If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-111-22880 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.57,"lon":-81.08,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Washington | |
| Municipality: Grandview Township | |
| Operator Name: CISLER KENNETH M | |
| Well Pad ID: | |
| Farm/Lease Name: MANSFIELD WILLIAM F | |
| License Status: Producing | |
| License Date: 1982-05-19 | |
| Spud Date: 1982-09-14 | |
| Spud Drilling Contractor: HEARN DRILLING | |
| Final Drill Date: 1982-10-30 | |
| Well Total Depth: 3797.00 ft | |
| Configuration: Vertical | |
| Latitude: 39.570000 | |
| Longitude: -81.080000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| Oil and Gas | 1982-05-19 | Issued Date 5/19/82 Expired Date 11/15/82 Acres 0020000 Tool Type CT Proposed Formation OHIO SHALE Proposed Depth 03797 Proposed Drill Depth 03797 |
| Original Spud | 1982-09-14 | |
| Completed | 1982-10-30 | |
| Reached Total Depth | 1982-10-30 | |
| Construction Permit Expires | 1982-11-15 | |
| CO | 1982-11-19 | 460 CARLTON OIL CORP GeoDate 5/19/82 |
| Completion Report Received | 1982-11-29 | |
| Change of Owner | 2000-10-13 | Operator changed from 460, CARLTON OIL CORP to 4938, LUDLOW OIL & GAS |
| Change of Owner | 2008-09-03 | Operator changed from 4938, LUDLOW OIL & GAS to 8424, CISLER KENNETH M |
| Change of Owner | 2010-08-25 | Operator changed from 8424, CISLER KENNETH M to 8700, CISLER LESLIE |
| Change of Owner | 2014-06-05 | Operator changed from 8700, CISLER LESLIE to 9287, CISLER KENNETH M |
| Record Last Modified | 2015-09-24 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2006-09-11 | 3487 | 3523 | 5 |
| 2157 | 0 | ||
| 1997-06-29 | 2157 | 0 | |
| 3487 | 3523 | 5 | |
| 2157 | 0 | ||
| 2006-09-11 | 3606 | 3620 | 8 |
| 2006-09-11 | 3572 | 3596 | 8 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| N2 | 0 | 850 Mscf | 0 | FRAC;850 MCF N2 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1985 | CARLTON OIL CORP | 0.00 | 0.00 | 0 |
| 1986 | CARLTON OIL CORP | 452.00 | 0.00 | 365 |
| 1987 | CARLTON OIL CORP | 237.00 | 0.00 | 365 |
| 1988 | CARLTON OIL CORP | 180.00 | 0.00 | 365 |
| 1989 | CARLTON OIL CORP | 307.00 | 0.00 | 365 |
| 1990 | CARLTON OIL CORP | 38.00 | 0.00 | 365 |
| 1992 | CARLTON OIL CORP | 6.00 | 35.00 | 365 |
| 1993 | CARLTON OIL CORP | 351.00 | 53.00 | 0 |
| 1994 | CARLTON OIL CORP | 135.00 | 0.00 | 365 |
| 1995 | CARLTON OIL CORP | 98.00 | 58.00 | 365 |
| 1996 | CARLTON OIL CORP | 109.00 | 0.00 | 365 |
| 1997 | CARLTON OIL CORP | 96.00 | 0.00 | 365 |
| 1998 | CARLTON OIL CORP | 106.00 | 0.00 | 365 |
| 1999 | CARLTON OIL CORP | 141.00 | 0.00 | 365 |
| 2000 | CARLTON OIL CORP | 243.00 | 0.00 | 270 |
| 2001 | CARLTON OIL CORP | 0.00 | 0.00 | 365 |
| 2002 | CARLTON OIL CORP | 0.00 | 0.00 | 365 |
| 2005 | CITATION ENERGY COMPANY | 50.00 | 0.00 | 365 |
| 2008 | CISLER KENNETH M | 559.00 | 0.00 | 93 |
| 2009 | CISLER KENNETH M | 1424.00 | 0.00 | 300 |
| 2014 | CISLER KENNETH M | 3001.00 | 0.00 | 365 |
| 2015 | CISLER KENNETH M | 2889.00 | 0.00 | 365 |
| 2016 | CISLER KENNETH M | 1857.00 | 0.00 | 365 |
| 2017 | CISLER KENNETH M | 1246.00 | 0.00 | 365 |
| 2018 | CISLER KENNETH M | 2902.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1985 | CARLTON OIL CORP | Brine | 0 | 0 |
| 1986 | CARLTON OIL CORP | Brine | 0 | 365 |
| 1987 | CARLTON OIL CORP | Brine | 0 | 365 |
| 1988 | CARLTON OIL CORP | Brine | 0 | 365 |
| 1989 | CARLTON OIL CORP | Brine | 0 | 365 |
| 1990 | CARLTON OIL CORP | Brine | 0 | 365 |
| 1992 | CARLTON OIL CORP | Brine | 0 | 365 |
| 1993 | CARLTON OIL CORP | Brine | 0 | 0 |
| 1994 | CARLTON OIL CORP | Brine | 0 | 365 |
| 1995 | CARLTON OIL CORP | Brine | 0 | 365 |
| 1996 | CARLTON OIL CORP | Brine | 0 | 365 |
| 1997 | CARLTON OIL CORP | Brine | 365 | |
| 1998 | CARLTON OIL CORP | Brine | 365 | |
| 1999 | CARLTON OIL CORP | Brine | 365 | |
| 2000 | CARLTON OIL CORP | Brine | 270 | |
| 2001 | CARLTON OIL CORP | Brine | 0 | 365 |
| 2002 | CARLTON OIL CORP | Brine | 0 | 365 |
| 2005 | CITATION ENERGY COMPANY | Brine | 0 | 365 |
| 2008 | CISLER KENNETH M | Brine | 0 | 93 |
| 2009 | CISLER KENNETH M | Brine | 0 | 300 |
| 2014 | CISLER KENNETH M | Brine | 0 | 365 |
| 2015 | CISLER KENNETH M | Brine | 0 | 365 |
| 2016 | CISLER KENNETH M | Brine | 0 | 365 |
| 2017 | CISLER KENNETH M | Brine | 0 | 365 |
| 2018 | CISLER KENNETH M | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -2143278050 | 2009-3-23 0:00: | PW | No Violations | |
| 000PL10489 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
| 2143278050 | 2009-03-23 | Production Wells | No Violations | Inspected well site along with Pat Shreve and it was determined that well is in operation well is equipped with 8 surface pipe and 4.5 production casing and tubing and 1-100 bbl tank improperly spaced from wellhead. |
| PL10489 | PL | No Violations |
For data sources see[9]