{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.13,"lon":-81.91,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Meigs | |
Municipality: Orange Township | |
Operator Name: MOUNTAINEER STATE OPERATIONS L | |
Well Pad ID: | |
Farm/Lease Name: BERNARD JAMES & ELNORA | |
License Status: Producing | |
License Date: 2011-03-02 | |
Spud Date: 2011-09-12 | |
Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC | |
Final Drill Date: 2011-11-01 | |
Well Total Depth: 1999.00 ft | |
Configuration: Vertical | |
Latitude: 39.130000 | |
Longitude: -81.910000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-03-02 | Proposed Formations:BEREA, Issued Date:3/2/2011, Expired Date:3/1/2013 12:00:00 PM, Drilling unit acres:10, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2011-11-01 | |
Construction Permit Expires | 2013-03-01 | |
Completion Report Received | 2015-10-08 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-10-09 | 1840 | 1850 | 0 |
1840 | 1850 | 0 | |
1840 | 1850 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1200 Bbl | 0 | Universal Well Services Inc. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | MOUNTAINEER STATE OPERATIONS L | 919.00 | 1029.00 | 366 |
2013 | MOUNTAINEER STATE OPERATIONS L | 986.00 | 986.00 | 365 |
2014 | MOUNTAINEER STATE OPERATIONS L | 1933.00 | 900.00 | 365 |
2015 | MOUNTAINEER STATE OPERATIONS L | 283.00 | 186.00 | 365 |
2016 | MOUNTAINEER STATE OPERATIONS L | 440.00 | 162.00 | 365 |
2017 | MOUNTAINEER STATE OPERATIONS L | 1.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | MOUNTAINEER STATE OPERATIONS L | Brine | 1000 | 366 |
2013 | MOUNTAINEER STATE OPERATIONS L | Brine | 9601 | 365 |
2014 | MOUNTAINEER STATE OPERATIONS L | Brine | 5790 | 365 |
2015 | MOUNTAINEER STATE OPERATIONS L | Brine | 0 | 365 |
2016 | MOUNTAINEER STATE OPERATIONS L | Brine | 0 | 365 |
2017 | MOUNTAINEER STATE OPERATIONS L | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1066939574 | 2017-3-15 0:00: | PW | No Violations | 1.00 |
-1151136903 | 2012-1-27 0:00: | PW | No Violations | 0.50 |
-1213877429 | 2011-9-13 0:00: | DD | No Violations | 3.50 |
-1853011790 | 2011-9-13 0:00: | DD | No Violations | 3.50 |
-1996475733 | 2012-1-23 0:00: | DD | No Violations | |
-2064669775 | 2012-6-11 0:00: | PL | No Violations | 0.50 |
-356720151 | 2011-9-19 0:00: | DD | No Violations | 0.50 |
-878328239 | 2012-2-2 0:00:0 | PW | No Violations | 1.00 |
0039964713 | 2011-09-07 | Drill / Deepen / Reopen | No Violations | Predrilling site review with Tom Stone of Mountaineer State Oper LLC. Well appx 150 feet from driveway and 100 feet from barn. |
0140602922 | 2012-02-23 | Preliminary Restoration | No Violations | The pit is still open but being drained. |
0193578895 | 2012-03-02 | Preliminary Restoration | No Violations | The pits have been closed. The dozers are being moved to the next restoration. |
0194341475 | 2012-02-13 | Preliminary Restoration | No Violations | The pit is still open. |
0356720151 | 2011-09-19 | Drill / Deepen / Reopen | No Violations | Checking on pit level. Close to top due to rain, spoke with Tom Stone of Mountaineer State and will drain soon. |
0745062078 | 2012-01-24 | Production Wells | No Violations | Inspected well site with Josh Garland MRI and Gene Chini Oil and Gas Supervisor. Drill pit is open. Pit liner has fell into pit in multiple places. A 2 inch black plastic line has been installed between the drill pit and a 100 barrel steel production tank drain. The tank drain is equipped with a 2 inch valve, a 2 inch 90 degree elbow, a 2 inch clear plastic nipple, 2 inch steel hammer union connected to the 2 inch black plastic line that extends to the drill pit. Water was discharging from the 2 inch line into the pit. A sample was taken and sent to the lab for analysis. A High Range Quantab was placed in the discharge water and the brine exceeded 6797 parts per million chloride. Informed Tom Stone and John Kent of Mountaineer to stop discharging brine into the pit and to disconnect the 2 inch line. Also told Tom and John to pump out the pit and take the fluids to an approved salt water injection well for disposal. Then close the pit. |
0878328239 | 2012-02-02 | Preliminary Restoration | No Violations | The Frac Tank has been removed, the pits are still open, a water knock-out has been installed, and a second saltwater tank has been installed. |
0911389177 | 2011-09-13 | Annular Disposal | No Violations | John Kent called and scheduled a Annular Disposal Mechanical Integrity Test (Fresh Water Test) on the surface casing. Test pressure 365 psi. Tested three times and test failed each time. Last test had bubbles around casing at the surface. Last test lost 70 psi in 15 minutes. |
0947368407 | 2012-02-27 | Preliminary Restoration | No Violations | The smaller pit has been removed. The larger pit has been drained and is being closed. |
1066939574 | 2017-03-15 | Production Wells | No Violations | Well is equipped with pumping unit, tubing, rods and an electric motor. The valves on the tubing string were closed and the polish rod had a haze on it from lack of recent activity. There is a domestic meter at the wellhead. The tank battery consists of 3-100 barrel steel tanks, a vertical separator, chart and meter. |
1149252533 | 2012-01-24 | Preliminary Restoration | Violations Noted | Preliminary restoration inspection. The pit was full of water and the liner had fallen down in places. The liner shall immediately be pulled up back into place. All pits used for drilling shall be closed two months after completion of the well. A two inch line was being run from the 210 barrel salt water tank into the pit. At the time of inspection a small amount of fluid was draining from the line and samples were taken. A high range Quan-tab test strip was used to test for Chloride levels in the water coming diectly fro the line and 6797+ parts per million Chlorides were noted. The line running from the salt water tanks to the pit shall immediately be disconnected and removed. |
1151136903 | 2012-01-27 | Preliminary Restoration | No Violations | The lines are disconnected, the ball valves on the bottom of the tanks are closed, and the frac tank is going to be removed. |
1213877429 | 2011-09-13 | Drill / Deepen / Reopen | No Violations | Administer BOP test for Bernard 167. 500 psi required, hold pressure and loose no more than 5% pressure over 15 minuets. Three tests administered and each failed. BOP not a permit condition, owner running BOP voluntarily, so drilling will continue. Blowline only 30 feet, so I suggested lengthening it. 10 extra feet there on site, so line was extended. |
1315845200 | 2011-09-12 | Drill / Deepen / Reopen | No Violations | Drilling status check. Currently at 270 feet, 12 1/4 surface casing borehole. Pit liner in good shape and pit of sufficient size to hold anticipated water. Mud pump also on site. |
1315939254 | 2011-09-13 | Drill / Deepen / Reopen | No Violations | Met with J. Scott to administer fresh water surface casing test. 365 psi required to hold for 15 minuets. Failed test 3 times. |
1316125020 | 2011-09-15 | Drill / Deepen / Reopen | No Violations | Witnessed Longstring cement job. 85 sacks of class A with 200 lb gel, 25 lb flake, and 2 qt. polymer. 7 inch casing inside 8 3/4 borehole. Note: well is permited to 1900, TD was 1999. Spoke with Steve Opritza and allowed company to continue. |
1329504836 | 2012-02-17 | Preliminary Restoration | No Violations | The pit is being emptied by the operator. |
1373987895 | 2012-02-06 | Preliminary Restoration | No Violations | The pits have not been emptied. |
140602922 | 2012-2-23 0:00: | PL | No Violations | 0.50 |
1853011790 | 2011-09-13 | Drill / Deepen / Reopen | No Violations | Witnessed surface cement job. 727 feet of new 9 5/8 cemented in 740 feet of 12 1/4 borehole. 100 sacks of 1 % gel ran ahead and 180 sacks of neat ran behind. 400 lb gel, 700 lb accelerator, 180lb LCM, and 2 qt. polymer. Circulation established, good cement returns, cement level stayed at top. |
193578895 | 2012-3-2 0:00:0 | PL | No Violations | 1.00 |
194341475 | 2012-2-13 0:00: | PL | No Violations | 0.30 |
1996475733 | 2012-01-23 | Drill / Deepen / Reopen | No Violations | Drill pit is open. Pit liner has fell into pit in multiple places. A 2 inch black plastic line has been installed between the drill pit and a 100 barrel steel production tank drain. The tank drain is equipped with a 2 inch valve, a 2 inch 90 degree elbow, a 2 inch clear plastic nipple, 2 inch steel hammer union connected to the 2 inch black plastic line that extends to the drill pit. Oil and Gas Supervisor Gene Chini is scheduled to see well site on 1-24-12. |
2064669775 | 2012-06-11 | Preliminary Restoration | No Violations | Area graded, seeded and mulcted, the pits are closed, and there is no erosion on site. |
2105829179 | 2012-04-27 | Preliminary Restoration | Violations Noted | Area has not been graded and vegetative cover has not been established. Area shall be graded and vegetative cover shall be established in order to prevent erosion. |
39964713 | 2011-9-7 0:00:0 | DD | No Violations | 0.50 |
745062078 | 2012-1-24 0:00: | PW | No Violations | |
911389177 | 2011-9-13 0:00: | AD | No Violations | |
947368407 | 2012-2-27 0:00: | PL | No Violations | 0.80 |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1149252533 | US-OH-103886 | 2012-01-25 | Failure to close drilling pits within two months | |
1149252533 | US-OH-103887 | 2012-01-25 | Unlawful use of pit for temporary storage of brine or other wastes | |
2105829179 | US-OH-121535 | 2012-04-27 | Failure to restore within six months |