If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-111-23033 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.54,"lon":-81.03,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: <County> | |
| Municipality: | |
| Operator Name: BUETTNER PHYLLIS | |
| Well Pad ID: | |
| Farm/Lease Name: STEPHANS DOROTHY M | |
| License Status: Final Restoration | |
| License Date: 2015-02-04 | |
| Spud Date: 1983-12-21 | |
| Spud Drilling Contractor: MAJOR DRLG | |
| Final Drill Date: 1984-01-10 | |
| Well Total Depth: 4300.00 ft | |
| Configuration: Vertical | |
| Latitude: 39.540000 | |
| Longitude: -81.030000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| Oil and Gas | 1983-09-23 | Issued Date 9/23/83 Expired Date 3/21/84 Acres 0040000 Tool Type CRAF Proposed Formation OHIO SHALE Proposed Depth 00000 Proposed Drill Depth 00000 |
| CO | 1983-11-08 | 69 SANDHILL ENERGY INC GeoDate 11/8/83 |
| Oil and Gas | 1983-11-08 | Issued Date 11/8/83 Expired Date 5/6/84 Acres 0040000 Tool Type RTAF Proposed Formation OHIO SHALE Proposed Depth 04300 Proposed Drill Depth 04300 |
| Original Spud | 1984-01-05 | R.I. 11-13-83, LOGGING CONTRACTOR=SANDHILL ENERGY |
| Completed | 1984-01-10 | R.I. 11-13-83, LOGGING CONTRACTOR=SANDHILL ENERGY |
| Reached Total Depth | 1984-01-10 | R.I. 11-13-83, LOGGING CONTRACTOR=SANDHILL ENERGY |
| CO | 1984-06-04 | 69 SANDHILL ENERGY INC GeoDate 9/23/83 |
| Completion Report Received | 1984-08-30 | R.I. 11-13-83, LOGGING CONTRACTOR=SANDHILL ENERGY |
| CO | 1994-07-13 | 4858 STEPHAN DOROTHY GeoDate 11/8/83 |
| Change of Owner | 2005-03-30 | Operator changed from 4858, STEPHAN DOROTHY to 7816, BUETTNER PHYLLIS |
| APP | 2015-02-04 | Proposed Formations:GORDON, Issued Date:2/4/2015, Expired Date:2/3/2017 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class: |
| Plugged/Abandoned | 2015-02-17 | R.I. 11-13-83, LOGGING CONTRACTOR=SANDHILL ENERGY |
| Construction Permit Expires | 2017-02-03 | R.I. 11-13-83, LOGGING CONTRACTOR=SANDHILL ENERGY |
| Record Last Modified | 2017-02-10 | R.I. 11-13-83, LOGGING CONTRACTOR=SANDHILL ENERGY |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 1997-06-29 | 1894 | 0 | |
| 1894 | 0 | ||
| 2006-09-11 | 1905 | 2344 | 49 |
| 1905 | 2344 | 49 | |
| 1894 | 0 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| ACID | 0 | 1000 Gal | 0 | FRAC;H2O,SAND,ACID |
For data sources see[4]
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1791369167 | 2015-2-12 0:00: | PB | No Violations | 2.00 |
| 0000020630 | Preliminary Restoration | No Violations | PASSED Y WITNESSED 2/16/94 INSPECTOR CLYDE DOBBIN DATE 02/1619/94 DATA FROM OLD VAX INFO | |
| 005604i178 | 2002-05-01 | Production Wells | No Violations | |
| 1423852512 | 2015-02-13 | Plug / Plug Back | No Violations | On site plug job inspection to witness the VDL Bond Log ran by Timcos Wireline Services to verify the top of cement on the annular side of the 4.5 production casing. The log was ran and top of cement marked @ 1,640. The formation tops were the marked and correlated with surrounding wells to verify that proper zonal isolation would be achieved during the plugging of the well. A 516 bottom plug is slated to be set on 02/16/2015. Harmons well service is the service rig on the hole doing the plug work. |
| 1424208945 | 2015-02-17 | Plug / Plug Back | No Violations | 02/16 15 the bottom plug was set through 2.375 tubing set @ 2310and not witnessed due to a Holiday. On 02/17/2015 The bottom plug was tagged @ 1,795 and the casing shot off @ 1,500 by Timcos wireline service. One joint was pulled and a plug set from 1,466 to 964 in 2 intervals. The casing was then pulled up to 371 and the bottom of surface casing plug was set from 371 to 200 and the casing was pulled to 200 and the surface plug set from 200 to surface with the cement topped off once the casing was out and staying up to surface. Harmons well service shall empty the plugging pit before the end of the work day. |
| 1425472535 | 2015-03-04 | Final Restoration | No Violations | The said well plugging is now complete and the well location has been restored to the condition favorable for the property use, (corn field). All well related equipment has been removed. Final Restoration passed. |
| 1791369167 | 2015-02-12 | Plug / Plug Back | No Violations | On location upon request from Inspector Bill Stolarik to check status of plugging preparations for this well. Harmon Well Services rig is on location and is standing over the well. No personnel were on location. |
| 20630 | PL | No Violations | ||
| 5604i178 | 2002-5-1 0:00:0 | PW | No Violations |
For data sources see[5]