If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-103-24350 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.13,"lon":-82.05,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Medina | |
Municipality: Chatham Township | |
Operator Name: HARLEY DRILLING & PRODUCING LT | |
Well Pad ID: | |
Farm/Lease Name: MUNZ JAMES & FRANK | |
License Status: Producing | |
License Date: 1986-06-14 | |
Spud Date: 1986-11-17 | |
Spud Drilling Contractor: | |
Final Drill Date: 1986-12-14 | |
Well Total Depth: 410.00 ft | |
Configuration: Vertical | |
Latitude: 41.130000 | |
Longitude: -82.050000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Original Spud | 1986-11-17 | PD.NAT. & 1/2 BO: IP.A.S. & 2 1/2 BO FDT=DARK |
Completed | 1986-12-14 | PD.NAT. & 1/2 BO: IP.A.S. & 2 1/2 BO FDT=DARK |
Reached Total Depth | 1986-12-14 | PD.NAT. & 1/2 BO: IP.A.S. & 2 1/2 BO FDT=DARK |
Record Last Modified | 2013-10-03 | PD.NAT. & 1/2 BO: IP.A.S. & 2 1/2 BO FDT=DARK |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 280 | 295 | 0 |
2006-09-11 | 330 | 350 | 0 |
280 | 295 | 0 | |
280 | 295 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
NITR | 0 | 165 Qts | 0 |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-309904260 | 2014-6-30 0:00: | PW | No Violations | |
0309904260 | 2014-06-30 | Production Wells | No Violations | Inspected production well on 06/30/2014. The tank battery consists of 2-100 bbl steel tanks, 1-210 bbl steel tank (on its side), and 1-vertical separator located within an earthen dike. The tank battery is used by multiple wells; identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. A small amount of paraffin/oil was noted on the ground immediately around the wellhead that will need to be cleaned up. Well identification is posted at the wellhead as required. Jason Klauss with Harley Drilling was notified of the need for clean-up at the wellhead and will address it as soon as possible. No other problems were noted at the time of the inspection. |
For data sources see[9]