Well Details

Well ID: 34-111-24279
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Jackson Township
Operator Name: EQUITY OIL & GAS FUNDS INC
Well Pad ID:
Farm/Lease Name: CASPER R
License Status: Producing
License Date: 2010-08-17
Spud Date: 2010-08-23
Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC
Final Drill Date: 2010-08-26
Well Total Depth: 2940.00 ft
Configuration: Vertical
Latitude: 39.580000
Longitude: -81.020000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2010-08-17 Proposed Formations:OHIO SHALE, Issued Date:8/17/2010, Expired Date:8/16/2012 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2010-08-26
Completion Report Received 2011-02-23
Construction Permit Expires 2012-08-16
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2011-05-16 1799 2321 62
2011-05-16 2646 2676 46
1799 2321 62
2646 2676 46
2724 2846 43
1799 2321 62
2011-05-16 2724 2846 43

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2010-09-14 H2O 0 75000 Gal 25000 Producers Service Corporation
2010-09-13 H2O 20 62000 Gal 15500 Producers Service Corporation
2010-09-13 H2O 0 65800 Gal 6500 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2011 EQUITY OIL & GAS FUNDS INC 4249.00 85.00 0
2012 EQUITY OIL & GAS FUNDS INC 1419.00 267.00 366
2013 EQUITY OIL & GAS FUNDS INC 999.00 190.00 365
2014 EQUITY OIL & GAS FUNDS INC 1100.00 93.00 365
2015 EQUITY OIL & GAS FUNDS INC 985.00 186.00 365
2016 EQUITY OIL & GAS FUNDS INC 1316.00 75.00 365
2017 EQUITY OIL & GAS FUNDS INC 1182.00 87.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2011 EQUITY OIL & GAS FUNDS INC Brine 145
2012 EQUITY OIL & GAS FUNDS INC Brine 122 366
2013 EQUITY OIL & GAS FUNDS INC Brine 40 365
2014 EQUITY OIL & GAS FUNDS INC Brine 152 365
2015 EQUITY OIL & GAS FUNDS INC Brine 0 365
2016 EQUITY OIL & GAS FUNDS INC Brine 0 365
2017 EQUITY OIL & GAS FUNDS INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-130525541 2019-1-10 0:00: PW No Violations 0.40
-966521792 2010-9-13 0:00: CT No Violations 3.00
0130525541 2019-01-10 Production Wells No Violations On this day, I found the well equipped with 7 inch diameter surface casing, 4.5 inch diameter production casing, and 1.9 inch diameter tubing with the production valves open. It is setup to be produced by means of a pumping unit with rods and a gas engine. The production facility consists of (1) 100 barrel steel tank, (1) 2,100 gallon polymer tank, a drip tank, vertical separator, and an orifice sales meter all contained within an earthen dike. The production records are current and the tank is properly identified.
0966521792 2010-09-13 Completion Testing No Violations On day of inspection Producers were fracing well and Appalachian were running perforating.1st stage top perf was at 2724and the bottom was at2846.Frac plug at 2700.They used 1500bbl of water. The 2nd stage top perf was at 2646and the bottom was at 2676.Frac plug is at 2400.They ran 1600bbl on this stage. The 3rd stage will be tomorrow.
0986325836 2010-08-24 Drill / Deepen / Reopen No Violations On day of inspection Monroe drilling was in drilling in surface hole. Rig was soaping on hole and had to run 7casing.There was 1230 of 8 3/4 oh and 12057casing.We did not get circulation. Liquid polymer was ran and then a gel flush. Then ran 170 sks reg class A cement at 2%gel and 3%cacl.48 bbl displacement on the rubber plug and we had 450 psi on the lift pressure. We then topped off backside.
1389191759 2014-01-08 Preliminary Restoration No Violations Preliminary Restoration found the well site meets 1509.072 with the following equipment present at the well head- 4.5 production casing-1.5 tubing and pumping rods with the production valves open and the well being produced by the means of a pumping unit. A single 100 barrel production tank is present in an established dike along with a mechanical separator and gas sales meter, proper identification is posted.
1737916713 2010-08-25 Drill / Deepen / Reopen No Violations On day of inspection Monroe was drilling well at a depth of 2,340.They will go to about 2910.Drilling on air and a tricone.Talked with John Murphy consultant for Equity oil and gas.
986325836 2010-8-24 0:00: DD No Violations 8.00

For data sources see[9]