If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24204 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.74,"lon":-81.16,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Wayne Township | |
Operator Name: P P & G OIL | |
Well Pad ID: | |
Farm/Lease Name: BOLEN L W | |
License Status: Producing | |
License Date: 2008-06-20 | |
Spud Date: 2008-09-04 | |
Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC | |
Final Drill Date: 2008-09-09 | |
Well Total Depth: 2610.00 ft | |
Configuration: Vertical | |
Latitude: 39.740000 | |
Longitude: -81.160000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-06-20 | Proposed Formations:DEVONIAN SHALE, Issued Date:6/20/2008, Expired Date:6/20/2009 6:00:00 AM, Drilling unit acres:20.08, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-09-09 | |
Completion Report Received | 2009-02-13 | |
Construction Permit Expires | 2009-06-20 | |
Record Last Modified | 2015-09-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2009-04-27 | 2012 | 2026 | 29 |
2009-04-27 | 1952 | 1974 | 23 |
1952 | 1974 | 23 | |
2012 | 2026 | 29 | |
2170 | 2176 | 7 | |
2272 | 2346 | 54 | |
2378 | 2508 | 79 | |
1952 | 1974 | 23 | |
2009-04-27 | 2170 | 2176 | 7 |
2009-04-27 | 2378 | 2508 | 79 |
2009-04-27 | 2272 | 2346 | 54 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 0 | 0 | 2ND STAGE OF FRAC INCLUDED THE GANTZ SAND | ||
H2O | 0 | 0 | 0 | 3RD STAGE OF FRAC INCLUDED THE HAMBDEN SANDSTONE | ||
H2O | 0 | 260000 Gal | 50000 | 1ST STAGE OF FRAC … NOTE THAT ONLY A SINGLE SET OF FRAC VOLUMES AND PRESSURES AND RESERVOIR PRESSURES WERE REPORTED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | P P & G OIL | 1286.00 | 300.00 | 60 |
2009 | P P & G OIL | 3956.00 | 783.00 | 365 |
2010 | P P & G OIL | 2313.00 | 366.00 | 365 |
2011 | P P & G OIL | 1561.00 | 253.00 | 0 |
2012 | P P & G OIL | 1447.00 | 180.00 | 366 |
2013 | P P & G OIL | 1191.00 | 184.00 | 365 |
2014 | P P & G OIL | 966.00 | 175.00 | 365 |
2015 | P P & G OIL | 824.00 | 87.00 | 365 |
2016 | P P & G OIL | 745.00 | 98.00 | 365 |
2017 | P P & G OIL | 738.00 | 167.00 | 365 |
2018 | P P & G OIL | 662.00 | 141.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | P P & G OIL | Brine | 36 | 60 |
2009 | P P & G OIL | Brine | 88 | 365 |
2010 | P P & G OIL | Brine | 73 | 365 |
2011 | P P & G OIL | Brine | 34 | |
2012 | P P & G OIL | Brine | 17 | 366 |
2013 | P P & G OIL | Brine | 28 | 365 |
2014 | P P & G OIL | Brine | 5 | 365 |
2015 | P P & G OIL | Brine | 20 | 365 |
2016 | P P & G OIL | Brine | 20 | 365 |
2017 | P P & G OIL | Brine | 31 | 365 |
2018 | P P & G OIL | Brine | 22 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1583612513 | 2009-8-27 0:00: | PL | No Violations | |
0140539967 | 2018-08-13 | Production Wells | No Violations | On this day, I found the well equipped with 4.5 inch diameter casing and 1.9 inch diameter tubing with the production valves open. It is produced by means of a pumping unit with rods and an electric motor. The production facility consists of (2) 100 barrel steel tanks, a drip tank, vertical separator, and an orifice sales meter all contained within an earthen dike. The tank is properly identified and the production records are current. |
1247500226 | 2009-06-29 | Preliminary Restoration | Violations Noted | WELL IS SUPPLIED WITH PUMPJACK AND 2 100BBL TANKS.SITE NEEDS RESTORED AND DIKE NEEDS CLOSED AT TANKS. |
1256174249 | 2009-10-06 | Preliminary Restoration | No Violations | Well is supplied with pumpjack and 7cas,4.5cas,1.5tubing.There is 2 100bbl tanks and dike and id are inplace.Nov is resolved. |
140539967 | 2018-8-13 0:00: | PW | No Violations | 0.60 |
1583612513 | 2009-08-27 | Preliminary Restoration | Violations Noted | WELL SITE HAS HAD DISC RAN OVER BUT THERE IS STILL PROBLEMS AT SITE WITH PIT EXPOSED AND ALSO CONTAMINATION.THERE IS NOT 90%VEGATATION ESTABLISHED.MET WITH JASON LUDWIG AND GAVE HIM 40 DAYS. BRING DOZER IN AND GRADE SITE SEED AND MULCH.FAILURE TO COMPLY WILL RESULT IN BOND FORFEITURE. |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1247500226 | US-OH-106588 | 2009-07-13 | Failure to restore land surface within 9 mos. (CHANGE) (REPLACE) | |
1247500226 | US-OH-106589 | 2009-07-13 | Dike or pit not able to prevent escape of brine or other wastes | |
1583612513 | US-OH-115493 | 2013-01-08 | Failure to restore land surface within 9 mos. (CHANGE) (REPLACE) |
For data sources see[9]