If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24235 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.7,"lon":-81.21,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Wayne Township | |
Operator Name: PROFIT ENERGY COMPANY | |
Well Pad ID: | |
Farm/Lease Name: ECKELBERRY | |
License Status: Producing | |
License Date: 2008-12-05 | |
Spud Date: 2008-12-19 | |
Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC | |
Final Drill Date: 2008-12-23 | |
Well Total Depth: 2610.00 ft | |
Configuration: Vertical | |
Latitude: 39.700000 | |
Longitude: -81.210000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-12-05 | Proposed Formations:BEREA AND OHIO SHALE, Issued Date:12/5/2008, Expired Date:12/5/2009 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-12-23 | |
Completion Report Received | 2009-09-23 | |
Construction Permit Expires | 2009-12-05 | |
Record Last Modified | 2015-09-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2009-12-29 | 1700 | 2413 | 46 |
1700 | 2413 | 46 | |
1700 | 2413 | 46 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 84000 Gal | 0 | INCLUDES WEIR SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | PROFIT ENERGY COMPANY | 555.00 | 0.00 | 157 |
2010 | PROFIT ENERGY COMPANY | 3820.00 | 159.00 | 365 |
2011 | PROFIT ENERGY COMPANY | 3239.00 | 53.00 | 365 |
2012 | PROFIT ENERGY COMPANY | 728.00 | 52.00 | 366 |
2013 | PROFIT ENERGY COMPANY | 1944.00 | 0.00 | 365 |
2014 | PROFIT ENERGY COMPANY | 1631.00 | 24.00 | 365 |
2015 | PROFIT ENERGY COMPANY | 1720.00 | 0.00 | 365 |
2016 | PROFIT ENERGY COMPANY | 3132.00 | 0.00 | 365 |
2017 | PROFIT ENERGY COMPANY | 2464.00 | 31.00 | 365 |
2018 | PROFIT ENERGY COMPANY | 2382.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | PROFIT ENERGY COMPANY | Brine | 70 | 157 |
2010 | PROFIT ENERGY COMPANY | Brine | 0 | 365 |
2011 | PROFIT ENERGY COMPANY | Brine | 83 | 365 |
2012 | PROFIT ENERGY COMPANY | Brine | 102 | 366 |
2013 | PROFIT ENERGY COMPANY | Brine | 50 | 365 |
2014 | PROFIT ENERGY COMPANY | Brine | 12 | 365 |
2015 | PROFIT ENERGY COMPANY | Brine | 0 | 365 |
2016 | PROFIT ENERGY COMPANY | Brine | 53 | 365 |
2017 | PROFIT ENERGY COMPANY | Brine | 106 | 365 |
2018 | PROFIT ENERGY COMPANY | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1283892048 | 2008-12-18 | Drill / Deepen / Reopen | No Violations | RIG IS MOVING IN ON LOCATION AT THE PROPOSED ECKLEBERRY NO.3.NOT STARTED YET. |
1414606331 | 2014-10-29 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the following equipment present at the well head-4.5 production casing-1.5 tubing and pumping rods with the production valves open and the well set up to be produced by the means of a pumping unit. 2-100 barrel production tanks are present in a shared dike area with another well on the lease. Proper well identification is posted and proper vegetation is established. |
For data sources see[9]