If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24230 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.75,"lon":-81.18,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Summit Township | |
Operator Name: G-R CONTRACTING INC | |
Well Pad ID: | |
Farm/Lease Name: RUBEL-LAWLEY | |
License Status: Producing | |
License Date: 2008-10-14 | |
Spud Date: 2008-10-15 | |
Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC | |
Final Drill Date: 2008-10-16 | |
Well Total Depth: 2490.00 ft | |
Configuration: Vertical | |
Latitude: 39.750000 | |
Longitude: -81.180000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-10-14 | Proposed Formations:BEREA/30 FOOT/GORDON, Issued Date:10/14/2008, Expired Date:10/14/2009 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-10-16 | |
Completion Report Received | 2009-02-26 | |
Construction Permit Expires | 2009-10-14 | |
Record Last Modified | 2015-09-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2009-05-07 | 2040 | 2048 | 17 |
2009-05-07 | 2316 | 2337 | 18 |
2040 | 2048 | 17 | |
2316 | 2337 | 18 | |
2040 | 2048 | 17 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 0 | 0 | |||
H2O | 0 | 2000 Bbl | 0 | ONLY A SINGLE SET OF FRAC AND RESERVOIR VOLUMES AND PRESSURES WERE REPORTED FOR THE 2-STAGE FRAC JOB |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | G-R CONTRACTING INC | 515.00 | 46.00 | 365 |
2010 | G-R CONTRACTING INC | 551.00 | 0.00 | 365 |
2011 | G-R CONTRACTING INC | 506.00 | 0.00 | 365 |
2012 | G-R CONTRACTING INC | 595.00 | 0.00 | 366 |
2013 | G-R CONTRACTING INC | 0.00 | 0.00 | 365 |
2014 | G-R CONTRACTING INC | 286.00 | 0.00 | 365 |
2015 | G-R CONTRACTING INC | 0.00 | 0.00 | 365 |
2016 | G-R CONTRACTING INC | 0.00 | 0.00 | 365 |
2017 | G-R CONTRACTING INC | 246.00 | 23.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | G-R CONTRACTING INC | Brine | 0 | 365 |
2010 | G-R CONTRACTING INC | Brine | 0 | 365 |
2011 | G-R CONTRACTING INC | Brine | 0 | 365 |
2012 | G-R CONTRACTING INC | Brine | 0 | 366 |
2013 | G-R CONTRACTING INC | Brine | 0 | 365 |
2014 | G-R CONTRACTING INC | Brine | 0 | 365 |
2015 | G-R CONTRACTING INC | Brine | 0 | 365 |
2016 | G-R CONTRACTING INC | Brine | 0 | 365 |
2017 | G-R CONTRACTING INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1173643526 | 2014-4-17 0:00: | PL | No Violations | 1.20 |
1173643526 | 2014-04-17 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well site and tank battery meet ORC 1509.072 with the following equipment present at the well head-4.5 production casing-1.5 tubing with the production valves open and the well being produced by the means of a pumping unit, 2-100 barrel production tanks are present in an established dike area along with a mechanical separator and proper well identification posted. |
For data sources see[9]