{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.71,"lon":-80.83,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: <County> | |
| Municipality: | |
| Operator Name: TRIAD HUNTER LLC | |
| Well Pad ID: US-OH-000561 | |
| Farm/Lease Name: ORMET CORP | |
| License Status: Plugged Back | |
| License Date: 2010-11-04 | |
| Spud Date: 2010-10-10 | |
| Spud Drilling Contractor: ALPHA DRILLING | |
| Final Drill Date: 2010-10-25 | |
| Well Total Depth: 6037.00 ft | |
| Configuration: Vertical | |
| Latitude: 39.710000 | |
| Longitude: -80.830000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2009-07-23 | Proposed Formations:MARCELLUS SHALE, Issued Date:7/23/2009, Expired Date:7/23/2010 6:00:00 AM, Drilling unit acres:80.36, Proposed Well Type:OG, Proposed Well Class:POOL |
| APP | 2010-09-09 | Proposed Formations:MARCELLUS SHALE, Issued Date:9/9/2010, Expired Date:9/8/2012 12:00:00 PM, Drilling unit acres:109.7, Proposed Well Type:OG, Proposed Well Class:POOL |
| Correction to Well | 2010-10-01 | CORRECTION TO X,Y'S. SURFACE-- X= 2,467,107; Y= 627,582 TARGET--2,462,160; Y= 629,048. |
| Reached Total Depth | 2010-10-25 | |
| Plugged Back | 2010-10-26 | |
| APP | 2010-11-04 | Proposed Formations:ONODAGA, Issued Date:11/4/2010, Expired Date:11/3/2012 12:00:00 PM, Drilling unit acres:123.1, Proposed Well Type:ST, Proposed Well Class:O |
| Completion Report Received | 2011-06-10 | |
| Construction Permit Expires | 2012-11-03 | |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2011-08-16 | 7197 | 7422 | 0 |
| 2011-08-16 | 7801 | 7730 | 0 |
| 2011-08-16 | 8337 | 8660 | 0 |
| 2011-08-16 | 8713 | 8954 | 0 |
| 2011-08-16 | 7474 | 7577 | 0 |
| 9607 | 9851 | 0 | |
| 9306 | 9557 | 0 | |
| 9011 | 9243 | 0 | |
| 8713 | 8954 | 0 | |
| 8337 | 8660 | 0 | |
| 7801 | 7730 | 0 | |
| 7627 | 7730 | 0 | |
| 7474 | 7577 | 0 | |
| 7197 | 7422 | 0 | |
| 6951 | 7132 | 0 | |
| 6627 | 6878 | 0 | |
| 6329 | 6580 | 0 | |
| 6329 | 6580 | 0 | |
| 2011-08-16 | 7627 | 7730 | 0 |
| 2011-08-16 | 6329 | 6580 | 0 |
| 2011-08-16 | 6627 | 6878 | 0 |
| 2011-08-16 | 6951 | 7132 | 0 |
| 2011-08-16 | 9011 | 9243 | 0 |
| 2011-08-16 | 9306 | 9557 | 0 |
| 2011-08-16 | 9607 | 9851 | 0 |
For data sources see[3]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2013 | TRIAD HUNTER LLC | 0 | 0 | 0 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2011 | VIRCO INC | Brine | 913 | 240 |
| 2013 | TRIAD HUNTER LLC | Brine | 0 | 5 |
| 2014 | TRIAD HUNTER LLC | Brine | 12310 | 271 |
| 2015 | TRIAD HUNTER LLC | Brine | 9281 | 357 |
| 2016 | TRIAD HUNTER LLC | Brine | 4470 | 367 |
| 2017 | TRIAD HUNTER LLC | Brine | 3593 | 365 |
| 2018 | TRIAD HUNTER LLC | Brine | 3201 | 364 |
| 2019 | TRIAD HUNTER LLC | Brine | 1194 | 90 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1217841735 | 2014-3-14 0:00: | PW | No Violations | 1.50 |
| -1498733922 | 2017-8-22 0:00: | PW | No Violations | |
| -345864517 | 2018-11-13 0:00 | PW | No Violations | 0.20 |
| -818105496 | 2010-10-19 0:00 | DD | No Violations | 3.50 |
| -948746236 | 2011-5-3 0:00:0 | PW | No Violations | 2.00 |
| 0080719357 | 2010-10-16 | Drill / Deepen / Reopen | No Violations | On this date tool pusher called me and notified me that the intermittent job would be at 1:00am. |
| 0180851216 | 2011-03-21 | Production Wells | No Violations | FOLLOW UP TO NOV # 1971162819 FOLLOW UP TO NOV # 1300727520 On day of inspection, well was leaking gas at flange. Repairs are needed. On two other occasions via phone I notified Bob Hanshumacher of the following problems: There was a complete lack of erosion/sediment controls throughout the well site resulting in substantial erosion. Properly placed sediment fence, seeding and mulching or other BMPs for erosion/sediment control are needed. Migration of sediment through the installed culverts, or sediment blocking the flow through the culverts shall be prevented. Adjacent to the tank battery, there appears to be a separation of the culvert (a surface hole has formed). The culvert needs repaired |
| 0345864517 | 2018-11-13 | Production Wells | No Violations | On site inspection found 3 wells on the well pad with all 3 being Marcellus shale wells. The wells are equipped with artificial lift technologies and producing off the production tubing. The 5.5 diameter production casing pressure is 100 pounds per square inch (psi). There is a riser pipe on the 9.625 well head section with 100 psi present. Proper well identification is posted and there is an additional well pad between the 3 wells and the production facility. The production fluid storage facility has been reduced to (3) 500 barrel tanks situated inside a polymer lined steel containment dike area. |
| 0525820903 | 2018-04-12 | Production Wells | No Violations | Status check inspection found the well head production valves in the open position with annular pressure monitoring in place. There is activity around the well pad supporting a second pad adjoining the well pad the said well is on. The company has submitted a simultaneous operations plan that indicated they will put a cage over the wells and establish a perimeter around the wells with barricades in place. Both are being followed out. The well produced into a midstream operation on a nearby pad. |
| 0590822082 | 2010-10-26 | Drill / Deepen / Reopen | No Violations | On day of inspection Alpha drilling and Halliburton were setting up to set kick-plug. They will rig this rig down and bring a triple rig in from Calgary, Canada to run the horizontal leg on the well. Open hole is drilled to 8 3/4and at a TD of 6100.The rig ran drill pipe to 5976-5100 and set Kick plug. Ran 345 sks of plug cement. |
| 0629898052 | 2010-10-12 | Drill / Deepen / Reopen | No Violations | Alpha drilling rig is in at the site drilling the surface hole. Will set the surface tomorrow. |
| 0795083834 | 2011-03-21 | Production Wells | No Violations | FOLLOW UP TO NOV # 1300727520 On day of inspection, well was leaking gas at flange. Repairs are needed. On two other occasions via phone I notified Bob Hanshumacher of the following problems: There was a complete lack of erosion/sediment controls throughout the well site resulting in substantial erosion. Properly placed sediment fence, seeding and mulching or other BMPs for erosion/sediment control are needed. Migration of sediment through the installed culverts, or sediment blocking the flow through the culverts shall be prevented. Adjacent to the tank battery, there appears to be a separation of the culvert (a surface hole has formed). The culvert needs repaired |
| 0818105496 | 2010-10-19 | Drill / Deepen / Reopen | No Violations | Marsha Newell called on10-18-10 on a Don Persinger w/phone #740-213-7058.He stopped in reporting a brine dumping. I stopped by area of the complaint.Opposum creek at Rt.7 west about 100yards.Two trucks with hoses in the water. The trucks were loading water and getting ready for cement job. There was no evidence of sheen at all. I tried to call the complaintant but not successful. Marsha is with Wayne National forest. |
| 0948746236 | 2011-05-03 | Production Wells | No Violations | On day of inspection ODNR met with Triad Hunter, USEPA,OEPA and USACE.Site is satisfactory undre ORC1509.A waiver will needed for the large pit per Rob Stonerock.Please contact Columbus. |
| 1137290197 | 2014-09-09 | Production Wells | No Violations | The southeast meeting was held at the site. The well is a producing well with a large Texas well head. We looked at the process from the well head to the midstream line. Facility is in compliance with 1509 and 1501:9-9-05. |
| 1217841735 | 2014-03-14 | Production Wells | No Violations | Compliance notice # 1971162819 & # 1300727520 follow up inspection found that the areas mentioned with erosion and sedimentation problems in the initial violations have been addressed along with the well head flange issue, the water impoundment has been emptied and rebuilt with a new liner installed and is standing full of water, additional wells have now been drilled on the well pad causing other areas of the site to have the soil disturbed noting a new production facility being added on the West side of the property to accommodate the Ormet #1 & #2 shale well pads, the preliminary restoration will not be approved on this day but the initial violations have been addressed. |
| 1288044859 | 2010-10-13 | Drill / Deepen / Reopen | No Violations | On day of inspection Alpha drilling was setting surface pipe and Halliburton was cementing casing. We set 33713 3/8 casing in 360of 17.5open hole. There was 65of 24open hole and 55of 20conductor pipe set. Good circulation. |
| 1297442763 | 2011-02-01 | Completion Testing | No Violations | On day of inspection well is being fractured by Producers corp. They are fracing the first stage. |
| 1298912012 | 2011-02-22 | Completion Testing | No Violations | On day of inspection well was being put on line by Triad Hunter. They were flaring gas and getting separator unit in place. |
| 1300727520 | 2011-03-21 | Production Wells | Violations Noted | On day of inspection, well was leaking gas at flange. Repairs are needed. On two other occasions via phone I notified Bob Hanshumacher of the following problems: There was a complete lack of erosion/sediment controls throughout the well site resulting in substantial erosion. Properly placed sediment fence, seeding and mulching or other BMPs for erosion/sediment control are needed. Migration of sediment through the installed culverts, or sediment blocking the flow through the culverts shall be prevented. Adjacent to the tank battery, there appears to be a separation of the culvert (a surface hole has formed). The culvert needs repaired |
| 1301929446 | 2011-03-31 | Surface Facility Construction | No Violations | On day Andrew Corder and I went in on site and the hole at south entrance was closed.Location was seeded and mulched. It had been placed on the affected site. The only issue is silt fence.The well leaking problem had been corrected. There is an extension till the date below. To install the silt fence correctly. |
| 1363959518 | 2013-03-22 | Production Wells | No Violations | Inspection of the well site found the well currently idle due to the drilling of the other 2 wells on the drill pad. 2-400 barrel production tanks are present in an established dike with proper well identification. |
| 1382078735 | 2016-02-18 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the area affected by the initial well pad construction does have vegetation and erosion control established. There is a fresh water impoundment in place adjacent to the drilling pad. A separate production facility is located near the well pad, this facility will service multiple well pads in the direct area owned by the current registered owner (Triad). Documenting the well head - the well head is complete with the tubing production valve in the open position. There is a hydraulic emergency shut down device located in the production tree outlet. The company has annular pressure gauges on all annulis sections of the well head and the company has a authorized representative periodically checking and documenting all annuli pressures. Addressing the production facility- A total of (8) 400 barrel production tanks are located inside a polymer lined metal containment dike area with (2) low pressure vapor recover units also present inside the dike area. A (6) station commercial tank load out facility is located on the production pad along with a naturel gas compressor and gas processing equipment. |
| 1410282977 | 2014-09-09 | Preliminary Restoration | No Violations | On the day of my inspection accompanied by ODNR staff and Production Supervisor Rodney Boron, I witnessed that the well was equipped with Cameron casing and tubing wellheads along with a Christmas tree valve assembly and a sand trap controlled manually to a 300bbl frac tank in containment. Production equipment included a GPS Unit, a compressor unit, dehydrator unit, and a fuel skid. Tank battery consisted of 8-500bbl tanks and 2 let down towers all within containment. Also on site were 4 combustors and a pig launcher. The site passed preliminary restoration according to ORC 1509.072A. |
| 1426237318 | 2014-03-14 | Preliminary Restoration | No Violations | Preliminary restoration status check inspection found that additional wells have now been drilled on the well pad causing other areas of the site to have the soil disturbed noting a new production facility being added on the West side of the property to accommodate the Ormet #1 & #2 shale well pads, the preliminary restoration will not be approved on this day. |
| 1453394270 | 2016-01-21 | Production Wells | No Violations | On this day I was on site as a follow up inspection to a report of a incident on the production well pad. I received the initial report on 01/20/2016 at 18:15 pm from a Rodney Boron who is a field Supervisor for the company. Upon inspection it was observed that a Heat exchanger tube in the B-Tex system possibly failed causing a over pressurization of the secondary recovery system that has a inlet pressure of 800 psi and outlet pressure of 12 ounces. In the course of the event a small fire occurred on the B-Tex building from the discharged fluid and was extinguished by Triads personnel on site with a 8 lb chemical fire extinguisher. The B-Tex system is a secondary recovery system that works between the gas dehydration system and the glycol heaters on the well production gas processing system. The system manufacturer (Exterran) is scheduled to arrive tomorrow 01/22/2016 to evaluate and re-certify the system. The 3 producing wells along with all the production equipment is shut down at this time. The Monroe County EMA did arrive on site while my inspection was taking place. |
| 1498733922 | 2017-08-22 | Production Wells | No Violations | Producing well status check inspection found the well equipped with a casing and tubing well head and a 2 production sales line set up to sell product off the tubing well head. The sales line has a hydraulic Emergency Shut Down with no electrically controlled actuation solenoid. The well head is leaking gas from the B-section between the 9.625 & 13.375. On site was Triad Production Foreman Derik Higgins who was informed to install flow lines and pressure relief valves on all well annulis. Mr. Higgins was informed that the gas was not to dispersed into the atmosphere and a permanent recovery system must be installed. The well head assembly gauge showed 1000 psi at surface. |
| 1611328587 | 2017-08-22 | Production Wells | No Violations | Arrived on location with Inspector William Stolarik. Please refer to his comments for a complete report. Upon inspection the wellhead was leaking from the 9 5/8 inch diameter casing with 1000 psi on the gauge. It was recommend to recover the leaking gas with a low pressure recovery system and divert it to the flowline. |
| 1636098181 | 2010-10-21 | Drill / Deepen / Reopen | No Violations | On day of inspection alpha rig is running pipe in. Going to load hole with fluid before drilling into the Marcellus. Then they will set a kick plug and will call for notification. |
| 1756055905 | 2011-08-31 | Production Wells | No Violations | On day of inspection I was accompanied by inspector Brett Farnsworth. Inspection revealed that the well is currently in production and pond that was left on site is properly fenced in. Pond also has life preservers and line running across for emergency situations. |
| 180851216 | 2011-3-21 0:00: | PW | No Violations | 2.00 |
| 1971162819 | 2011-03-21 | Production Wells | No Violations | FOLLOW UP TO NOV # 1300727520 On day of inspection, well was leaking gas at flange. Repairs are needed. On two other occasions via phone I notified Bob Hanshumacher of the following problems: There was a complete lack of erosion/sediment controls throughout the well site resulting in substantial erosion. Properly placed sediment fence, seeding and mulching or other BMPs for erosion/sediment control are needed. Migration of sediment through the installed culverts, or sediment blocking the flow through the culverts shall be prevented. Adjacent to the tank battery, there appears to be a separation of the culvert (a surface hole has formed). The culvert needs repaired |
| 525820903 | 2018-4-12 0:00: | PW | No Violations | 0.30 |
| 590822082 | 2010-10-26 0:00 | DD | No Violations | 4.00 |
| 629898052 | 2010-10-12 0:00 | DD | No Violations | 2.00 |
| 795083834 | 2011-3-21 0:00: | PW | No Violations | 2.00 |
| 80719357 | 2010-10-16 0:00 | DD | No Violations |
| Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
|---|---|---|---|---|
| 1300727520 | US-OH-108475 | 2011-03-21 | Well insufficiently equipped to prevent escape of oil and gas | |
| 1300727520 | US-OH-108476 | 2011-03-21 | Statement of annual production not filed | |
| 1300727520 | US-OH-108477 | 2011-03-21 | Failure to restore land surface witin area disturbed in sighting |