X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24280

Well Details

Well ID: 34-111-24280
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Wayne Township
Operator Name: SANDBAR OIL & GAS CO
Well Pad ID:
Farm/Lease Name: S B SKIDMORE
License Status: Producing
License Date: 2010-08-19
Spud Date: 2010-09-07
Spud Drilling Contractor: R WOLFE DRLG
Final Drill Date: 2010-09-09
Well Total Depth: 2650.00 ft
Configuration: Vertical
Latitude: 39.700000
Longitude: -81.180000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2010-08-19 Proposed Formations:FIFTH SAND, Issued Date:8/19/2010, Expired Date:8/18/2012 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2010-09-09
Completion Report Received 2010-11-05
Construction Permit Expires 2012-08-18
Record Last Modified 2015-09-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2010-12-14 1902 1910 16
2010-12-14 2146 2190 28
1902 1910 16
2146 2190 28
2314 2537 44
1902 1910 16
2010-12-14 2314 2537 44

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2010-09-16 H2O 15 100818 Gal 0 Universal Well Services Inc. STAGE 1 OF 3…GORDON/FIFTH/SHALE
2010-09-16 H2O 15 0 Gal 0 Universal Well Services Inc. STAGE 2 OF 3…FRAC BAFFLE @ 2259'
2010-09-16 H2O 15 44968 Gal 0 Universal Well Services Inc. STAGE 3 OF 3…BAFFLE @ 1970'…BEREA PERF DEPTHS DO NOT CORRELATE WITH OPEN HOLE LOG

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2010 SANDBAR OIL & GAS CO 623.00 27.00 60
2011 SANDBAR OIL & GAS CO 5390.00 125.00 365
2012 SANDBAR OIL & GAS CO 3473.00 55.00 366
2013 SANDBAR OIL & GAS CO 3381.00 32.00 365
2014 SANDBAR OIL & GAS CO 2880.00 0.00 365
2015 SANDBAR OIL & GAS CO 2916.00 28.00 365
2016 SANDBAR OIL & GAS CO 2573.00 0.00 365
2017 SANDBAR OIL & GAS CO 2463.00 31.00 365
2018 SANDBAR OIL & GAS CO 2415.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2010 SANDBAR OIL & GAS CO Brine 150 60
2011 SANDBAR OIL & GAS CO Brine 35 365
2012 SANDBAR OIL & GAS CO Brine 0 366
2013 SANDBAR OIL & GAS CO Brine 20 365
2014 SANDBAR OIL & GAS CO Brine 0 365
2015 SANDBAR OIL & GAS CO Brine 40 365
2016 SANDBAR OIL & GAS CO Brine 40 365
2017 SANDBAR OIL & GAS CO Brine 51 365
2018 SANDBAR OIL & GAS CO Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1359662303 2010-9-7 0:00:0 DD No Violations 4.50
-994214730 2010-9-15 0:00: CT No Violations
0994214730 2010-09-15 Completion Testing No Violations On day of inspection Universal went in to frac well. They just fracked two stages. The 1st stage was 2537-2314.2034psi was break down pressure. The average is 38.8bbl/min at 2750psi.100,818gal total water 1st stage Which was Gordon /5th sand together. The 2nd stage is the thirty foot sand. From 2146-2190 there are 28shots.break down was at 2303psi.average pressure is at 2679-2448psi and at 33bbl/min.Frac baffle is at 2259.Per Jim Toney of JT Wire line open hole log did not correlate to electric log. Difference of 10. 3rd stage was at berea.Frac baffle was at 1970.From 1902-1910 there are 16 shots. break formation at 2100psi.avg.treat pressure is 1800-1900psi at 17bbl/min.500gal of 15%HCL acid was used. Flow back in 4-300bbl tanks. Total water was 41,666gal.
1049173621 2011-11-09 Preliminary Restoration No Violations On day of inspection well was complete with pump jack. Tank batter contents included: one 110 bbl oil storage tank and a mechanical separator. Site met requirements of the ORC and preliminary restoration is now passed.
1359662303 2010-09-07 Drill / Deepen / Reopen No Violations On day of inspection Wolfe drilling was setting surface pipe. There was 760 of 8 3/4 open hole and 740 of 717 lb/ft casing. Good circulation. Good notification.
1528118703 2018-06-04 Production Wells No Violations On this day, I found the well equipped with 8.625 inch diameter surface casing, 4.5 inch diameter production casing, and 1.9 inch diameter tubing with the production valves open. It is produced by means of a pumping unit with rods and an electric motor. The production facility consists of (1) 100 barrel steel tank, drip tank, vertical separator, and an orifice meter all contained within an earthen dike. The production records are current, but the identification needs refreshed.

For data sources see[9]

References