If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-111-24203 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.72,"lon":-81.15,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Monroe | |
| Municipality: Wayne Township | |
| Operator Name: P P & G OIL | |
| Well Pad ID: | |
| Farm/Lease Name: WHEELER/TRUAX | |
| License Status: Producing | |
| License Date: 2008-06-20 | |
| Spud Date: 2008-07-23 | |
| Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC | |
| Final Drill Date: 2008-07-25 | |
| Well Total Depth: 2750.00 ft | |
| Configuration: Vertical | |
| Latitude: 39.720000 | |
| Longitude: -81.150000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2008-06-20 | Proposed Formations:DEVONIAN SHALE, Issued Date:6/20/2008, Expired Date:6/20/2009 6:00:00 AM, Drilling unit acres:20.39, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2008-07-25 | |
| Completion Report Received | 2008-08-28 | |
| Construction Permit Expires | 2009-06-20 | |
| Record Last Modified | 2015-09-24 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2008-10-16 | 2310 | 2379 | 62 |
| 2008-10-16 | 2014 | 2046 | 50 |
| 2014 | 2046 | 50 | |
| 2310 | 2379 | 62 | |
| 2432 | 2549 | 89 | |
| 2579 | 2700 | 65 | |
| 2014 | 2046 | 50 | |
| 2008-10-16 | 2579 | 2700 | 65 |
| 2008-10-16 | 2432 | 2549 | 89 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 430000 Gal | 0 | 3 STAGE FRAC-STAGE 1: GORDON/SHALE, BAFFLE @ 2475'-STAGE 2: THIRTY FOOT, BAFFLE @ 2230'-STAGE 3: BEREA…430M GALLONS TOTAL FRAC FLUID |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2008 | P P & G OIL | 4160.00 | 570.00 | 120 |
| 2009 | P P & G OIL | 3842.00 | 712.00 | 365 |
| 2010 | P P & G OIL | 2596.00 | 379.00 | 365 |
| 2011 | P P & G OIL | 2106.00 | 432.00 | 0 |
| 2012 | P P & G OIL | 1848.00 | 242.00 | 366 |
| 2013 | P P & G OIL | 1513.00 | 275.00 | 365 |
| 2014 | P P & G OIL | 1062.00 | 161.00 | 365 |
| 2015 | P P & G OIL | 1012.00 | 187.00 | 365 |
| 2016 | P P & G OIL | 915.00 | 94.00 | 365 |
| 2017 | P P & G OIL | 871.00 | 132.00 | 365 |
| 2018 | P P & G OIL | 775.00 | 150.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2008 | P P & G OIL | Brine | 65 | 120 |
| 2009 | P P & G OIL | Brine | 145 | 365 |
| 2010 | P P & G OIL | Brine | 124 | 365 |
| 2011 | P P & G OIL | Brine | 15 | |
| 2012 | P P & G OIL | Brine | 40 | 366 |
| 2013 | P P & G OIL | Brine | 27 | 365 |
| 2014 | P P & G OIL | Brine | 8 | 365 |
| 2015 | P P & G OIL | Brine | 10 | 365 |
| 2016 | P P & G OIL | Brine | 33 | 365 |
| 2017 | P P & G OIL | Brine | 42 | 365 |
| 2018 | P P & G OIL | Brine | 25 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1464984903 | 2018-5-29 0:00: | PW | No Violations | 0.40 |
| 0582490352 | 2011-10-25 | Preliminary Restoration | No Violations | A Preliminary Restoration check was completed at this site. This well is equipped with a pumping unit. The tank battery is equipped with one 110 barrel oil storage tank and one mechanical separator. This site meets requirements of the ORC and the Preliminary Restoration is now passed. |
| 1464984903 | 2018-05-29 | Production Wells | No Violations | On this day, I found the well equipped with 4.5 inch diameter casing and 1.9 inch diameter tubing with the production valves open. It is produced by means of a pumping unit with rods and a gas engine. The production facility consists of (2) 100 barrel steel tanks, a drip tank, vertical separator, and an orifice meter all contained within an earthen dike. The tank is properly identified and the production records are current through 2016. |
| 582490352 | 2011-10-25 0:00 | PL | No Violations | 0.50 |
For data sources see[9]