If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-103-24946 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.13,"lon":-82.05,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Medina | |
| Municipality: Chatham Township | |
| Operator Name: HARLEY DRILLING & PRODUCING LT | |
| Well Pad ID: | |
| Farm/Lease Name: ELLIOTT | |
| License Status: Final Restoration | |
| License Date: 2002-02-05 | |
| Spud Date: 2003-02-03 | |
| Spud Drilling Contractor: CO TOOLS | |
| Final Drill Date: 2003-02-05 | |
| Well Total Depth: 320.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.130000 | |
| Longitude: -82.050000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2002-02-05 | Proposed Formations:BEREA, Issued Date:2/5/2002, Expired Date:2/5/2003 6:00:00 AM, Drilling unit acres:29.4, Proposed Well Type:OG, Proposed Well Class:POOL |
| Original Spud | 2003-02-03 | |
| Completed | 2003-02-05 | |
| Construction Permit Expires | 2003-02-05 | |
| Reached Total Depth | 2003-02-05 | |
| Plugged/Abandoned | 2003-10-10 | |
| Completion Report Received | 2003-12-31 | |
| Record Last Modified | 2018-04-06 |
For data sources see[2]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2005 | HARLEY DRILLING & PRODUCING LT | 0.00 | 0.00 | 0 |
| 2007 | HARLEY DRILLING & PRODUCING LT | 0.00 | 0.00 | 365 |
| 2008 | HARLEY DRILLING & PRODUCING LT | 0.00 | 0.00 | 0 |
| 2009 | HARLEY DRILLING & PRODUCING LT | 0.00 | 0.00 | 365 |
| 2010 | HARLEY DRILLING & PRODUCING LT | 0.00 | 0.00 | 365 |
| 2011 | HARLEY DRILLING & PRODUCING LT | 0.00 | 40.00 | 365 |
| 2012 | HARLEY DRILLING & PRODUCING LT | 0.00 | 46.00 | 366 |
| 2013 | HARLEY DRILLING & PRODUCING LT | 0.00 | 23.00 | 365 |
| 2014 | HARLEY DRILLING & PRODUCING LT | 0.00 | 0.00 | 365 |
| 2015 | HARLEY DRILLING & PRODUCING LT | 0.00 | 23.00 | 365 |
| 2016 | HARLEY DRILLING & PRODUCING LT | 0.00 | 23.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2005 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 0 |
| 2007 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
| 2008 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 0 |
| 2009 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
| 2010 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
| 2011 | HARLEY DRILLING & PRODUCING LT | Brine | 38 | 365 |
| 2012 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 366 |
| 2013 | HARLEY DRILLING & PRODUCING LT | Brine | 1 | 365 |
| 2014 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
| 2015 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
| 2016 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1470169889 | 2017-10-5 0:00: | FR | No Violations | |
| 1470169889 | 2017-10-05 | Final Restoration | No Violations | Reviewed RBDMS for well data found well was completed in 02-03-03 and put into production on 02-03-03, date plugged if dry 10-10-03 , No plugging report on file.
Open field just harvested no evidence of the well casing walked area. Phone call to Steve Harley to file plugging report for this well. |
For data sources see[7]