Well ID: 34-105-23629 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.14,"lon":-82.29,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Meigs | |
Municipality: Columbia Township | |
Operator Name: ECLIPSE RESOURCES-OHIO LLC | |
Well Pad ID: | |
Farm/Lease Name: BILLY TROUT | |
License Status: Final Restoration | |
License Date: 2014-12-22 | |
Spud Date: 2008-12-18 | |
Spud Drilling Contractor: TEMPLE OIL & GAS | |
Final Drill Date: 2009-01-27 | |
Well Total Depth: 1603.00 ft | |
Configuration: Vertical | |
Latitude: 39.140000 | |
Longitude: -82.290000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-05-27 | Proposed Formations:BIG INJUN THRU OHIO SHALE, Issued Date:5/27/2008, Expired Date:5/27/2009 6:00:00 AM, Drilling unit acres:43.3, Proposed Well Type:OG, Proposed Well Class:EW |
Reached Total Depth | 2009-01-27 | |
Completion Report Received | 2009-06-30 | |
Change of Owner | 2014-12-16 | Operator changed from 79, OXFORD OIL to 9216, ECLIPSE RESOURCES-OHIO LLC |
APP | 2014-12-22 | Proposed Formations:OHIO SHALE, Issued Date:12/22/2014, Expired Date:12/21/2016 12:00:00 PM, Drilling unit acres:43.3, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2015-02-11 | |
Record Last Modified | 2015-09-24 | |
Construction Permit Expires | 2016-12-21 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2009-10-13 | 1274 | 1286 | 10 |
2009-10-13 | 1316 | 1468 | 32 |
1274 | 1286 | 10 | |
1316 | 1468 | 32 | |
1274 | 1286 | 10 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2401 Bbl | 30000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | OXFORD OIL | 0.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | OXFORD OIL | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-125942786 | 2009-4-2 0:00:0 | PB | No Violations | |
-1279345312 | 2015-6-22 0:00: | FR | No Violations | 2.00 |
-1463277657 | 2009-4-3 0:00:0 | PB | No Violations | |
-2124081801 | 2015-4-9 0:00:0 | PB | No Violations | 2.20 |
-2146789461 | 2015-2-10 0:00: | PB | No Violations | |
-539807227 | 2015-4-7 0:00:0 | PB | No Violations | 0.60 |
-628356832 | 2015-6-15 0:00: | FR | No Violations | 0.80 |
0030003656 | 2009-01-06 | Drill / Deepen / Reopen | No Violations | Surface cement job was cancelled, due to bad casing and bad weather. |
0081471277 | 2015-02-02 | Plug / Plug Back | No Violations | Crew arrives to begin cleaning out hole. The pit liner had fallen in many places and will need to be stabilized and relined before cleaning out the hole can begin. |
0125942786 | 2009-04-02 | Plug / Plug Back | No Violations | Contractor washed bottom plug into the well. |
0446104015 | 2015-02-20 | Plug / Plug Back | No Violations | There is equipment on site and the pits are still open. |
0539807227 | 2015-04-07 | Plug / Plug Back | No Violations | I stopped by the site to check on the pit closure for the final restoration of the plug job. The pit was still full of water and in places was above ground level and being held back only by the earthen berm around the pit that was constructed under the liner. I contacted Mike hartshorn of Eclipse resourceand recommended removing the water from the pit to prevent a spill over due to the forecasted rain. |
0628356832 | 2015-06-15 | Final Restoration | No Violations | Follow up to 1304499420. Final Restoration requirements met. Pit filled, no erosion on site, no equipment, area has been seeded and mulched. |
0754159657 | 2009-01-07 | Drill / Deepen / Reopen | No Violations | Witnessed installation and cementing of surface casing. |
0804545603 | 2009-04-06 | Plug / Plug Back | No Violations | Contractor was attempting to rip production casing. |
0893429752 | 2015-02-06 | Plug / Plug Back | No Violations | Tripping out of hole to change bit. Drilled down to 336 feet yesterday. |
1140568676 | 2015-01-28 | Plug / Plug Back | No Violations | Unloading equipment and getting rigged up. The power swivel will be brought in tomorrow and the company should be starting cleaning out the well soon. |
1218284707 | 2014-12-01 | Preliminary Restoration | No Violations | Preliminary restoration requirements met. Well was a lost hole and plugged before skidding the rig. |
1239126154 | 2009-01-05 | Drill / Deepen / Reopen | No Violations | Cable-tool rig was drilling at 455 feet. All conditions were acceptable. |
1279345312 | 2015-06-22 | Final Restoration | No Violations | On the date of inspection I found the site to have been restored to 1509.072 standards and regulations. I passed the final restoration at this time. |
1304499420 | 2014-12-01 | Plug / Plug Back | No Violations | A large scald area roughly 30x 5 was found at the GPS location for the plugged well. Small bubbles were seen leaking from the uphill part of the scald area. A Quantab Field Test strip was used and the standing water in the scald are was found to have 1550 ppm Cl- content. Pictures and GPS taken. I met with Mark of Eclipse (Oxford) at the site and we discussed cleaning out the wellbore and re-plugging the well. |
1319561252 | 2014-12-02 | Non Well | No Violations | Met with Field Representative at Eclipse to discuss plugging the well. |
1422647866 | 2015-01-30 | Drill / Deepen / Reopen | No Violations | Not working baby. |
1422994302 | 2015-02-03 | Plug / Plug Back | No Violations | Cleaning out well with power swivel. Currently down to 30 feet, wood was encountered around 15 feet. |
1423506297 | 2015-02-09 | Plug / Plug Back | No Violations | Cleaning out hole at 550 feet while I was on site this morning. I received a call from Tom White of Eclipse letting me know the power swivel had encountered resistance around 384 feet. |
1423745399 | 2015-02-11 | Plug / Plug Back | No Violations | Witnessed plugging operations. Tubing was ran to 576 feet, circulation was established and the hole was treated with gel and LCM, then 61 sacks of Class A neat cement with a 2% CaCl- was placed from 576 to 376. The tubing was pulled up and the plug was allowed to set up for roughly 2 hours. Tubing was ran back down in an attempt to tag the plug but was unsuccessful. The tubing was pulled and the sandline was ran, the tag was plugged at 481 feet. |
1423771970 | 2015-02-12 | Plug / Plug Back | No Violations | Checked cement top, about three feet below ground level. |
1463277657 | 2009-04-03 | Plug / Plug Back | No Violations | Contractor finished washing bottom plug into the well. Started ripping on the production casing. |
1703871068 | 2009-04-09 | Plug / Plug Back | No Violations | Contractor finished plugging the well. There were three ton of clay left over. |
1855540204 | 2015-02-11 | Plug / Plug Back | No Violations | Witnessed plugging operations. Tubing was ran back down to 448 and 30 sacks was placed from 448-348. Tubing pulled up to 220 and 79 sacks was circulated to the surface. |
2124081801 | 2015-04-09 | Plug / Plug Back | No Violations | The pit has been drained and closed. |
2146789461 | 2015-02-10 | Plug / Plug Back | No Violations | |
30003656 | 2009-1-6 0:00:0 | DD | No Violations | |
446104015 | 2015-2-20 0:00: | PB | No Violations | 0.80 |
754159657 | 2009-1-7 0:00:0 | DD | No Violations | |
804545603 | 2009-4-6 0:00:0 | PB | No Violations | |
81471277 | 2015-2-2 0:00:0 | PB | No Violations | 4.50 |
893429752 | 2015-2-6 0:00:0 | PB | No Violations | 3.00 |
For data sources see[9]