If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-111-24153 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.75,"lon":-81.25,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Monroe | |
| Municipality: Franklin Township | |
| Operator Name: HOWELLS OIL & GAS | |
| Well Pad ID: | |
| Farm/Lease Name: BAKER | |
| License Status: Producing | |
| License Date: 2007-10-17 | |
| Spud Date: 2007-11-10 | |
| Spud Drilling Contractor: CO TOOLS | |
| Final Drill Date: 2008-01-14 | |
| Well Total Depth: 2525.00 ft | |
| Configuration: Vertical | |
| Latitude: 39.750000 | |
| Longitude: -81.250000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2007-10-17 | Proposed Formations:GORDON, Issued Date:10/17/2007, Expired Date:10/16/2008 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2008-01-14 | |
| Completion Report Received | 2008-04-14 | |
| Construction Permit Expires | 2008-10-16 | |
| Record Last Modified | 2015-09-24 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2008-08-21 | 2075 | 2095 | 16 |
| 2008-08-21 | 1960 | 1975 | 16 |
| 1960 | 1975 | 16 | |
| 2075 | 2095 | 16 | |
| 2214 | 2260 | 16 | |
| 2371 | 2494 | 20 | |
| 1960 | 1975 | 16 | |
| 2008-08-21 | 2371 | 2494 | 20 |
| 2008-08-21 | 2214 | 2260 | 16 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 0 | 0 | 0 | ||||
| 0 | 0 | 0 | ||||
| H2O | 0 | 120000 Gal | 0 | 1ST OF 4-STAGE FRAC; ONLY A SINGLE FRAC VOLUME AND BREAKDOWN PRESSURE WAS REPORTED FOR THE ENTIRE FRAC… GM | ||
| 0 | 0 | 0 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2008 | HOWELLS OIL & GAS | 1800.00 | 190.00 | 270 |
| 2009 | HOWELLS OIL & GAS | 1510.00 | 160.00 | 365 |
| 2010 | HOWELLS OIL & GAS | 1402.00 | 140.00 | 365 |
| 2011 | HOWELLS OIL & GAS | 1710.00 | 110.00 | 365 |
| 2012 | HOWELLS OIL & GAS | 1505.00 | 71.00 | 366 |
| 2013 | HOWELLS OIL & GAS | 1016.00 | 110.00 | 365 |
| 2014 | HOWELLS OIL & GAS | 3660.00 | 80.00 | 365 |
| 2015 | HOWELLS OIL & GAS | 3010.00 | 55.00 | 365 |
| 2016 | HOWELLS OIL & GAS | 3351.00 | 47.00 | 365 |
| 2017 | HOWELLS OIL & GAS | 3351.00 | 63.00 | 365 |
| 2018 | HOWELLS OIL & GAS | 2614.00 | 65.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2008 | HOWELLS OIL & GAS | Brine | 30 | 270 |
| 2009 | HOWELLS OIL & GAS | Brine | 20 | 365 |
| 2010 | HOWELLS OIL & GAS | Brine | 10 | 365 |
| 2011 | HOWELLS OIL & GAS | Brine | 0 | 365 |
| 2012 | HOWELLS OIL & GAS | Brine | 0 | 366 |
| 2013 | HOWELLS OIL & GAS | Brine | 20 | 365 |
| 2014 | HOWELLS OIL & GAS | Brine | 20 | 365 |
| 2015 | HOWELLS OIL & GAS | Brine | 0 | 365 |
| 2016 | HOWELLS OIL & GAS | Brine | 26 | 365 |
| 2017 | HOWELLS OIL & GAS | Brine | 0 | 365 |
| 2018 | HOWELLS OIL & GAS | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| 0932115135 | 2018-04-26 | Production Wells | No Violations | On this day, I found the well equipped with 4.5 inch diameter casing with the valve open and 1.9 inch diameter tubing with the valve open. It is produced by means of a pumping unit with an electric motor, tubing, and rods. There is (1) 100 barrel steel tank, (1) 500 gallon polymer tank, drip tank, and vertical separator all contained within an earthen dike. The tank is properly identified and the production records are current. Standing water inside dike was tested with Low Range Quantab and registered 0 parts per million. |
| 1235677712 | 2009-02-10 | Preliminary Restoration | No Violations | WELL IS SUPPLIED WITH A PUMPJACK AND A 100BBL TANK. |
| 932115135 | 2018-4-26 0:00: | PW | No Violations | 0.40 |
For data sources see[9]