X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-103-60247

Well Details

Well ID: 34-103-60247
Loading map...
Country: United States
State: Ohio
County: Medina
Municipality: Chatham Township
Operator Name: HARLEY DRILLING & PRODUCING LT
Well Pad ID:
Farm/Lease Name: ROWE M R
License Status: Producing
License Date: 1990-10-17
Spud Date: 1900-01-01
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth:
Configuration: Vertical
Latitude: 41.090000
Longitude: -82.010000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Change of Owner 2004-05-24 Operator changed from 475, R & E ENTERPRISES to 337, HARLEY DRILLING & PRODUCI
Record Last Modified 2014-01-06

For data sources see[2]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1991 R & E ENTERPRISES 0.00 205.00 365
1992 HARLEY DRILLING & PRODUCING LT 0.00 76.00 365
1993 HARLEY DRILLING & PRODUCING LT 0.00 125.00 365
1994 HARLEY DRILLING & PRODUCING LT 0.00 152.00 365
1995 HARLEY DRILLING & PRODUCING LT 0.00 76.00 365
1996 HARLEY DRILLING & PRODUCING LT 0.00 162.00 365
1997 HARLEY DRILLING & PRODUCING LT 0.00 78.00 365
1998 HARLEY DRILLING & PRODUCING LT 0.00 77.00 365
1999 HARLEY DRILLING & PRODUCING LT 0.00 0.00 365
2000 HARLEY DRILLING & PRODUCING LT 0.00 75.00 365
2001 HARLEY DRILLING & PRODUCING LT 0.00 0.00 365
2002 HARLEY DRILLING & PRODUCING LT 0.00 159.00 365
2003 HARLEY DRILLING & PRODUCING LT 0.00 0.00 365
2004 HARLEY DRILLING & PRODUCING LT 0.00 0.00 365
2005 HARLEY DRILLING & PRODUCING LT 0.00 81.00 365
2006 HARLEY DRILLING & PRODUCING LT 0.00 79.00 365
2007 HARLEY DRILLING & PRODUCING LT 0.00 79.00 365
2008 HARLEY DRILLING & PRODUCING LT 0.00 0.00 365
2009 HARLEY DRILLING & PRODUCING LT 0.00 0.00 365
2010 HARLEY DRILLING & PRODUCING LT 2.00 2.00 365
2011 HARLEY DRILLING & PRODUCING LT 0.00 0.00 365
2012 HARLEY DRILLING & PRODUCING LT 0.00 103.00 366
2013 HARLEY DRILLING & PRODUCING LT 0.00 109.00 365
2014 HARLEY DRILLING & PRODUCING LT 0.00 0.00 365
2015 HARLEY DRILLING & PRODUCING LT 0.00 53.00 365
2016 HARLEY DRILLING & PRODUCING LT 0.00 0.00 365
2017 HARLEY DRILLING & PRODUCING LT 0.00 0.00 365
2018 HARLEY DRILLING & PRODUCING LT 0.00 0.00 365

For data sources see[3] [4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1991 R & E ENTERPRISES Brine 0 365
1992 HARLEY DRILLING & PRODUCING LT Brine 0 365
1993 HARLEY DRILLING & PRODUCING LT Brine 38 365
1994 HARLEY DRILLING & PRODUCING LT Brine 147 365
1995 HARLEY DRILLING & PRODUCING LT Brine 150 365
1996 HARLEY DRILLING & PRODUCING LT Brine 75 365
1997 HARLEY DRILLING & PRODUCING LT Brine 40 365
1998 HARLEY DRILLING & PRODUCING LT Brine 0 365
1999 HARLEY DRILLING & PRODUCING LT Brine 0 365
2000 HARLEY DRILLING & PRODUCING LT Brine 0 365
2001 HARLEY DRILLING & PRODUCING LT Brine 0 365
2002 HARLEY DRILLING & PRODUCING LT Brine 0 365
2003 HARLEY DRILLING & PRODUCING LT Brine 0 365
2004 HARLEY DRILLING & PRODUCING LT Brine 0 365
2005 HARLEY DRILLING & PRODUCING LT Brine 0 365
2006 HARLEY DRILLING & PRODUCING LT Brine 56 365
2007 HARLEY DRILLING & PRODUCING LT Brine 0 365
2008 HARLEY DRILLING & PRODUCING LT Brine 0 365
2009 HARLEY DRILLING & PRODUCING LT Brine 0 365
2010 HARLEY DRILLING & PRODUCING LT Brine 2 365
2011 HARLEY DRILLING & PRODUCING LT Brine 6 365
2012 HARLEY DRILLING & PRODUCING LT Brine 84 366
2013 HARLEY DRILLING & PRODUCING LT Brine 70 365
2014 HARLEY DRILLING & PRODUCING LT Brine 0 365
2015 HARLEY DRILLING & PRODUCING LT Brine 20 365
2016 HARLEY DRILLING & PRODUCING LT Brine 0 365
2017 HARLEY DRILLING & PRODUCING LT Brine 0 365
2018 HARLEY DRILLING & PRODUCING LT Brine 0 365

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0281356640 2014-05-29 Production Wells No Violations Inspected production well on 05/29/2014. The tank battery consists of 3-100 bbl steel tanks located within an earthen dike. The well is equipped with a pump jack with an electric motor. No well identification is posted at either the tank battery or the wellhead (both are required as the tank battery is utilized by multiple wells). Some oil and paraffin were noted on the ground around the wellhead and will need to be cleaned up. Steve Harley with Harley Drilling was notified of these issues and will address them as soon as possible. No other problems were noted at the time of the inspection.
281356640 2014-5-29 0:00: PW No Violations

For data sources see[7]

References