Well ID: 34-111-24213 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Lee Township | |
Operator Name: DIVERSIFIED PRODUCTION LLC | |
Well Pad ID: | |
Farm/Lease Name: FETTY LUTHER | |
License Status: Producing | |
License Date: 2008-08-11 | |
Spud Date: 2008-08-19 | |
Spud Drilling Contractor: G & L DRILLING | |
Final Drill Date: 2008-09-04 | |
Well Total Depth: 6330.00 ft | |
Configuration: Vertical | |
Latitude: 39.650000 | |
Longitude: -80.990000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-08-11 | Proposed Formations:BEREA/DEVONIAN SHALE THRU ORISKANY, Issued Date:8/11/2008, Expired Date:8/11/2009 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2008-09-04 | |
Construction Permit Expires | 2009-08-11 | |
Completion Report Received | 2009-09-24 | |
Change of Owner | 2013-05-29 | Operator changed from 8172, APPALACHIAN ENERGY RES LLC to 8844, ECLIPSE RESOURCES I LP |
Change of Owner | 2016-07-25 | Operator changed from 8844, ECLIPSE RESOURCES I LP to 8685, M & R INVESTMENTS OHIO LLC |
Record Last Modified | 2016-07-25 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2009-12-29 | 2386 | 2390 | 10 |
2009-12-29 | 2274 | 2326 | 16 |
2274 | 2326 | 16 | |
2386 | 2390 | 10 | |
2566 | 2648 | 26 | |
2796 | 2838 | 32 | |
2972 | 2982 | 10 | |
2274 | 2326 | 16 | |
2009-12-29 | 2566 | 2648 | 26 |
2009-12-29 | 2972 | 2982 | 10 |
2009-12-29 | 2796 | 2838 | 32 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 20 | 105000 Gal | 0 | STAGE 1 OF 3…GORDON & FIFTH SANDS | ||
H2O | 20 | 108960 Gal | 0 | STAGE 3 OF 3…FRAC PLUG SET @ 2460'…INCLUDES WEIR SAND | ||
H2O | 20 | 105000 Gal | 0 | STAGE 2 OF 2…FRAC PLUG SET @ 2720' |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | APPALACHIAN ENERGY RES LLC | 3890.00 | 102.00 | 365 |
2010 | APPALACHIAN ENERGY RES LLC | 2017.00 | 0.00 | 365 |
2011 | APPALACHIAN ENERGY RES LLC | 1068.00 | 13.00 | 365 |
2012 | APPALACHIAN ENERGY RES LLC | 1014.00 | 35.00 | 366 |
2013 | ECLIPSE RESOURCES I LP | 158.00 | 0.00 | 180 |
2014 | ECLIPSE RESOURCES I LP | 753.00 | 0.00 | 357 |
2016 | M & R INVESTMENTS OHIO LLC | 0.00 | 0.00 | 365 |
2017 | M & R INVESTMENTS OHIO LLC | 0.00 | 0.00 | 0 |
2018 | M & R INVESTMENTS OHIO LLC | 0.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | APPALACHIAN ENERGY RES LLC | Brine | 1363 | 365 |
2010 | APPALACHIAN ENERGY RES LLC | Brine | 0 | 365 |
2011 | APPALACHIAN ENERGY RES LLC | Brine | 106 | 365 |
2012 | APPALACHIAN ENERGY RES LLC | Brine | 171 | 366 |
2013 | ECLIPSE RESOURCES I LP | Brine | 0 | 180 |
2014 | ECLIPSE RESOURCES I LP | Brine | 0 | 357 |
2016 | M & R INVESTMENTS OHIO LLC | Brine | 9 | 365 |
2017 | M & R INVESTMENTS OHIO LLC | Brine | 0 | 0 |
2018 | M & R INVESTMENTS OHIO LLC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1510641504 | 2008-8-22 0:00: | DD | No Violations | |
-173433044 | 2008-9-2 0:00:0 | DD | No Violations | |
-2100133187 | 2008-9-3 0:00:0 | PB | No Violations | |
-305566349 | 2009-1-16 0:00: | PW | No Violations | |
-5578426 | 2020-2-26 0:00: | PW | No Violations | 0.60 |
-558446278 | 2008-9-4 0:00:0 | PB | No Violations | |
0173433044 | 2008-09-02 | Drill / Deepen / Reopen | No Violations | THE FIRST STRING FLOAT IS AT 3288.THE WIRELINE WILL NOT GET ANY FARTHER THAN THIS.WE HAD TO LOAD THE HOLE WITH BRINE WATER.TIMCO WENT IN TO SHOOT THE PIPE OFF WITH AN 1 3/8 SHOT.FIRED OFF BUT PIPE DID NOT SEPARATE.CONTINUED THIS FOR ALL DAY.ABOUT THE 6TH TIME WE HAD NO SHOT LEFT.WE TRIED PRIMER CORD NO LUCK.CALLED AROUND ABOUT A COLLAR BUSTER.JET WIRELINE WILL COME 9-3-08 . |
0305566349 | 2009-01-16 | Production Wells | No Violations | BRIAN CHAVEZ FROM HEINRICH ENTERPRIZES CALLED ON TANK THAT BURPED A LITTLE OIL INTO THE DIKE.WAS CONTAINED AND CLEANED UP WITH DIAPERS. |
0558446278 | 2008-09-04 | Plug / Plug Back | No Violations | ON THIS DAY WE RAN A 15SUB BELOW THE SHOT.RAN INTO HOLE FINALLY GOT THROUGH DOWNHOLE TOOL AND GOT TO FIRST FLOAT.SHOT OFF NO GO.PULLED OUT RAN IN AGAIN.WITH THIRTY SHOT PULLED UP ON THE JARS ALITTLE SHOT OFF AT 3187.PIPE JUMPED THREE FEET DRIVING TOP DRIVE UP.PULLED DRILLPIPE AND LOGGED HOLE WITH JET WIRELINE.RAN 4.5 CASING TO 3150 AND PUT LATCHDOWN INSERT AT ONE JT.UP WHICH IS 42 FT.MADE A GORDON WELL OUT OF IT. |
0757618463 | 2012-07-23 | Production Wells | No Violations | Inspection of the well site found the following equipment, 7 surface casing, 4.5 production casing, 1.5 tubing & rods with the production valves open and the well being produced by the means of a pumping unit. At the production fluid storage area the following equipment is present, 2-100 barrel tanks along with a separator and gas meter with proper well identification and an established dike impoundment. |
1221822903 | 2008-08-29 | Drill / Deepen / Reopen | No Violations | ON DAY OF INSPECTION OF WORK WELL WAS TD AT 6332 AND PIPE WAS STUCK IN HOLE.THE RIG PULLED PIPE AFTER DRILLING AND AFTER 11 JTS WERE PULLED PIN BROKE ON DRILL PIPE AND PIPE WITH A STRING WEIGHT OF OVER 60,000 LBS WENT STRAIGHT DOWN.THE RIG AND TWO PORTAPOWERS WERE USED TO PULL PIPE UP AND COULD ONLY GET ABOUT 1 FT OF STRETCH.WE THEN GOT OFF OF DRILLPIPE AND CALLED TIMCO WIRELINE.THEY WOULD SHOW UP ONSEPT 2ND. |
1389634358 | 2014-01-13 | Preliminary Restoration | No Violations | The well site meets 1509.072, 2-100 barrel tanks are present in an established dike area with proper identification posted. |
1491778978 | 2017-04-07 | Production Wells | No Violations | On 04/06/2017 the landowner contacted me and indicated the well head stuffing box had leaked oil onto the well head and on the ground around the well head. The landowner indicated the product was minimal and contained around the well head and he also shut the well in and off. I contacted Eddie Moss and Darrin Crum who are company men for M&R Investments and they had field personnel respond and address the issue. I followed up the following morning 04/07/2017 to find no product on the earths surface around the well head. |
1510641504 | 2008-08-22 | Drill / Deepen / Reopen | No Violations | ON THE DAY OF BOP TEST.WE STARTED TO HOOK THINGS UP AND WE HAD LEAKS. DISASSEMBLED EVERYTHING AND TAPED UP BOPS.PRESSURED UP TO 300 PSI. HELD FOR APPROXIMATE 30 MIN.HELD GOOD. |
2100133187 | 2008-09-03 | Plug / Plug Back | No Violations | JET SHOWED UP AND RAN IN WIRELINE WITH 1 11/16 SHOT.MADE FIRST RUN IN.20SHOTS ON A WIRE.FLIUD LEVEL AT 2200 FT.COULD NOT GET BIGGER SHOT DOWN HOLE.PAST DOWNHOLE TOOL.(HYDRAULIC JARS,OVERSHOT.)WHICH WERE AT 2625. |
757618463 | 2012-7-23 0:00: | PW | No Violations |
For data sources see[9]