If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-111-24149 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.59,"lon":-81.2,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Monroe | |
| Municipality: Washington Township | |
| Operator Name: DERBY OPERATING CORP | |
| Well Pad ID: | |
| Farm/Lease Name: STEINHOFF | |
| License Status: Producing | |
| License Date: 2007-09-25 | |
| Spud Date: 2008-06-19 | |
| Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC | |
| Final Drill Date: 2008-06-24 | |
| Well Total Depth: 2910.00 ft | |
| Configuration: Vertical | |
| Latitude: 39.590000 | |
| Longitude: -81.200000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2007-09-25 | Proposed Formations:BEREA THRU OHIO SHALE, Issued Date:9/25/2007, Expired Date:9/24/2008 6:00:00 AM, Drilling unit acres:20.2, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2008-06-24 | |
| Construction Permit Expires | 2008-09-24 | |
| Completion Report Received | 2009-02-06 | |
| Record Last Modified | 2015-09-24 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2009-03-25 | 2120 | 2296 | 19 |
| 2009-03-25 | 2412 | 2454 | 34 |
| 2120 | 2296 | 19 | |
| 2412 | 2454 | 34 | |
| 2574 | 2678 | 32 | |
| 2120 | 2296 | 19 | |
| 2009-03-25 | 2574 | 2678 | 32 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 20 | 1721 Bbl | 0 | STAGE 2 OF 3… | ||
| H2O | 20 | 1809 Bbl | 0 | STAGE 1 OF 3… | ||
| H2O | 20 | 1547 Bbl | 0 | STAGE 3 OF 3…BEREA & GANTZ |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2008 | DERBY OPERATING CORP | 942.00 | 0.00 | 50 |
| 2009 | DERBY OPERATING CORP | 2603.00 | 459.00 | 365 |
| 2010 | DERBY OPERATING CORP | 1892.00 | 0.00 | 365 |
| 2011 | DERBY OPERATING CORP | 1730.00 | 0.00 | 365 |
| 2012 | DERBY OPERATING CORP | 1566.00 | 0.00 | 366 |
| 2013 | DERBY OPERATING CORP | 1394.00 | 0.00 | 365 |
| 2014 | DERBY OPERATING CORP | 1603.00 | 58.00 | 365 |
| 2015 | DERBY OPERATING CORP | 1674.00 | 0.00 | 365 |
| 2016 | DERBY OPERATING CORP | 1401.00 | 47.00 | 365 |
| 2017 | DERBY OPERATING CORP | 1308.00 | 33.00 | 365 |
| 2018 | DERBY OPERATING CORP | 1067.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2008 | DERBY OPERATING CORP | Brine | 0 | 50 |
| 2009 | DERBY OPERATING CORP | Brine | 0 | 365 |
| 2010 | DERBY OPERATING CORP | Brine | 0 | 365 |
| 2011 | DERBY OPERATING CORP | Brine | 0 | 365 |
| 2012 | DERBY OPERATING CORP | Brine | 27 | 366 |
| 2013 | DERBY OPERATING CORP | Brine | 0 | 365 |
| 2014 | DERBY OPERATING CORP | Brine | 0 | 365 |
| 2015 | DERBY OPERATING CORP | Brine | 0 | 365 |
| 2016 | DERBY OPERATING CORP | Brine | 0 | 365 |
| 2017 | DERBY OPERATING CORP | Brine | 0 | 365 |
| 2018 | DERBY OPERATING CORP | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -2096357670 | 2018-8-7 0:00:0 | PW | No Violations | 0.30 |
| 0332749267 | 2010-06-16 | Preliminary Restoration | No Violations | On day of inspection well is supplied with a 60 Terrell pumpjack.There is 7cas,4.5cas,1.5tubing. There is a shared tank site and contains two 100bbl tanks.Id and dike are in place. There is 100%vegetation. |
| 1343144737 | 2012-07-24 | Production Wells | No Violations | Inspection of the well head found the following equipment present, 4.5 production casing, 1.5 tubing & rods with the production valves open and the well being produced by the means of a pumping unit and proper well identification on well head . In the production fluid storage area 2-100 barrel tanks along with 2 fluid separators and 2 gas meters are present in an established dike with proper identification present. Inspector will note that the dike area is shared between 2 well 4149 &4150. |
| 2096357670 | 2018-08-07 | Production Wells | No Violations | On this day, I found the well equipped with a 7 inch diameter surface casing head, 4.5 inch diameter production casing, and 1.9 inch diameter tubing with the production valves open. It is produced by means of a pumping unit with rods and an electric motor. The production facility consists of (2) 100 barrel steel tanks, (2) drip tanks, (2) orifice sales meters, and (2) vertical separators. The facility is shared with permit number 2-4150. The tank is properly identified and the production records are current. |
| 332749267 | 2010-6-16 0:00: | PL | No Violations | 1.00 |
For data sources see[9]