If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-111-24139 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.6,"lon":-81.23,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Monroe | |
| Municipality: Bethel Township | |
| Operator Name: FLEEMAN TERESA R | |
| Well Pad ID: | |
| Farm/Lease Name: GRIFFIN | |
| License Status: Producing | |
| License Date: 2007-09-10 | |
| Spud Date: 2007-08-14 | |
| Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC | |
| Final Drill Date: 2007-08-18 | |
| Well Total Depth: 2710.00 ft | |
| Configuration: Vertical | |
| Latitude: 39.600000 | |
| Longitude: -81.230000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| Completed | 2007-08-18 | |
| Reached Total Depth | 2007-08-18 | |
| APP | 2007-09-10 | Proposed Formations:GORDON/5TH SAND, Issued Date:9/10/2007, Expired Date:9/9/2008 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
| Completion Report Received | 2007-12-05 | |
| Construction Permit Expires | 2008-09-09 | |
| Record Last Modified | 2015-09-24 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2008-04-03 | 2080 | 2600 | 200 |
| 2080 | 2600 | 200 | |
| 2080 | 2600 | 200 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 8000 Bbl | 0 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2007 | FLEEMAN TERESA R | 5934.00 | 83.00 | 80 |
| 2008 | FLEEMAN TERESA R | 27597.00 | 76.00 | 365 |
| 2009 | FLEEMAN TERESA R | 15798.00 | 66.00 | 365 |
| 2010 | FLEEMAN TERESA R | 7565.00 | 71.00 | 365 |
| 2011 | FLEEMAN TERESA R | 4728.00 | 35.00 | 365 |
| 2012 | FLEEMAN TERESA R | 2383.00 | 77.00 | 366 |
| 2013 | FLEEMAN TERESA R | 2060.00 | 50.00 | 365 |
| 2014 | FLEEMAN TERESA R | 3547.00 | 35.00 | 365 |
| 2015 | FLEEMAN TERESA R | 998.00 | 16.00 | 365 |
| 2016 | FLEEMAN TERESA R | 902.00 | 16.00 | 365 |
| 2017 | FLEEMAN TERESA R | 307.00 | 50.00 | 365 |
| 2018 | FLEEMAN TERESA R | 540.00 | 4.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2007 | FLEEMAN TERESA R | Brine | 0 | 80 |
| 2008 | FLEEMAN TERESA R | Brine | 0 | 365 |
| 2009 | FLEEMAN TERESA R | Brine | 0 | 365 |
| 2010 | FLEEMAN TERESA R | Brine | 19 | 365 |
| 2011 | FLEEMAN TERESA R | Brine | 24 | 365 |
| 2012 | FLEEMAN TERESA R | Brine | 52 | 366 |
| 2013 | FLEEMAN TERESA R | Brine | 8 | 365 |
| 2014 | FLEEMAN TERESA R | Brine | 94 | 365 |
| 2015 | FLEEMAN TERESA R | Brine | 0 | 365 |
| 2016 | FLEEMAN TERESA R | Brine | 0 | 365 |
| 2017 | FLEEMAN TERESA R | Brine | 11 | 365 |
| 2018 | FLEEMAN TERESA R | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1084032023 | 2007-12-6 0:00: | PL | No Violations | |
| 1084032023 | 2007-12-06 | Preliminary Restoration | No Violations | Restoration work at site satisfactory, well is equipped with pump jack and tubing&rods and 1-100 bbl tank with somewhat of a dike in place. |
| 1521654201 | 2018-07-12 | Production Wells | No Violations | On this day, I found the well equipped with a surface casing head, 4.5 inch diameter casing, and 1.9 inch diameter tubing with the production valves open. It is being produced by means of a pumping unit with rods and an electric motor. The production facility consists of (1) 100 barrel steel tank and vertical separator all contained within an earthen dike. The production records are current and the tank is properly identified. |
For data sources see[9]