34-111-24286

Well Details

Well ID: 34-111-24286
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Wayne Township
Operator Name: PROFIT ENERGY COMPANY
Well Pad ID:
Farm/Lease Name: ECKLEBERRY
License Status: Producing
License Date: 2010-12-10
Spud Date: 2010-12-15
Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC
Final Drill Date: 2010-12-22
Well Total Depth: 2650.00 ft
Configuration: Vertical
Latitude: 39.700000
Longitude: -81.210000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2010-12-10 Proposed Formations:KEENER, BEREA, OHIO SHALE, Issued Date:12/10/2010, Expired Date:12/9/2012 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2010-12-22
Completion Report Received 2011-08-23
Construction Permit Expires 2012-12-09
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2011-12-20 2005 2304 50
2005 2304 50
2005 2304 50

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2010-10-29 H2O 15 84486 Gal 0 Universal Well Services Inc. 1ST STAGE/GORDON
2010-12-29 H2O 15 72120 Gal 0 Universal Well Services Inc. 2ND STAGE
2011-12-30 H2O 15 43688 Gal 0 Universal Well Services Inc. 3RD STAGE

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2010 PROFIT ENERGY COMPANY 0.00 0.00 0
2011 PROFIT ENERGY COMPANY 1458.00 27.00 350
2012 PROFIT ENERGY COMPANY 1668.00 21.00 366
2013 PROFIT ENERGY COMPANY 4413.00 0.00 365
2014 PROFIT ENERGY COMPANY 3259.00 26.00 365
2015 PROFIT ENERGY COMPANY 2374.00 0.00 365
2016 PROFIT ENERGY COMPANY 2393.00 0.00 365
2017 PROFIT ENERGY COMPANY 1977.00 0.00 365
2018 PROFIT ENERGY COMPANY 2305.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2010 PROFIT ENERGY COMPANY Brine 950 0
2011 PROFIT ENERGY COMPANY Brine 244 350
2012 PROFIT ENERGY COMPANY Brine 60 366
2013 PROFIT ENERGY COMPANY Brine 0 365
2014 PROFIT ENERGY COMPANY Brine 71 365
2015 PROFIT ENERGY COMPANY Brine 0 365
2016 PROFIT ENERGY COMPANY Brine 0 365
2017 PROFIT ENERGY COMPANY Brine 0 365
2018 PROFIT ENERGY COMPANY Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1521542896 2011-11-9 0:00: PW No Violations 0.50
-1787451508 2020-4-16 0:00: PW No Violations 0.30
1342705546 2012-07-19 Preliminary Restoration No Violations Inspection of the well site found the pits filled and vegetation established and the well in production with the following equipment present 4.5 production casing, 1.5 tubing & rods with the production valves open and the well being produced by the means of a pumping unit. 2- 100 barrel tanks and a single mechanical separator are present in an established dike with proper well identification present , inspector will note tank pad is shared between both wells on lease owned by the same producer.
1521542896 2011-11-09 Production Wells No Violations On day of inspection well was complete with pump jack. Tank battery contents included: one 110 bbl oil storage tank and a mechanical separator. Preliminary restoration cannot be cleared at this time due to inadequate vegetation and erosion control.

For data sources see[9]