34-111-24256

Well Details

Well ID: 34-111-24256
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: TRIAD HUNTER LLC
Well Pad ID: US-OH-000561
Farm/Lease Name: ORMET CORP
License Status: Plugged Back
License Date: 2010-11-04
Spud Date: 2010-10-10
Spud Drilling Contractor: ALPHA DRILLING
Final Drill Date: 2010-10-25
Well Total Depth: 6037.00 ft
Configuration: Vertical
Latitude: 39.710000
Longitude: -80.830000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2009-07-23 Proposed Formations:MARCELLUS SHALE, Issued Date:7/23/2009, Expired Date:7/23/2010 6:00:00 AM, Drilling unit acres:80.36, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2010-09-09 Proposed Formations:MARCELLUS SHALE, Issued Date:9/9/2010, Expired Date:9/8/2012 12:00:00 PM, Drilling unit acres:109.7, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2010-10-01 CORRECTION TO X,Y'S. SURFACE-- X= 2,467,107; Y= 627,582 TARGET--2,462,160; Y= 629,048.
Reached Total Depth 2010-10-25
Plugged Back 2010-10-26
APP 2010-11-04 Proposed Formations:ONODAGA, Issued Date:11/4/2010, Expired Date:11/3/2012 12:00:00 PM, Drilling unit acres:123.1, Proposed Well Type:ST, Proposed Well Class:O
Completion Report Received 2011-06-10
Construction Permit Expires 2012-11-03
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2011-08-16 7197 7422 0
2011-08-16 7801 7730 0
2011-08-16 8337 8660 0
2011-08-16 8713 8954 0
2011-08-16 7474 7577 0
9607 9851 0
9306 9557 0
9011 9243 0
8713 8954 0
8337 8660 0
7801 7730 0
7627 7730 0
7474 7577 0
7197 7422 0
6951 7132 0
6627 6878 0
6329 6580 0
6329 6580 0
2011-08-16 7627 7730 0
2011-08-16 6329 6580 0
2011-08-16 6627 6878 0
2011-08-16 6951 7132 0
2011-08-16 9011 9243 0
2011-08-16 9306 9557 0
2011-08-16 9607 9851 0

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 TRIAD HUNTER LLC 0 0 0

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2011 VIRCO INC Brine 913 240
2013 TRIAD HUNTER LLC Brine 0 5
2014 TRIAD HUNTER LLC Brine 12310 271
2015 TRIAD HUNTER LLC Brine 9281 357
2016 TRIAD HUNTER LLC Brine 4470 367
2017 TRIAD HUNTER LLC Brine 3593 365
2018 TRIAD HUNTER LLC Brine 3201 364
2019 TRIAD HUNTER LLC Brine 1194 90

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1217841735 2014-3-14 0:00: PW No Violations 1.50
-1498733922 2017-8-22 0:00: PW No Violations
-345864517 2018-11-13 0:00 PW No Violations 0.20
-818105496 2010-10-19 0:00 DD No Violations 3.50
-948746236 2011-5-3 0:00:0 PW No Violations 2.00
0080719357 2010-10-16 Drill / Deepen / Reopen No Violations On this date tool pusher called me and notified me that the intermittent job would be at 1:00am.
0180851216 2011-03-21 Production Wells No Violations FOLLOW UP TO NOV # 1971162819 FOLLOW UP TO NOV # 1300727520 On day of inspection, well was leaking gas at flange. Repairs are needed. On two other occasions via phone I notified Bob Hanshumacher of the following problems: There was a complete lack of erosion/sediment controls throughout the well site resulting in substantial erosion. Properly placed sediment fence, seeding and mulching or other BMPs for erosion/sediment control are needed. Migration of sediment through the installed culverts, or sediment blocking the flow through the culverts shall be prevented. Adjacent to the tank battery, there appears to be a separation of the culvert (a surface hole has formed). The culvert needs repaired
0345864517 2018-11-13 Production Wells No Violations On site inspection found 3 wells on the well pad with all 3 being Marcellus shale wells. The wells are equipped with artificial lift technologies and producing off the production tubing. The 5.5 diameter production casing pressure is 100 pounds per square inch (psi). There is a riser pipe on the 9.625 well head section with 100 psi present. Proper well identification is posted and there is an additional well pad between the 3 wells and the production facility. The production fluid storage facility has been reduced to (3) 500 barrel tanks situated inside a polymer lined steel containment dike area.
0525820903 2018-04-12 Production Wells No Violations Status check inspection found the well head production valves in the open position with annular pressure monitoring in place. There is activity around the well pad supporting a second pad adjoining the well pad the said well is on. The company has submitted a simultaneous operations plan that indicated they will put a cage over the wells and establish a perimeter around the wells with barricades in place. Both are being followed out. The well produced into a midstream operation on a nearby pad.
0590822082 2010-10-26 Drill / Deepen / Reopen No Violations On day of inspection Alpha drilling and Halliburton were setting up to set kick-plug. They will rig this rig down and bring a triple rig in from Calgary, Canada to run the horizontal leg on the well. Open hole is drilled to 8 3/4and at a TD of 6100.The rig ran drill pipe to 5976-5100 and set Kick plug. Ran 345 sks of plug cement.
0629898052 2010-10-12 Drill / Deepen / Reopen No Violations Alpha drilling rig is in at the site drilling the surface hole. Will set the surface tomorrow.
0795083834 2011-03-21 Production Wells No Violations FOLLOW UP TO NOV # 1300727520 On day of inspection, well was leaking gas at flange. Repairs are needed. On two other occasions via phone I notified Bob Hanshumacher of the following problems: There was a complete lack of erosion/sediment controls throughout the well site resulting in substantial erosion. Properly placed sediment fence, seeding and mulching or other BMPs for erosion/sediment control are needed. Migration of sediment through the installed culverts, or sediment blocking the flow through the culverts shall be prevented. Adjacent to the tank battery, there appears to be a separation of the culvert (a surface hole has formed). The culvert needs repaired
0818105496 2010-10-19 Drill / Deepen / Reopen No Violations Marsha Newell called on10-18-10 on a Don Persinger w/phone #740-213-7058.He stopped in reporting a brine dumping. I stopped by area of the complaint.Opposum creek at Rt.7 west about 100yards.Two trucks with hoses in the water. The trucks were loading water and getting ready for cement job. There was no evidence of sheen at all. I tried to call the complaintant but not successful. Marsha is with Wayne National forest.
0948746236 2011-05-03 Production Wells No Violations On day of inspection ODNR met with Triad Hunter, USEPA,OEPA and USACE.Site is satisfactory undre ORC1509.A waiver will needed for the large pit per Rob Stonerock.Please contact Columbus.
1137290197 2014-09-09 Production Wells No Violations The southeast meeting was held at the site. The well is a producing well with a large Texas well head. We looked at the process from the well head to the midstream line. Facility is in compliance with 1509 and 1501:9-9-05.
1217841735 2014-03-14 Production Wells No Violations Compliance notice # 1971162819 & # 1300727520 follow up inspection found that the areas mentioned with erosion and sedimentation problems in the initial violations have been addressed along with the well head flange issue, the water impoundment has been emptied and rebuilt with a new liner installed and is standing full of water, additional wells have now been drilled on the well pad causing other areas of the site to have the soil disturbed noting a new production facility being added on the West side of the property to accommodate the Ormet #1 & #2 shale well pads, the preliminary restoration will not be approved on this day but the initial violations have been addressed.
1288044859 2010-10-13 Drill / Deepen / Reopen No Violations On day of inspection Alpha drilling was setting surface pipe and Halliburton was cementing casing. We set 33713 3/8 casing in 360of 17.5open hole. There was 65of 24open hole and 55of 20conductor pipe set. Good circulation.
1297442763 2011-02-01 Completion Testing No Violations On day of inspection well is being fractured by Producers corp. They are fracing the first stage.
1298912012 2011-02-22 Completion Testing No Violations On day of inspection well was being put on line by Triad Hunter. They were flaring gas and getting separator unit in place.
1300727520 2011-03-21 Production Wells Violations Noted On day of inspection, well was leaking gas at flange. Repairs are needed. On two other occasions via phone I notified Bob Hanshumacher of the following problems: There was a complete lack of erosion/sediment controls throughout the well site resulting in substantial erosion. Properly placed sediment fence, seeding and mulching or other BMPs for erosion/sediment control are needed. Migration of sediment through the installed culverts, or sediment blocking the flow through the culverts shall be prevented. Adjacent to the tank battery, there appears to be a separation of the culvert (a surface hole has formed). The culvert needs repaired
1301929446 2011-03-31 Surface Facility Construction No Violations On day Andrew Corder and I went in on site and the hole at south entrance was closed.Location was seeded and mulched. It had been placed on the affected site. The only issue is silt fence.The well leaking problem had been corrected. There is an extension till the date below. To install the silt fence correctly.
1363959518 2013-03-22 Production Wells No Violations Inspection of the well site found the well currently idle due to the drilling of the other 2 wells on the drill pad. 2-400 barrel production tanks are present in an established dike with proper well identification.
1382078735 2016-02-18 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the area affected by the initial well pad construction does have vegetation and erosion control established. There is a fresh water impoundment in place adjacent to the drilling pad. A separate production facility is located near the well pad, this facility will service multiple well pads in the direct area owned by the current registered owner (Triad). Documenting the well head - the well head is complete with the tubing production valve in the open position. There is a hydraulic emergency shut down device located in the production tree outlet. The company has annular pressure gauges on all annulis sections of the well head and the company has a authorized representative periodically checking and documenting all annuli pressures. Addressing the production facility- A total of (8) 400 barrel production tanks are located inside a polymer lined metal containment dike area with (2) low pressure vapor recover units also present inside the dike area. A (6) station commercial tank load out facility is located on the production pad along with a naturel gas compressor and gas processing equipment.
1410282977 2014-09-09 Preliminary Restoration No Violations On the day of my inspection accompanied by ODNR staff and Production Supervisor Rodney Boron, I witnessed that the well was equipped with Cameron casing and tubing wellheads along with a Christmas tree valve assembly and a sand trap controlled manually to a 300bbl frac tank in containment. Production equipment included a GPS Unit, a compressor unit, dehydrator unit, and a fuel skid. Tank battery consisted of 8-500bbl tanks and 2 let down towers all within containment. Also on site were 4 combustors and a pig launcher. The site passed preliminary restoration according to ORC 1509.072A.
1426237318 2014-03-14 Preliminary Restoration No Violations Preliminary restoration status check inspection found that additional wells have now been drilled on the well pad causing other areas of the site to have the soil disturbed noting a new production facility being added on the West side of the property to accommodate the Ormet #1 & #2 shale well pads, the preliminary restoration will not be approved on this day.
1453394270 2016-01-21 Production Wells No Violations On this day I was on site as a follow up inspection to a report of a incident on the production well pad. I received the initial report on 01/20/2016 at 18:15 pm from a Rodney Boron who is a field Supervisor for the company. Upon inspection it was observed that a Heat exchanger tube in the B-Tex system possibly failed causing a over pressurization of the secondary recovery system that has a inlet pressure of 800 psi and outlet pressure of 12 ounces. In the course of the event a small fire occurred on the B-Tex building from the discharged fluid and was extinguished by Triads personnel on site with a 8 lb chemical fire extinguisher. The B-Tex system is a secondary recovery system that works between the gas dehydration system and the glycol heaters on the well production gas processing system. The system manufacturer (Exterran) is scheduled to arrive tomorrow 01/22/2016 to evaluate and re-certify the system. The 3 producing wells along with all the production equipment is shut down at this time. The Monroe County EMA did arrive on site while my inspection was taking place.
1498733922 2017-08-22 Production Wells No Violations Producing well status check inspection found the well equipped with a casing and tubing well head and a 2 production sales line set up to sell product off the tubing well head. The sales line has a hydraulic Emergency Shut Down with no electrically controlled actuation solenoid. The well head is leaking gas from the B-section between the 9.625 & 13.375. On site was Triad Production Foreman Derik Higgins who was informed to install flow lines and pressure relief valves on all well annulis. Mr. Higgins was informed that the gas was not to dispersed into the atmosphere and a permanent recovery system must be installed. The well head assembly gauge showed 1000 psi at surface.
1611328587 2017-08-22 Production Wells No Violations Arrived on location with Inspector William Stolarik. Please refer to his comments for a complete report. Upon inspection the wellhead was leaking from the 9 5/8 inch diameter casing with 1000 psi on the gauge. It was recommend to recover the leaking gas with a low pressure recovery system and divert it to the flowline.
1636098181 2010-10-21 Drill / Deepen / Reopen No Violations On day of inspection alpha rig is running pipe in. Going to load hole with fluid before drilling into the Marcellus. Then they will set a kick plug and will call for notification.
1756055905 2011-08-31 Production Wells No Violations On day of inspection I was accompanied by inspector Brett Farnsworth. Inspection revealed that the well is currently in production and pond that was left on site is properly fenced in. Pond also has life preservers and line running across for emergency situations.
180851216 2011-3-21 0:00: PW No Violations 2.00
1971162819 2011-03-21 Production Wells No Violations FOLLOW UP TO NOV # 1300727520 On day of inspection, well was leaking gas at flange. Repairs are needed. On two other occasions via phone I notified Bob Hanshumacher of the following problems: There was a complete lack of erosion/sediment controls throughout the well site resulting in substantial erosion. Properly placed sediment fence, seeding and mulching or other BMPs for erosion/sediment control are needed. Migration of sediment through the installed culverts, or sediment blocking the flow through the culverts shall be prevented. Adjacent to the tank battery, there appears to be a separation of the culvert (a surface hole has formed). The culvert needs repaired
525820903 2018-4-12 0:00: PW No Violations 0.30
590822082 2010-10-26 0:00 DD No Violations 4.00
629898052 2010-10-12 0:00 DD No Violations 2.00
795083834 2011-3-21 0:00: PW No Violations 2.00
80719357 2010-10-16 0:00 DD No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1300727520 US-OH-108475 2011-03-21 Well insufficiently equipped to prevent escape of oil and gas
1300727520 US-OH-108476 2011-03-21 Statement of annual production not filed
1300727520 US-OH-108477 2011-03-21 Failure to restore land surface witin area disturbed in sighting

For data sources see[8]

References