X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-107-20217

Well Details

Well ID: 34-107-20217
Loading map...
Country: United States
State: Ohio
County: Mercer
Municipality: Gibson Township
Operator Name: BUCKEYE OIL PRODUCING CO
Well Pad ID:
Farm/Lease Name: HOMAN R & V
License Status: Final Restoration
License Date: 2015-04-03
Spud Date: 2013-04-29
Spud Drilling Contractor: POULSON DRILLING
Final Drill Date: 2013-05-03
Well Total Depth: 1823.00 ft
Configuration: Vertical
Latitude: 40.390000
Longitude: -84.730000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-04-15 Proposed Formations:TRENTON/TREMPEALEAU, Issued Date:4/15/2013, Expired Date:4/15/2015 12:00:00 PM, Drilling unit acres:10, Proposed Well Type:OG, Proposed Well Class:EW
Plugged Back 2013-05-03
Reached Total Depth 2013-05-03
Completion Report Received 2013-07-03
APP 2015-04-03 Proposed Formations:TRENTON, Issued Date:4/3/2015, Expired Date:4/2/2017 12:00:00 PM, Drilling unit acres:10, Proposed Well Type:OG, Proposed Well Class:
Construction Permit Expires 2017-04-02
Plugged/Abandoned 2017-04-19
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-07-08 1158 1176 16
1158 1176 16
1158 1176 16

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-05-20 ACID 15 1200 Gal 0 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 BUCKEYE OIL PRODUCING CO 0.00 0.00 214
2014 BUCKEYE OIL PRODUCING CO 0.00 48.00 214
2015 BUCKEYE OIL PRODUCING CO 0.00 0.00 214
2016 BUCKEYE OIL PRODUCING CO 0.00 0.00 214
2017 BUCKEYE OIL PRODUCING CO 0.00 0.00 109

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 BUCKEYE OIL PRODUCING CO Brine 0 214
2014 BUCKEYE OIL PRODUCING CO Brine 0 214
2015 BUCKEYE OIL PRODUCING CO Brine 6 214
2016 BUCKEYE OIL PRODUCING CO Brine 0 214
2017 BUCKEYE OIL PRODUCING CO Brine 0 109

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1956578812 2013-5-3 0:00:0 CS No Violations
-199402793 2013-5-21 0:00: DD No Violations
-2065960328 2013-5-1 0:00:0 CS No Violations
-611853167 2017-5-9 0:00:0 FR No Violations
-693169198 2017-4-20 0:00: PB No Violations
-723112209 2013-5-3 0:00:0 PB No Violations
0199402793 2013-05-21 Drill / Deepen / Reopen No Violations At the time of the inspection a service rig was on the well running production tubing. All pits were closed and all drilling equipment was removed.
0611853167 2017-05-09 Final Restoration No Violations Final restoration has been completed. Landowner waiver has been completed in order to leave stone driveways.
0693169198 2017-04-20 Plug / Plug Back No Violations Check well casing and 9 sack grout remained at surface . Well casing will be cut off below grade and steel plate will be installed at a later date.
0723112209 2013-05-03 Plug / Plug Back No Violations At the time of the inspection a Total Depth (TD) had been reached on the well at 1823 with the top of the Trempeleau at approximately 1684. The well was logged by Weatherford Logging and then 1300 of 4.5 casing with 523 of drill string on top was ran to reach TD. A bottom plug was then placed in the well from TD to 1484 by PetroSet Cementing. All of the drill pipe was pulled leaving the 1300 of 4.5 Production Casing.
1368723372 2013-04-29 Casing String Witnessed No Violations At the time of the inspection, 79 of 11.75 conductor casing was set inside 85 of 14.75 hole by Poulson Drilling. The casing was then cemented by PetroSet Cementing with good cement returns to the surface.
1424981453 2015-02-25 Preliminary Restoration No Violations Pits filled in and area leveled around site. Drilling equipment removed from site and pump jack with propane engine installed. 100 barrel tank on site. ID Posted.
1492708868 2017-04-19 Plug / Plug Back No Violations Witness the plugging of this well. Well was plugged by installing 30 sacks of Class A Cement by pumping into well casing and displacing fluid in bottom of well Production casing was ripped at a depth of 660 feet and removed from well. Eight yards of 9 sack grout was installed at a depth of 550 feet deep and filled surface casing to surface of the ground.
1526274802 2017-01-26 Production Wells No Violations Pump jack and storage tanks have been removed. Identification is posted and well is currently being evaluated and may be plugged in the near future.
1956578812 2013-05-03 Casing String Witnessed No Violations At the time of the inspection 4.5 production casing was ran to 1300 by Poulson Drilling and cemented back to approximately 930 by PetroSet Cementing.
2065960328 2013-05-01 Casing String Witnessed No Violations At the time of the inspection, 422 of 8.625 surface casing was set inside 464 of 11 hole by Poulson Drilling. The casing was then cemented by PetroSet Cementing with good cement returns to the surface.

For data sources see[9]

References