X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-103-25012

Well Details

Well ID: 34-103-25012
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: BLEACHTECH LLC
Well Pad ID:
Farm/Lease Name: BLEACH TECH(SMP #1)
License Status: Active Injection
License Date: 2006-12-12
Spud Date: 2007-09-17
Spud Drilling Contractor: H A D INC
Final Drill Date: 2007-10-04
Well Total Depth: 2484.00 ft
Configuration: Vertical
Latitude: 41.020000
Longitude: -81.870000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2006-12-12 Proposed Formations:SALINA F1 SALT, Issued Date:12/12/2006, Expired Date:12/12/2007 6:00:00 AM, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP
Reached Total Depth 2007-10-04
Construction Permit Expires 2007-12-12
Completion Report Received 2008-03-19
Last Compliance Report 2018-02-02
Record Last Modified 2018-02-02

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
0 0 0 SOLUTION MINING WELL; NOT PERFED OR TREATED... 150 GAL OF 30% HCL FOR CLEAN UP ONLY… GM

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1172526615 2010-6-8 0:00:0 PL No Violations 0.70
-1339537583 2012-10-3 0:00: SM No Violations
-1340160076 2007-11-29 0:00 SM No Violations 1.00
-1366824042 2007-9-21 0:00: DD No Violations 1.00
-1428722431 2015-8-17 0:00: SM No Violations
-162024042 2015-8-13 0:00: SM No Violations
-1856862328 2015-8-6 0:00:0 SM No Violations
-1894969554 2015-8-19 0:00: SM No Violations
-1945902250 2008-3-21 0:00: SM No Violations 0.50
-2018253214 2008-9-10 0:00: PL No Violations 1.50
-305615049 2007-10-10 0:00 SM No Violations 0.70
-468448425 2019-5-13 0:00: SM No Violations 0.30
-679334849 2007-9-19 0:00: DD No Violations 1.50
-750950070 2007-9-17 0:00: DD No Violations 2.20
-794567658 2015-8-5 0:00:0 SM No Violations
-824728567 2007-9-21 0:00: DD No Violations 1.50
-87860910 2017-5-18 0:00: SM No Violations
-924985950 2007-10-8 0:00: SM No Violations 4.00
-998397499 2007-10-5 0:00: SM No Violations 2.70
0035282265 2008-07-17 Solution Mining Project No Violations Arrive today and found that Glenn Davis is pulling 2 3/8 tubing out and running in a new string .The tubing had a hole in it and found several bad joints so they are running in with a new string.
0087860910 2017-05-18 Solution Mining Project No Violations Inspected well on 05/18/2017 with Inspector Steve Ochs at the request of Andrew Adgate to confirm the well status. The well has been placed into production, and well identification is clearly displayed. The well status (AI) is correct. No problems were noted at the time of the inspection.
0162024042 2015-08-13 Solution Mining Project No Violations Visited location on 08/13/2015 to follow-up on status of brine leak clean-up. The ditches have been scraped out and flushed. Bleachtech staff was in the process of removing burnt out grass and contaminated soil from the Robot Co. (next building south of Bleachtech on Ryan Rd.). While removing contaminated soil, it was noted that the cylinder on the earthmover had blown and was leaking oil. Decision made to stop working with equipment until repair has been made in order to not further contaminate soil.
0226684413 2015-08-07 Solution Mining Project No Violations Visited location on 08/07/2015 for meeting regarding brine spill clean-up. Seville sewer will not allow collected water to be flushed into the sewer until the chloride level is reduced, however they will allow Bleachtech to continue using village hydrants to flush out ditches. OH EPA will continue to supervise clean-up efforts.
0282857639 2009-06-16 Solution Mining Project No Violations Pull tubing today and replace with another string.Well in connected to the # 4
0305615049 2007-10-10 Solution Mining Project No Violations Arrive today to inspect well and found that rig is done and moved.Pit level and liner good.
0342791429 2010-05-03 Solution Mining Project No Violations Check wells and found them in operation.
0370733793 2007-09-22 Drill / Deepen / Reopen No Violations Arrive today to set surface casing .J.D.Drilling set 612 ft. of 8 5.8 casing c/w 340 sks Petroset - Paul -Rich
0396198285 2007-09-17 Drill / Deepen / Reopen No Violations Moving rig in today and should start drilling.Pit level and liner are good.
0422561536 2007-09-27 Drill / Deepen / Reopen No Violations J.D.Drilling is at 1500 ft. dusting on 7 7/8 hole.
0467786997 2008-07-18 Solution Mining Project No Violations Return to find that tubing is back in well and that they are back in operation.
0679334849 2007-09-19 Drill / Deepen / Reopen No Violations J.D.Drilling is at 250 on 12 1/4 surface hole.
0750950070 2007-09-17 Drill / Deepen / Reopen No Violations J.D.Drilling is movin rig in today to start on next well .Pit level and liners ok
0752222468 2007-10-11 Solution Mining Project No Violations Arrive today for M.I.T. test and also cement bond log.Test well to 500 P.S.I. For 15 minutes and test passed.Bond log looked good.
0794567658 2015-08-05 Solution Mining Project No Violations Visited location on 08/05/2015 to respond to a brine-release incident at Bleachtech. Reggie Brown (OH EPA) and Dan Shroyer (Fish and Wildlife Officer) also responded. Up to 20,000 gal of low saturation brine and mud was released from the return line to the well overnight due to a line part. The brine traveled south from Bleachtech to the neighboring property, then west to Ryan Rd., then south through the ditch along Ryan Rd., before crossing under Ryan Rd. and the railroad tracks through a culvert and into the pond at the Creco Corp. Vacuum trucks were on-site, and containment had been placed throughout the ditches. A bladder was installed on the east side of the road. The plan is to plug off drainage at the catch basin on the west side of the railroad tracks; they also plan to move the bladder to the west side of the road to block off the flow to the pond, and also to flush and suck out the ditches. Samples collected from several spots along Ryan Rd. as well as the pond maxed out both the low and high range Quantab tests. Will continue to assist OH EPA with clean-up efforts.
0824728567 2007-09-21 Drill / Deepen / Reopen No Violations J.D.Drilling is at 350 ft. on 12 1/4 surface hole and should be ready to set surface on Friday.
0924985950 2007-10-08 Solution Mining Project No Violations J.D.Drilling set 2438 ft. of 4 inch casing c/w 600 sks.Petroset
0998397499 2007-10-05 Solution Mining Project No Violations Arrive to run casing again and J.D.Drilling could not get casing to bottom. After circulating still could not get casing to bottom.
1029019195 2007-09-20 Solution Mining Project No Violations J.D.Drilling is at 350 ft on 12 1/4 hole.
1124937055 2007-09-22 Drill / Deepen / Reopen No Violations J.D.Drilling set 612 ft. 8 5/8 casing c/w 340 sks - Petroset - Rich
1172526615 2010-06-08 Preliminary Restoration No Violations Priliminary restoration has been passed but service rig has been back so some restoration work in needed. Service rig is scheduled back again around the 4 th of July so after that .
1199279956 2007-10-03 Drill / Deepen / Reopen No Violations Log well after J.D.Drilling laid down drill string . Then could not run 41/2 inch casing because it was too long for the rig to run.J.D is to bring out another rig to run casing.
1292693462 2017-12-01 Solution Mining Project No Violations I found the injection well shut-in and a Bishop Well Service rig parked next the well on the day of my inspection. There was no one on site. There is an identification sign displayed on a steel post next to the well. There are no problems noted at this time.
1331830736 2012-02-16 Solution Mining Project No Violations Davis Well Service is working on this well today. The tubing needs to be set deeper since the roof collapse ripped off at least two of the bottom joints of tubing.
1339537583 2012-10-03 Solution Mining Project No Violations On location to conduct a Water-Brine Interface Mechanical Integrity test.
1340160076 2007-11-29 Solution Mining Project No Violations Check well and found pits closed and area graded.
1366824042 2007-09-21 Drill / Deepen / Reopen No Violations Called and scheduled job for 10 and during trip to site job was cancelled .
1422158432 2007-09-21 Drill / Deepen / Reopen No Violations Travel to site for cement job and found on route that it is cancelled for today.
1428722431 2015-08-17 Solution Mining Project No Violations Visited location on 08/17/2015 to follow-up on status of brine leak clean-up. Bleachtech staff are still in the process of removing contaminated soil from the Robot Co. property to the south of Bleachtech. Reggie Brown (OH EPA) wants removal of contaminated soil to be completed by Thursday 08/20/2015.
1516194697 2018-01-16 Solution Mining Project No Violations I was on location for a Mechanical Integrity Test (MIT) with Bleach Tech #3 as the test well and Bleach Tech LDJ Seville LTD #7 as the reference well. The 8 hour test began at 0800 and ended at 1600 with readings taken hourly. The initial pressure difference was 39.539 psi and the last pressure difference was 40.191 resulting in a failed test with a Net Pressure Change (NPC) of -0.08. The well will be retested after 2/29/2018.
1517579470 2018-02-01 Solution Mining Project No Violations I was on location for a Mechanical Integrity Test (MIT) with Bleach Tech #3 as the test well and Bleach Tech LDJ Seville LTD #7 as the reference well. The 8 hour test began at 0815 and ended at 1615 with readings taken hourly. The initial pressure difference was 45.222 psi and the last pressure difference was 45.367 resulting in a passing test with a Net Pressure Change (NPC) of -0.02.
1564998696 2007-11-07 Solution Mining Project No Violations Met operator on site today and placed 5 sacks dry cement on the backside of 8 inch to firm casing up.
1666927655 2012-02-17 Solution Mining Project No Violations I checked on the Davis service rig and found that they are running tubing back in the hole. They should be able to get to same depth as before the roof collapse, or below.
1711474922 2007-09-19 Drill / Deepen / Reopen No Violations J.D.Drilling is at 250 ft. on 12 1/4 surface hole.
1743497695 2012-04-04 Solution Mining Project No Violations I was on site today to witness the attempt to run a downhole camera in this well, after the tubing had been pulled. The tubing was cut off from a roof collapse this same day. They were unable to get camera down this well either.
1802046586 2007-09-27 Drill / Deepen / Reopen No Violations J.D.Drilling is at 1500 ft. dusting on 7 7/8 hole.
1856862328 2015-08-06 Solution Mining Project No Violations Visited location on 08/06/2015 to follow-up on brine leak clean-up progress. Clean-up continues. One vacuum truck was left onsite overnight and second truck was expected later in the morning to continue cleaning up. The bladder was removed from the catch basin behind the Creco Corp.
1870585185 2018-03-30 Solution Mining Project No Violations I found the injection well in operation on the day of my inspection. There is an identification sign displayed on a steel post next to the well. There are no problems noted at this time.
1894969554 2015-08-19 Solution Mining Project No Violations Visited location on 08/19/2015 to check on status of brine spill clean-up. 16 loads of topsoil were removed and stockpiled on-site (on Bleachtech property). Trees and brush along the southern border of the Bleachtech property are scheduled to be cut down and removed later in the day.
1945902250 2008-03-21 Solution Mining Project No Violations Well is in operation. Equipped with tubing and flow lines. GPS location.
2018253214 2008-09-10 Preliminary Restoration No Violations Needs more vegetaion established on entire well site.Met with field man and advise more vegetation.
2122494012 Solution Mining Project No Violations I checked this well to see if the tubing had been re-installed. I found the tubing back in the well and pressure on the casing.
2134337292 2007-10-01 Drill / Deepen / Reopen No Violations J.D.Drilling is at 2200 ft. on 7 7/8 hole.Should finish up on Weds.
226684413 2015-8-7 0:00:0 SM No Violations
282857639 2009-6-16 0:00: SM No Violations 3.00
342791429 2010-5-3 0:00:0 SM No Violations 0.70
35282265 2008-7-17 0:00: SM No Violations 3.70
370733793 2007-9-22 0:00: DD No Violations 6.00
396198285 2007-9-17 0:00: DD No Violations 1.50
422561536 2007-9-27 0:00: DD No Violations 2.00
467786997 2008-7-18 0:00: SM No Violations 2.20
752222468 2007-10-11 0:00 SM No Violations 6.00

For data sources see[4]

References