If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24240 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.75,"lon":-81.1,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Center Township | |
Operator Name: BECK ENERGY CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: WATSON FRED & JUDY | |
License Status: Producing | |
License Date: 2009-03-27 | |
Spud Date: 2009-04-12 | |
Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC | |
Final Drill Date: 2009-04-15 | |
Well Total Depth: 2680.00 ft | |
Configuration: Vertical | |
Latitude: 39.750000 | |
Longitude: -81.100000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-03-27 | Proposed Formations:BEREA/30 FOOT/GORDON, Issued Date:3/27/2009, Expired Date:3/27/2010 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2009-04-15 | |
Completion Report Received | 2009-06-26 | |
Construction Permit Expires | 2010-03-27 | |
Record Last Modified | 2015-09-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2009-10-08 | 2096 | 2110 | 34 |
2009-10-08 | 2370 | 2410 | 41 |
2096 | 2110 | 34 | |
2370 | 2410 | 41 | |
2510 | 2560 | 51 | |
2096 | 2110 | 34 | |
2009-10-08 | 2510 | 2560 | 51 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 230000 Gal | 40000 | THREE STAGE FRAC…FRAC BAFFLES SET @ 2458' & 2204' |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | BECK ENERGY CORPORATION | 949.00 | 46.00 | 365 |
2010 | BECK ENERGY CORPORATION | 2789.00 | 116.00 | 365 |
2011 | BECK ENERGY CORPORATION | 1859.00 | 53.00 | 365 |
2012 | BECK ENERGY CORPORATION | 1392.00 | 81.00 | 366 |
2013 | BECK ENERGY CORPORATION | 1075.00 | 85.00 | 365 |
2014 | BECK ENERGY CORPORATION | 913.00 | 0.00 | 365 |
2015 | BECK ENERGY CORPORATION | 733.00 | 0.00 | 365 |
2016 | BECK ENERGY CORPORATION | 752.00 | 85.00 | 365 |
2017 | BECK ENERGY CORPORATION | 708.00 | 0.00 | 365 |
2018 | BECK ENERGY CORPORATION | 599.00 | 84.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | BECK ENERGY CORPORATION | Brine | 38 | 365 |
2010 | BECK ENERGY CORPORATION | Brine | 135 | 365 |
2011 | BECK ENERGY CORPORATION | Brine | 32 | 365 |
2012 | BECK ENERGY CORPORATION | Brine | 5 | 366 |
2013 | BECK ENERGY CORPORATION | Brine | 1 | 365 |
2014 | BECK ENERGY CORPORATION | Brine | 0 | 365 |
2015 | BECK ENERGY CORPORATION | Brine | 0 | 365 |
2016 | BECK ENERGY CORPORATION | Brine | 0 | 365 |
2017 | BECK ENERGY CORPORATION | Brine | 0 | 365 |
2018 | BECK ENERGY CORPORATION | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1287974054 | 2010-10-12 | Preliminary Restoration | No Violations | On day of inspection well is supplied with a plunger lift system and 7cas,4.5cas,and 1.5tubing.Dike and id are in place. There is a 100bbl tank .Minor seeding is needed at wellhead. Restoration passed. |
For data sources see[9]