X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-103-25032

Well Details

Well ID: 34-103-25032
Loading map...
Country: United States
State: Ohio
County: Medina
Municipality: Westfield Township
Operator Name: OHIO VALLEY ENERGY SYSTEMS COR
Well Pad ID:
Farm/Lease Name: CHURCH AT THE LAKE UNIT
License Status: Producing
License Date: 2010-06-01
Spud Date: 2010-08-17
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2010-08-24
Well Total Depth: 5548.00 ft
Configuration: Vertical
Latitude: 41.060000
Longitude: -81.900000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2009-03-31 Proposed Formations:OHIO SHALE THRU TREMPEALEAU, Issued Date:3/31/2009, Expired Date:3/31/2010 6:00:00 AM, Drilling unit acres:41.72, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2010-06-01 Proposed Formations:OHIO SHALE THRU TREMPEALEAU, Issued Date:6/1/2010, Expired Date:6/1/2011 6:00:00 AM, Drilling unit acres:41.72, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2010-08-24
Plugged Back 2010-08-25
Completion Report Received 2010-12-09
Construction Permit Expires 2011-06-01
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2011-03-25 3178 3184 18
3178 3184 18
3178 3184 18

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2010-09-07 H2O 15 56305 Gal 30000 Universal Well Services Inc.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 OHIO VALLEY ENERGY SYSTEMS COR 0.00 0.00 0
2014 OHIO VALLEY ENERGY SYSTEMS COR 0.00 0.00 0
2015 OHIO VALLEY ENERGY SYSTEMS COR 0.00 0.00 0
2016 OHIO VALLEY ENERGY SYSTEMS COR 0.00 0.00 0
2017 OHIO VALLEY ENERGY SYSTEMS COR 0.00 0.00 0
2018 OHIO VALLEY ENERGY SYSTEMS COR 0.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 OHIO VALLEY ENERGY SYSTEMS COR Brine 0 0
2014 OHIO VALLEY ENERGY SYSTEMS COR Brine 0 0
2015 OHIO VALLEY ENERGY SYSTEMS COR Brine 0 0
2016 OHIO VALLEY ENERGY SYSTEMS COR Brine 0 0
2017 OHIO VALLEY ENERGY SYSTEMS COR Brine 0 0
2018 OHIO VALLEY ENERGY SYSTEMS COR Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-103231701 2015-5-21 0:00: PW No Violations
0103231701 2015-05-21 Production Wells No Violations Inspected production well on 05/21/2015. The tank battery consists of 1-100 bbl steel tank, 1-2,100 gal plastic tank, and 1-horizontal separator located within an earthen dike. The diked area is located within a locked metal privacy fence. The well is a rabbit well located within a locked metal privacy fence. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection.
1121342251 2009-06-10 Drill / Deepen / Reopen No Violations Inspect drilling location prior to rig entry. Well will be located near town of Gloria Glens east of Chippewa Lake.
1282043036 2010-08-16 Drill / Deepen / Reopen No Violations Rigging up on location. Requested by Dale of Ohio Valley Energy to inspect pit construction in peat area. Medina County advises this is a flood plain. Maps indicate it is not in flood plain. Dug 8 deep on west side of rig and encountered wet area in peat at 4. Under peat is clay. Dug and constructed earthen pits and lined with re-enforced pit liners. Wildcat Drilling is the contractor. Location is between two housing developments north of Gloria Glens and south of old Chippawa Lake Park. Houses to north are 150. Blow pit is constructed west of houses.
1282228622 2010-08-18 Drill / Deepen / Reopen No Violations Blowout Preventor Test ( BOP ). Pumped up nitrogen pressure to 660 psi. and 0psi drop in 1/2 hour. Closed ram and released. BOP working. Gave permission to begin drilling at 9:30 pm. Surface cement plug down at 9:30 am. Sun,80 degrees.
1283430310 2010-09-02 Preliminary Restoration No Violations Drilling pits solidification. S&H Water Service pumped brine from pits. Mixed in 3 trailer loads of kiln dust. Covered with top soil. Advised company , do not bury stumps. Do not have a landowner waiver. Sun, 85 degrees.
1285245288 2010-09-23 Production Wells No Violations Well is fraced and production equipment on well. Tank battery is under construction. Location needs finished graded. Fog, 60 degrees.
1300810196 2011-03-22 Preliminary Restoration No Violations Restoration approved. Fences are installed around well and tank battery. No violations.
1852840302 2013-11-14 Production Wells No Violations Inspected production well on 11/14/2013. Tank battery consists of 1-100 bbl tank, 1-50 bbl plastic tank, and a production unit within an earthen dike, located inside of a locked metal fence. Well is equipped with a threaded wellhead within a locked metal fence. Well identification is posted at both the tank battery and the wellhead. No problems were noted at the time of the inspection.

For data sources see[9]

References