If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-22278 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.79,"lon":-81.27,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Summit Township | |
Operator Name: G-R CONTRACTING INC | |
Well Pad ID: | |
Farm/Lease Name: L TONKOUICH | |
License Status: Final Restoration | |
License Date: 2013-07-24 | |
Spud Date: 1981-11-11 | |
Spud Drilling Contractor: | |
Final Drill Date: 1981-11-27 | |
Well Total Depth: 3600.00 ft | |
Configuration: Vertical | |
Latitude: 39.790000 | |
Longitude: -81.270000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1980-12-31 | 952 G-R CONTRACTING INC GeoDate 12/31/80 |
Oil and Gas | 1980-12-31 | Issued Date 12/31/80 Expired Date Acres 0020000 Tool Type RTAF Proposed Formation OHIO SHALE Proposed Depth 00000 Proposed Drill Depth 00000 |
Original Spud | 1981-11-11 | |
Completed | 1981-11-27 | |
Reached Total Depth | 1981-11-27 | |
APP | 2013-07-24 | Proposed Formations:OHIO SHALE, Issued Date:7/24/2013, Expired Date:7/24/2015 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:EOUT |
Plugged/Abandoned | 2013-09-05 | |
Construction Permit Expires | 2015-07-24 | |
Record Last Modified | 2018-11-17 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 2692 | 3544 | 36 |
2692 | 3544 | 36 | |
2692 | 3544 | 36 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 80000 Gal | 18000 | |||
ACID | 15 | 400 Gal | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | HOPEWELL OIL & GAS DEVELOPMENT | 273.00 | 46.00 | 365 |
1985 | HOPEWELL OIL & GAS DEVELOPMENT | 0.00 | 0.00 | 0 |
1986 | HOPEWELL OIL & GAS DEVELOPMENT | 1096.00 | 56.00 | 365 |
1987 | HOPEWELL OIL & GAS DEVELOPMENT | 1123.00 | 39.00 | 365 |
1988 | HOPEWELL OIL & GAS DEVELOPMENT | 429.00 | 0.00 | 365 |
1989 | HOPEWELL OIL & GAS DEVELOPMENT | 0.00 | 0.00 | 0 |
1990 | HOPEWELL OIL & GAS DEVELOPMENT | 0.00 | 0.00 | 365 |
1996 | G-R CONTRACTING INC | 8.00 | 0.00 | 365 |
1997 | G-R CONTRACTING INC | 11.00 | 0.00 | 365 |
1998 | G-R CONTRACTING INC | 0.00 | 0.00 | 365 |
2000 | G-R CONTRACTING INC | 0.00 | 0.00 | 365 |
2001 | G-R CONTRACTING INC | 0.00 | 0.00 | 365 |
2002 | G-R CONTRACTING INC | 0.00 | 0.00 | 365 |
2003 | G-R CONTRACTING INC | 0.00 | 0.00 | 365 |
2004 | G-R CONTRACTING INC | 0.00 | 0.00 | 365 |
2005 | G-R CONTRACTING INC | 0.00 | 0.00 | 365 |
2006 | G-R CONTRACTING INC | 0.00 | 0.00 | 365 |
2007 | G-R CONTRACTING INC | 0.00 | 0.00 | 365 |
2011 | GAS ENTERPRISE COMPANY INC | 0.00 | 33.00 | 365 |
2012 | G-R CONTRACTING INC | 0.00 | 0.00 | 366 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 365 |
1985 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 0 |
1986 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 200 | 365 |
1987 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 10 | 365 |
1988 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 8 | 365 |
1989 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 0 |
1990 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 365 |
1996 | G-R CONTRACTING INC | Brine | 0 | 365 |
1997 | G-R CONTRACTING INC | Brine | 0 | 365 |
1998 | G-R CONTRACTING INC | Brine | 0 | 365 |
2000 | G-R CONTRACTING INC | Brine | 0 | 365 |
2001 | G-R CONTRACTING INC | Brine | 0 | 365 |
2002 | G-R CONTRACTING INC | Brine | 0 | 365 |
2003 | G-R CONTRACTING INC | Brine | 0 | 365 |
2004 | G-R CONTRACTING INC | Brine | 0 | 365 |
2005 | G-R CONTRACTING INC | Brine | 0 | 365 |
2006 | G-R CONTRACTING INC | Brine | 0 | 365 |
2007 | G-R CONTRACTING INC | Brine | 0 | 365 |
2011 | GAS ENTERPRISE COMPANY INC | Brine | 0 | 365 |
2012 | G-R CONTRACTING INC | Brine | 0 | 366 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-294042664 | 2018-11-8 0:00: | FR | No Violations | 0.20 |
0294042664 | 2018-11-08 | Final Restoration | No Violations | On this day, I am conducting a final restoration inspection. Site meets ORC 1509.072 (B). Final restoration was previously passed on 1/6/2014, but an incorrect checkbox was selected in the inspection. |
1131256566 | 2013-08-25 | Production Wells | No Violations | A plugging permit has been issued on the said well, Compiling with the initial violation # 1366119630 issued on 04/16/2013. |
1366119603 | 2013-04-16 | Production Wells | Violations Noted | Inspection of the well head found the following equipment present-4.5 production casing- 1.5 tubing and pumping rods with no motive power on the well head with all production valves closed and no reported production by G & R in the database. No other equipment was found on site related to said well. There is a G & R well identification tag on the well head. Instructions are as follows-Make well capable of commercial production within 30 days; or plugging is required within 90 days.
Failure to comply may result in Forfeiture of Bond. Contact Inspector Bill Stolarik 740-507- 6592 |
1378309737 | 2013-09-04 | Plug / Plug Back | No Violations | Status check inspection to witness the 4.5 rip plug and tagging of the bottom plug set on the previous day, The plug was tagged by the wire line truck at 1771. The plug was supposed to be from 3515 to 2500. I did not witness the bottom plug set on 09/03/13 due to being in a mandatory meeting. We cut the casing at 1750 after speaking with supervisor Dan Goins. |
1378389386 | 2013-09-05 | Plug / Plug Back | No Violations | I am on site today with Bill Stolarik and witnessed G--- |
1378477053 | 2013-09-05 | Plug / Plug Back | No Violations | The said well has been plugged and abandoned on this day resolving the prior violation. |
1389028392 | 2014-01-06 | Preliminary Restoration | No Violations | Status check inspection on the site restoration found the equipment removed and the site graded with vegetation established. |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1366119603 | US-OH-110757 | 2013-09-06 | Forfeiture of bond | |
1366119603 | US-OH-110758 | 2013-09-06 | Well shall be plugged |
For data sources see[9]