If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24084 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.74,"lon":-81.09,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Center Township | |
Operator Name: BECK ENERGY CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: HUPP | |
License Status: Producing | |
License Date: 2007-02-27 | |
Spud Date: 2007-03-28 | |
Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC | |
Final Drill Date: 2007-04-03 | |
Well Total Depth: 2730.00 ft | |
Configuration: Vertical | |
Latitude: 39.740000 | |
Longitude: -81.090000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2007-02-27 | Proposed Formations:BEREA/30 FOOT/GORDON, Issued Date:2/27/2007, Expired Date:2/27/2008 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Completed | 2007-04-03 | |
Reached Total Depth | 2007-04-03 | |
Completion Report Received | 2007-10-30 | |
Construction Permit Expires | 2008-02-27 | |
Record Last Modified | 2015-09-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2008-02-11 | 2406 | 2448 | 43 |
2008-02-11 | 2149 | 2162 | 27 |
2149 | 2162 | 27 | |
2406 | 2448 | 43 | |
2550 | 2578 | 59 | |
2642 | 2656 | 8 | |
2149 | 2162 | 27 | |
2008-02-11 | 2642 | 2656 | 8 |
2008-02-11 | 2550 | 2578 | 59 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 0 | 0 | 3RD STAGE OF 3-STAGE FRAC… NO SAND USED… ONLY SINGLE WATER FRAC VOLUME REPORTED... NO PRESSURES REPORTED… GM | ||
H2O | 0 | 190660 Gal | 0 | 1ST STAGE OF 3-STAGE FRAC… ALSO INVOLVED THE FIFTH SAND; NO SAND USED… ONLY SINGLE WATER FRAC VOLUME REPORTED... NO PRESSURES REPORTED… GM | ||
H2O | 0 | 0 | 0 | 2ND STAGE OF 3-STAGE FRAC… NO SAND USED… ONLY SINGLE WATER FRAC VOLUME REPORTED... NO PRESSURES REPORTED… GM |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | BECK ENERGY CORPORATION | 1114.00 | 0.00 | 0 |
2008 | BECK ENERGY CORPORATION | 1991.00 | 77.00 | 365 |
2009 | BECK ENERGY CORPORATION | 1330.00 | 19.00 | 365 |
2010 | BECK ENERGY CORPORATION | 1081.00 | 32.00 | 365 |
2011 | BECK ENERGY CORPORATION | 662.00 | 28.00 | 365 |
2012 | BECK ENERGY CORPORATION | 516.00 | 20.00 | 366 |
2013 | BECK ENERGY CORPORATION | 699.00 | 21.00 | 365 |
2014 | BECK ENERGY CORPORATION | 729.00 | 9.00 | 365 |
2015 | BECK ENERGY CORPORATION | 683.00 | 16.00 | 365 |
2016 | BECK ENERGY CORPORATION | 632.00 | 24.00 | 365 |
2017 | BECK ENERGY CORPORATION | 542.00 | 0.00 | 365 |
2018 | BECK ENERGY CORPORATION | 484.00 | 17.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | BECK ENERGY CORPORATION | Brine | 0 | |
2008 | BECK ENERGY CORPORATION | Brine | 5 | 365 |
2009 | BECK ENERGY CORPORATION | Brine | 57 | 365 |
2010 | BECK ENERGY CORPORATION | Brine | 44 | 365 |
2011 | BECK ENERGY CORPORATION | Brine | 53 | 365 |
2012 | BECK ENERGY CORPORATION | Brine | 66 | 366 |
2013 | BECK ENERGY CORPORATION | Brine | 152 | 365 |
2014 | BECK ENERGY CORPORATION | Brine | 75 | 365 |
2015 | BECK ENERGY CORPORATION | Brine | 69 | 365 |
2016 | BECK ENERGY CORPORATION | Brine | 65 | 365 |
2017 | BECK ENERGY CORPORATION | Brine | 0 | 365 |
2018 | BECK ENERGY CORPORATION | Brine | 68 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-216127813 | 2008-10-27 0:00 | PW | No Violations | |
0003458744 | 2018-02-08 | Production Wells | No Violations | On this day, I found the well equipped with 4.5 inch diameter casing with the valve open and 2 inch diameter tubing with the valve open. It is produced by means of a pumping unit with a gas engine, tubing, and rods. There is (1) 100 barrel steel tank, (1) 2,100 gallon polymer tank, drip tank, vertical separator, and an orifice meter all contained within an earthen dike. The tank is properly identified and the production records are current. |
0216127813 | 2008-10-27 | Production Wells | No Violations | WELL IS SUPPLIED WITH RABBIT AND A 100BBL TANK.DIKE IS SUFFICIENT.NO VIOLATIONS DAY OF MY INSPECTION. |
1194300801 | 2007-10-29 | Preliminary Restoration | No Violations | Restoration work at site satisfactory,pit has been filled in and site restored well is equipped with pump jack and 1-100 bbl tank with soomewhat of dike in place. |
1623974131 | 2008-09-29 | Production Wells | No Violations | WELL ISUPPLIED WITH RABBIT AND 1-100 BBL TANK.DIKE NEEDS TO BE REBUILT.REMOVE PLASTIC 2PIPE LAYING AROUND.CALLED DUANE POTTS ON MATTER. |
3458744 | 2018-2-8 0:00:0 | PW | No Violations | 0.50 |
For data sources see[9]