP INC | Brine | 0 | 365 |
1994 | PINE TOP INC | Brine | 20 | 365 |
1995 | PINE TOP INC | Brine | 0 | 371 |
1996 | PINE TOP INC | Brine | 0 | 338 |
1997 | PINE TOP INC | Brine | 0 | 338 |
1998 | PINE TOP INC | Brine | 0 | 338 |
1999 | PINE TOP INC | Brine | 0 | 365 |
2000 | PINE TOP INC | Brine | 0 | 0 |
2001 | PINE TOP INC | Brine | 0 | 365 |
2002 | PINE TOP INC | Brine | 0 | 365 |
2003 | PINE TOP INC | Brine | 0 | 365 |
2004 | PINE TOP INC | Brine | 0 | 365 |
2005 | PINE TOP INC | Brine | 0 | 365 |
2006 | PINE TOP INC | Brine | 0 | 0 |
2007 | PINE TOP INC | Brine | 0 | 0 |
2009 | PINE TOP INC | Brine | 0 | 2 |
2011 | PINE TOP INC | Brine | 0 | 365 |
2012 | PINE TOP INC | Brine | 0 | 366 |
2014 | PINE TOP INC | Brine | 0 | 365 |
2016 | PINE TOP INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1502492557 | 2013-11-15 0:00 | PW | No Violations | |
000PL11452 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0475695049 | 2015-04-15 | Production Wells | No Violations | Inspected production well on 04/15/2015. The tank battery consists of 1-210 bbl steel tank, 1-50 bbl steel tank, and 2-vertical separators located within an earthen dike; the diked area is located within an unlocked metal fence. No well identification is posted at the tank battery as required. The well is equipped with a wellhead with an elbow, located within a locked metal fence. Well identification is posted at the wellhead as required. No other problems were noted at the time of the inspection. |
1486397709 | 2016-11-18 | Production Wells | No Violations | Received phone call from Terry Whitehair of the Oil and Gas Emergency Response, reporting flowline that was hit by a contractor that was digging trench to hook up to the water service line along Ridge Road (RT-3) to a new constructed residence at address 330 Ridge Road. Requested that I response to the site and evaluate it see if additional follow-up is need from Emergency Response.
Conducted site inspection on 11-18- Upon the arrival of Tony Carlie Field Supervisor for Pine Top Energy owner of the Flow Line and the wells in this area. He ordered a water truck, Clean up Contractor Both are in route to site to remove the fluid and contaminated from the trench Mr. Carlie proceeded to put down Oil absorbent material and pads to soak up the loose oil, when water truck and cleanup crew arrived he had the water truck remove as much of the fluid as possible. Then proceeded to have the track hoe to skim and remove the contaminated soil which was placed on plastic for removal. |
1502492557 | 2013-11-15 | Production Wells | No Violations | Inspected well on 11/15/2013 per the request of the new landowner Shawn Gaphney. Mr. Gaphney had a property inspection performed, and the inspector noted that the wells were in bad shape and should be inspected by the ODNR. Tank battery consists of 1-210 bbl tank, 1-50 bbl tank and 2 separators located inside an unlocked metal fence and within an earthen dike. There were no charts within the gas meters at the time of the inspection. Tank battery is somewhat overgrown, but not overly so. The pumper has clearly been there recently weed-eating and using the lease road. Wellhead is located within an unlocked metal fence. Well identification is posted at the wellhead. No problems were noted at the time of the inspection. |
475695049 | 2015-4-15 0:00: | PW | No Violations | |
PL11452 | PL | No Violations |
For data sources see[9]