Well Details

Well ID: 34-105-23710
Loading map...
Country: United States
State: Ohio
County: Meigs
Municipality: Columbia Township
Operator Name: BANCEQUITY PETROLEUM CORPORATI
Well Pad ID:
Farm/Lease Name: SPENCER GARY & KAREN
License Status: Producing
License Date: 2012-09-12
Spud Date: 2012-11-06
Spud Drilling Contractor: R WOLFE DRLG
Final Drill Date: 2012-11-09
Well Total Depth: 1375.00 ft
Configuration: Vertical
Latitude: 39.150000
Longitude: -82.250000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-09-12 Proposed Formations:BEREA, Issued Date:9/12/2012, Expired Date:9/12/2014 12:00:00 PM, Drilling unit acres:10, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2012-09-14 CORRECTION TO SURFACE LOCATION.
Reached Total Depth 2012-11-09
Completion Report Received 2013-10-07
Construction Permit Expires 2014-09-12
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-10-08 1244 1250 7
1244 1250 7
1244 1250 7

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-08-26 H2O 0 19628 Gal 4100 Producers Service Corporation Initial frac job on 8/26/13 sanded off, well was allowed to flow back over night. The sand was circulated out 8/27/13 and the frac job was re administed 8/27/13. Inspector did not witness entire operations on 8/27/13, record of chemical treatment not received.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 BANCEQUITY PETROLEUM CORPORATI 142.00 0.00 93
2014 BANCEQUITY PETROLEUM CORPORATI 3489.00 373.00 365
2015 BANCEQUITY PETROLEUM CORPORATI 3190.00 454.00 365
2016 BANCEQUITY PETROLEUM CORPORATI 2833.00 508.00 365
2017 BANCEQUITY PETROLEUM CORPORATI 2478.00 460.00 365
2018 BANCEQUITY PETROLEUM CORPORATI 2482.00 378.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 BANCEQUITY PETROLEUM CORPORATI Brine 1375 93
2014 BANCEQUITY PETROLEUM CORPORATI Brine 11870 365
2015 BANCEQUITY PETROLEUM CORPORATI Brine 14491 365
2016 BANCEQUITY PETROLEUM CORPORATI Brine 1354 365
2017 BANCEQUITY PETROLEUM CORPORATI Brine 1357 365
2018 BANCEQUITY PETROLEUM CORPORATI Brine 10945 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1970120189 2012-11-7 0:00: AM No Violations 0.30
0550708418 2012-12-27 Drill / Deepen / Reopen No Violations The pits have been closed for the 2 month restoration requirements.
1352281804 2012-11-07 Drill / Deepen / Reopen No Violations 90 sacks of class A cement were balanced into the bottom of 322 feet of mine string set in a 12 1/4 borehole. A basket was placed one joint above the top of the mine void and 105 sacks class A were grouted in between the 9 5/8 and the conductor. Returns were never seen at the surface. The fluid level will be checked tomorrow.
1352431618 2012-11-08 Drill / Deepen / Reopen No Violations Witnessed 901 feet of new 7 17 lb/ft surface casing set inside 322 feet of 9 5/8 minestring and 579 feet of 8 3/4 borehole with 145 sacks class A cement. Total surface casing hole depth was 910 feet. Good returns seen at surface with 11 Barrels of cement displaced. Cement top dropped less than 10 feet. Will grout on longstring.
1377548292 2013-08-26 Completion Testing No Violations During the frac job the well sanded off. The well was allowed to flow back into a pit for roughly 3 hours. Twice Producers service corp increased pressure to see if the flow back had allowed the sand to be released from the valves. Each the pressures reached 2000 psi and the pumps were shut down, each time the pressure bled off very rapidly. The well will be allowed to flow back over night and the job will continue tomorrow.
1381629776 2013-08-13 Drill / Deepen / Reopen No Violations No lines or equipment hooked up to well. There is a pumping unit and four steel 100 barrel tanks set in a dike on site. There are five frac tanks still on site. Well is scheduled to be fraced 8/26/13.
1408567043 2014-08-20 Preliminary Restoration No Violations Preliminary restoration complete.
1432775575 2013-08-27 Completion Testing No Violations Well sanded off durring the first half of the frac job yesterday and the job was shut down. after the well was allowed to flow back overnight jars were run in hole today and sand was tagged at 1133, 117 feet above the perfs. Tubing ran in hole and sand washed into lined pit at 1500 psi. The frac job was completed after I left the site.
1970120189 2012-11-07 Administrative Inspection No Violations I spoke with Randy Wolfe of R. Wolfe Oil & Gas and he let me know 9 5/8 had been grouted in with 2 1/2 yard of 9 sack grout. Returns were seen at the surface.
550708418 2012-12-27 0:00 DD No Violations 1.20