If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24251 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.6,"lon":-81.19,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Washington Township | |
Operator Name: GAS ENTERPRISE COMPANY INC | |
Well Pad ID: | |
Farm/Lease Name: ENGLISH | |
License Status: Producing | |
License Date: 2009-06-30 | |
Spud Date: 2009-07-20 | |
Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC | |
Final Drill Date: 2009-07-24 | |
Well Total Depth: 3090.00 ft | |
Configuration: Vertical | |
Latitude: 39.600000 | |
Longitude: -81.190000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-06-30 | Proposed Formations:5TH/GORDON, Issued Date:6/30/2009, Expired Date:6/30/2010 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2009-07-24 | |
Completion Report Received | 2010-01-08 | |
Construction Permit Expires | 2010-06-30 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2010-04-19 | 2456 | 2564 | 31 |
2456 | 2564 | 31 | |
2456 | 2564 | 31 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2100 Bbl | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | GAS ENTERPRISE COMPANY INC | 192.00 | 0.00 | 365 |
2009 | GAS ENTERPRISE COMPANY INC | 205.00 | 14.00 | 365 |
2010 | GAS ENTERPRISE COMPANY INC | 106.00 | 15.00 | 365 |
2011 | GAS ENTERPRISE COMPANY INC | 400.00 | 102.00 | 365 |
2012 | GAS ENTERPRISE COMPANY INC | 50.00 | 50.00 | 366 |
2013 | GAS ENTERPRISE COMPANY INC | 338.00 | 48.00 | 365 |
2014 | GAS ENTERPRISE COMPANY INC | 89.00 | 0.00 | 365 |
2015 | GAS ENTERPRISE COMPANY INC | 308.00 | 81.00 | 365 |
2016 | GAS ENTERPRISE COMPANY INC | 361.00 | 44.00 | 365 |
2017 | GAS ENTERPRISE COMPANY INC | 292.00 | 42.00 | 365 |
2018 | GAS ENTERPRISE COMPANY INC | 232.00 | 37.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | GAS ENTERPRISE COMPANY INC | Brine | 0 | 365 |
2009 | GAS ENTERPRISE COMPANY INC | Brine | 0 | 365 |
2010 | GAS ENTERPRISE COMPANY INC | Brine | 0 | 365 |
2011 | GAS ENTERPRISE COMPANY INC | Brine | 0 | 365 |
2012 | GAS ENTERPRISE COMPANY INC | Brine | 0 | 366 |
2013 | GAS ENTERPRISE COMPANY INC | Brine | 0 | 365 |
2014 | GAS ENTERPRISE COMPANY INC | Brine | 0 | 365 |
2015 | GAS ENTERPRISE COMPANY INC | Brine | 0 | 365 |
2016 | GAS ENTERPRISE COMPANY INC | Brine | 0 | 365 |
2017 | GAS ENTERPRISE COMPANY INC | Brine | 0 | 365 |
2018 | GAS ENTERPRISE COMPANY INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
2080044174 | 2017-12-08 | Production Wells | No Violations | On this day, I found the well equipped with 4.5 inch diameter casing with the valve open, 2.5 inch diameter tubing with the valve open, and produced by menas of pumping unit with an electric motor. There are (2) 100 barrel steel tanks contained within an earthen dike and proper identification. Tanks are shared production from English #1, 2, 3, and 4. Production records are current. |
For data sources see[9]