X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24271

Well Details

Well ID: 34-111-24271
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Wayne Township
Operator Name: WHITACRE ENTERPRISES
Well Pad ID:
Farm/Lease Name: STIMPERT J.
License Status: Producing
License Date: 2010-05-10
Spud Date: 2010-05-24
Spud Drilling Contractor: R WOLFE DRLG
Final Drill Date: 2010-05-26
Well Total Depth: 2425.00 ft
Configuration: Vertical
Latitude: 39.740000
Longitude: -81.210000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2010-05-10 Proposed Formations:5TH/GORDON, Issued Date:5/10/2010, Expired Date:5/10/2011 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2010-05-26
Completion Report Received 2010-06-08
Construction Permit Expires 2011-05-10
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2010-08-23 2160 2353 23
2160 2353 23
2160 2353 23

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 20 78000 Gal 0 TREATED GORDON & FIFTH SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2010 WHITACRE ENTERPRISES 1720.00 0.00 205
2011 WHITACRE ENTERPRISES 4503.00 68.00 0
2012 WHITACRE ENTERPRISES 3670.00 0.00 366
2013 WHITACRE ENTERPRISES 2545.00 59.00 365
2014 WHITACRE ENTERPRISES 2122.00 11.00 365
2015 WHITACRE ENTERPRISES 1625.00 0.00 365
2016 WHITACRE ENTERPRISES 1775.00 0.00 366
2017 WHITACRE ENTERPRISES 1396.00 0.00 365
2018 WHITACRE ENTERPRISES 1401.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2010 WHITACRE ENTERPRISES Brine 503 205
2011 WHITACRE ENTERPRISES Brine 120
2012 WHITACRE ENTERPRISES Brine 37 366
2013 WHITACRE ENTERPRISES Brine 0 365
2014 WHITACRE ENTERPRISES Brine 0 365
2015 WHITACRE ENTERPRISES Brine 0 365
2016 WHITACRE ENTERPRISES Brine 0 366
2017 WHITACRE ENTERPRISES Brine 0 365
2018 WHITACRE ENTERPRISES Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1595390730 2018-5-22 0:00: PL No Violations 0.60
1595390730 2018-05-22 Preliminary Restoration No Violations On this day, I am conducting a preliminary restoration inspection. Vegetation is established and there is no erosional issues. The site meets ORC 1509.072. The well is equipped with 4.5 inch diameter casing and 1.9 inch diameter tubing with the production valves open. It is produced by means of a pumping unit with rods and a gas engine. The production facility consists of (1) 100 barrel steel tank, drip tank, vertical separator, and a domestic meter all contained within an earthen dike. The tank is properly identified and the production records are current.
2027939520 2010-05-24 Drill / Deepen / Reopen No Violations Wolfe drilling was drilling well. There was 345 of 17lb/ft 7 casing. There was 8 3/4 open hole drilled to 355.Universal well services cemented the casing in place.

For data sources see[9]

References