If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-105-23710 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.15,"lon":-82.25,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Meigs | |
Municipality: Columbia Township | |
Operator Name: BANCEQUITY PETROLEUM CORPORATI | |
Well Pad ID: | |
Farm/Lease Name: SPENCER GARY & KAREN | |
License Status: Producing | |
License Date: 2012-09-12 | |
Spud Date: 2012-11-06 | |
Spud Drilling Contractor: R WOLFE DRLG | |
Final Drill Date: 2012-11-09 | |
Well Total Depth: 1375.00 ft | |
Configuration: Vertical | |
Latitude: 39.150000 | |
Longitude: -82.250000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-09-12 | Proposed Formations:BEREA, Issued Date:9/12/2012, Expired Date:9/12/2014 12:00:00 PM, Drilling unit acres:10, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2012-09-14 | CORRECTION TO SURFACE LOCATION. |
Reached Total Depth | 2012-11-09 | |
Completion Report Received | 2013-10-07 | |
Construction Permit Expires | 2014-09-12 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-10-08 | 1244 | 1250 | 7 |
1244 | 1250 | 7 | |
1244 | 1250 | 7 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-08-26 | H2O | 0 | 19628 Gal | 4100 | Producers Service Corporation | Initial frac job on 8/26/13 sanded off, well was allowed to flow back over night. The sand was circulated out 8/27/13 and the frac job was re administed 8/27/13. Inspector did not witness entire operations on 8/27/13, record of chemical treatment not received. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | BANCEQUITY PETROLEUM CORPORATI | 142.00 | 0.00 | 93 |
2014 | BANCEQUITY PETROLEUM CORPORATI | 3489.00 | 373.00 | 365 |
2015 | BANCEQUITY PETROLEUM CORPORATI | 3190.00 | 454.00 | 365 |
2016 | BANCEQUITY PETROLEUM CORPORATI | 2833.00 | 508.00 | 365 |
2017 | BANCEQUITY PETROLEUM CORPORATI | 2478.00 | 460.00 | 365 |
2018 | BANCEQUITY PETROLEUM CORPORATI | 2482.00 | 378.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | BANCEQUITY PETROLEUM CORPORATI | Brine | 1375 | 93 |
2014 | BANCEQUITY PETROLEUM CORPORATI | Brine | 11870 | 365 |
2015 | BANCEQUITY PETROLEUM CORPORATI | Brine | 14491 | 365 |
2016 | BANCEQUITY PETROLEUM CORPORATI | Brine | 1354 | 365 |
2017 | BANCEQUITY PETROLEUM CORPORATI | Brine | 1357 | 365 |
2018 | BANCEQUITY PETROLEUM CORPORATI | Brine | 10945 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1970120189 | 2012-11-7 0:00: | AM | No Violations | 0.30 |
0550708418 | 2012-12-27 | Drill / Deepen / Reopen | No Violations | The pits have been closed for the 2 month restoration requirements. |
1352281804 | 2012-11-07 | Drill / Deepen / Reopen | No Violations | 90 sacks of class A cement were balanced into the bottom of 322 feet of mine string set in a 12 1/4 borehole. A basket was placed one joint above the top of the mine void and 105 sacks class A were grouted in between the 9 5/8 and the conductor. Returns were never seen at the surface. The fluid level will be checked tomorrow. |
1352431618 | 2012-11-08 | Drill / Deepen / Reopen | No Violations | Witnessed 901 feet of new 7 17 lb/ft surface casing set inside 322 feet of 9 5/8 minestring and 579 feet of 8 3/4 borehole with 145 sacks class A cement. Total surface casing hole depth was 910 feet. Good returns seen at surface with 11 Barrels of cement displaced. Cement top dropped less than 10 feet. Will grout on longstring. |
1377548292 | 2013-08-26 | Completion Testing | No Violations | During the frac job the well sanded off. The well was allowed to flow back into a pit for roughly 3 hours. Twice Producers service corp increased pressure to see if the flow back had allowed the sand to be released from the valves. Each the pressures reached 2000 psi and the pumps were shut down, each time the pressure bled off very rapidly. The well will be allowed to flow back over night and the job will continue tomorrow. |
1381629776 | 2013-08-13 | Drill / Deepen / Reopen | No Violations | No lines or equipment hooked up to well. There is a pumping unit and four steel 100 barrel tanks set in a dike on site. There are five frac tanks still on site. Well is scheduled to be fraced 8/26/13. |
1408567043 | 2014-08-20 | Preliminary Restoration | No Violations | Preliminary restoration complete. |
1432775575 | 2013-08-27 | Completion Testing | No Violations | Well sanded off durring the first half of the frac job yesterday and the job was shut down. after the well was allowed to flow back overnight jars were run in hole today and sand was tagged at 1133, 117 feet above the perfs. Tubing ran in hole and sand washed into lined pit at 1500 psi. The frac job was completed after I left the site. |
1970120189 | 2012-11-07 | Administrative Inspection | No Violations | I spoke with Randy Wolfe of R. Wolfe Oil & Gas and he let me know 9 5/8 had been grouted in with 2 1/2 yard of 9 sack grout. Returns were seen at the surface. |
550708418 | 2012-12-27 0:00 | DD | No Violations | 1.20 |
For data sources see[9]