If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-105-23670 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.06,"lon":-82.31,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Meigs | |
Municipality: Salem Township | |
Operator Name: DIVERSIFIED PRODUCTION LLC | |
Well Pad ID: | |
Farm/Lease Name: PUCKETT FRANK | |
License Status: Producing | |
License Date: 2011-01-18 | |
Spud Date: 2011-01-30 | |
Spud Drilling Contractor: G & L DRILLING | |
Final Drill Date: 2011-02-18 | |
Well Total Depth: 5220.00 ft | |
Configuration: Vertical | |
Latitude: 39.060000 | |
Longitude: -82.310000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-01-18 | Proposed Formations:BEREA THRU TRENTON, Issued Date:1/18/2011, Expired Date:1/17/2013 12:00:00 PM, Drilling unit acres:124.85, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2011-02-18 | |
Construction Permit Expires | 2013-01-17 | |
Change of Owner | 2014-02-06 | Operator changed from 79, OXFORD OIL to 9216, ECLIPSE RESOURCES-OHIO LLC |
Completion Report Received | 2015-11-06 | |
Change of Owner | 2016-08-02 | Operator changed from 9216, ECLIPSE RESOURCES-OHIO LLC to 8685, M & R INVESTMENTS OHIO LLC |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-11-06 | 3568 | 3590 | 25 |
3568 | 3590 | 25 | |
3568 | 3590 | 25 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2011-08-29 | H2O | 15 | 2793 Bbl | 30000 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | OXFORD OIL | 724.00 | 0.00 | 0 |
2012 | OXFORD OIL | 1226.00 | 0.00 | 0 |
2013 | ECLIPSE RESOURCES-OHIO LLC | 237.00 | 0.00 | 365 |
2014 | ECLIPSE RESOURCES-OHIO LLC | 91.00 | 0.00 | 365 |
2015 | ECLIPSE RESOURCES-OHIO LLC | 67.00 | 0.00 | 365 |
2016 | M & R INVESTMENTS OHIO LLC | 0.00 | 0.00 | 365 |
2017 | M & R INVESTMENTS OHIO LLC | 13.00 | 0.00 | 365 |
2018 | M & R INVESTMENTS OHIO LLC | 14.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | OXFORD OIL | Brine | 4834 | |
2012 | OXFORD OIL | Brine | 3120 | |
2013 | ECLIPSE RESOURCES-OHIO LLC | Brine | 1200 | 365 |
2014 | ECLIPSE RESOURCES-OHIO LLC | Brine | 400 | 365 |
2015 | ECLIPSE RESOURCES-OHIO LLC | Brine | 0 | 365 |
2016 | M & R INVESTMENTS OHIO LLC | Brine | 0 | 365 |
2017 | M & R INVESTMENTS OHIO LLC | Brine | 0 | 365 |
2018 | M & R INVESTMENTS OHIO LLC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1248448399 | 2011-2-9 0:00:0 | DD | No Violations | |
-1416768945 | 2011-2-7 0:00:0 | DD | No Violations | |
-1780302432 | 2012-2-6 0:00:0 | PL | No Violations | 0.50 |
-344667852 | 2011-8-22 0:00: | CT | No Violations | 1.70 |
-698571133 | 2011-2-23 0:00: | DD | No Violations | |
0337326087 | 2011-02-10 | Drill / Deepen / Reopen | No Violations | G&L Drilling BOP test. Accompanied by Josh Garland MRI 1. |
0344667852 | 2011-08-22 | Completion Testing | No Violations | Witnessed bond log. Perf Clinton at 3626 feet. Plan to cement tomorrow. |
0698571133 | 2011-02-23 | Drill / Deepen / Reopen | No Violations | TD 5220 feet. 6 1/4 hole. Logged hole two times. 2nd log could only get to 4400. Running drill stem with bit to try and clean out to TD. G&L Rig is having mechanical problems. Pit liner has fallen in where 6 mud pump line enters the drill pit. Mud pit liner has fallen in on one side. I called Jack green and Randy Rainer about the pit liner issues. Randy told me it will get fixed. Took pictures. |
1248448399 | 2011-02-09 | Drill / Deepen / Reopen | No Violations | Surface cement job. Spud 1-31-11. 60 conductor cemented on 2-7-11. TD 1530 in a 8 3/4 hole. Ran 1489 of 7 casing (9joints 17 lb used casing, The remaining casing new 15.5 lb, 47 joints total.) Circulate water to surface prior to pumping cement. Good circulation while pumping cement. Gel returns to surface after wiper plug released. Slight cement returns to surface mixed with gel. |
1314215667 | 2011-08-24 | Production Wells | No Violations | Witnessed squeeze job. Bottom plug tagged at 3629 and casing perforated from 3626-3626. 45 sacks class A cement with 50 lb accelerator. Top of cement squeeze at 3575. |
1416768945 | 2011-02-07 | Drill / Deepen / Reopen | No Violations | G&L Drilling. Cement Conductor in place. Originally mudded in conductor. 60 feet of 9 5/8 conductor set in a 15 hole. Drilled to TD 300 feet with 8 3/4 hole. Conductor is loose and cuttings are blowing out around outside of conductor. Pumped gel and cottonseed hulls from 300 to surface then pumped cement down conductor and circulated cement to surface. Flow line has been ran to 2nd pit. Flow line is 10 too short and does not have fitting on end to direct cuttings into pit. Cuttings are blowing down side of pit and collecting on mud bank at the opposite end of the pit. I talked to Randy Rainer and he told me that the flow line will be extended and a fitting installed on the end of the flow line to direct the cuttings into the pit. 1st pit liner has been fixed and is being used as a mud pit. |
1500999581 | 2011-02-02 | Drill / Deepen / Reopen | No Violations | Have spudded, set 60 feet of conductor. Pit liner is overlapped and cannot contain fluids. I have talked to Randy Rainer (tool pusher) and he is going to re line the pit. There are two pits on location. 1) has the overlapped liner and the flow line has been ran to it. 2) is not lined and is located further away from the rig. Randy told me that the night driller had some confusion about the pits and ran the flow line to the wrong pit. The 2nd pit is to be lined and it will be the drill pit. The 1st pit is to be used as a mud pit. Lease road is muddy and flowing run off onto Legion Road. Took pictures. I talked to Randy and they are cleaning mud from the road with a front end loader. |
1780302432 | 2012-02-06 | Preliminary Restoration | No Violations | Preliminary restoration. The pit is closed, the ground has been graded and seeded. There is no vegetative cover yet. There is no erosion along the road or at the wellhead. There is no drilling equipment on the site. The tank battery has a two 100 barrel tanks and a separator. The well is equipped with a pumping unit and a gasoline engine. |
337326087 | 2011-2-10 0:00: | DD | No Violations |
For data sources see[9]