Well ID: 34-111-24328 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.67,"lon":-81.2,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Washington Township | |
Operator Name: GULFPORT APPALACHIA LLC | |
Well Pad ID: US-OH-000471 | |
Farm/Lease Name: WHITACRE ENTERPRISES INC | |
License Status: Producing | |
License Date: 2012-04-05 | |
Spud Date: 2013-05-15 | |
Spud Drilling Contractor: H A D INC | |
Final Drill Date: 2013-12-26 | |
Well Total Depth: 15941.00 ft | |
Configuration: Horizontal | |
Latitude: 39.670000 | |
Longitude: -81.200000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-04-05 | Proposed Formations:UTICA, Issued Date:4/5/2012, Expired Date:4/5/2014 12:00:00 PM, Drilling unit acres:384.31, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2013-12-26 | |
Construction Permit Expires | 2014-04-05 | |
Change of Owner | 2015-02-25 | Operator changed from 8793, HG ENERGY LLC to 9193, AMERICAN ENERGY UTICA LLC |
Change of Owner | 2015-06-19 | Operator changed from 9193, AMERICAN ENERGY UTICA LLC to 8799, GULFPORT ENERGY CORPORATION |
Completion Report Received | 2016-06-17 | |
Correction to Well | 2017-02-10 | UPDATE TARGET/TAKEPOINT PER AS-DRILLED PLAT-ALE |
Record Last Modified | 2018-04-11 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-04-10 | 11055 | 11199 | 50 |
2018-04-10 | 13756 | 13900 | 50 |
11055 | 11199 | 50 | |
13756 | 13900 | 50 | |
11055 | 11199 | 50 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 04/22/2017 | 04/27/2017 | 9090 | 4,297,860.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | 100 mesh sand | Muskie | PROPPING AGENT | CRYSTALLINE SILICA | 14808-60-7 | 100 | 1.59837 | 633400 |
SC-30 | X-Chem | Scale Inhibitor | Sodium Hydroxide | 1310-73-2 | 1.5 | 0.000247555 | 98.101 | |
28% HCl Acid | X-Chem | ACID | HYDROCHLORIC ACID | 7647-01-0 | 32 | 0.0745599 | 29546.6 | |
WATER | 7732-18-5 | 100 | 0.233 | 92333.1 | ||||
B-84 | X-Chem | Biocide | Ethanol | 64-17-5 | 5 | 0.00130491 | 517.11 | |
n-Alkyl(C12-C16) dimethyl benzyl ammonium chloride | 68424-85-1 | 10 | 0.00260983 | 1034.22 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.00782948 | 3102.66 | ||||
Didecyl dimethyl ammonium chloride | 7173-51-5 | 10 | 0.00260983 | 1034.22 | ||||
40/70 white sand | Muskie | PROPPING AGENT | CRYSTALLINE SILICA IN THE FORM OF QUARTZ | 14808-60-7 | 100 | 7.55325 | 2,993,200.0 | |
Water | Gulfport | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 90.5059 | 35,865,600.0 | |
NEFE-210 | X-Chem | Acid Non-Emulsifier and Iron Control | Tall oil fatty acid | 61790-12-3 | 5 | 0.00007297 | 28.915 | |
Acetic acid | 64-19-7 | 65 | 0.000948574 | 375.901 | ||||
2-Ethyl hexanol | 104-76-7 | 10 | 0.000145934 | 57.831 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 5 | 0.00007297 | 28.915 | ||||
Methyl alcohol | 67-56-1 | 35 | 0.00051077 | 202.408 | ||||
Cocamide DEA | 68603-42-9 | 5 | 0.00007297 | 28.915 | ||||
Propargyl alcohol | 107-19-7 | 5 | 0.00007297 | 28.915 | ||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | Ammonium chloride | 12125-02-9 | 13 | 0.00850842 | 3371.71 | |
Methyl alcohol | 67-56-1 | 35 | 0.00051077 | 202.408 | ||||
n-Alkyl(C12-C16) dimethyl benzyl ammonium chloride | 68424-85-1 | 10 | 0.00260983 | 1034.22 | ||||
Ethanol | 64-17-5 | 5 | 0.00130491 | 517.11 | ||||
Propargyl alcohol | 107-19-7 | 5 | 0.00007297 | 28.915 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 1.5 | 0.000981741 | 389.044 | ||||
Cocamide DEA | 68603-42-9 | 5 | 0.00007297 | 28.915 | ||||
Alcohols, C12-14, ethoxylated | 68439-50-9 | 1.5 | 0.000981741 | 389.044 | ||||
WATER | 7732-18-5 | 100 | 0.233 | 92333.1 | ||||
Tall oil fatty acid | 61790-12-3 | 5 | 0.00007297 | 28.915 | ||||
Didecyl dimethyl ammonium chloride | 7173-51-5 | 10 | 0.00260983 | 1034.22 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 5 | 0.00007297 | 28.915 | ||||
Alcohols, C10-16, ethoxylated | 68002-97-1 | 1.5 | 0.000981741 | 389.044 | ||||
2-Ethyl hexanol | 104-76-7 | 10 | 0.000145934 | 57.831 | ||||
SFR-470 | X-Chem | Friction Reducer | Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.0196348 | 7780.88 | |
Alcohols, C12-16, ethoxylated | 68551-12-2 | 1.5 | 0.000981741 | 389.044 | ||||
Ammonium chloride | 12125-02-9 | 13 | 0.00850842 | 3371.71 | ||||
Alcohols, C12-14, ethoxylated | 68439-50-9 | 1.5 | 0.000981741 | 389.044 | ||||
Alcohols, C10-16, ethoxylated | 68002-97-1 | 1.5 | 0.000981741 | 389.044 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-04-24 | H2O | 15 | 6344 Bbl | 226660 | EVOLUTION WELL SERVICE | STAGE 1/16
STAGES 2-15 SEE IMAGES |
2017-04-27 | H2O | 15 | 6048 Bbl | 225840 | EVOLUTION WELL SERVICE | STAGE 16/16
STAGES 2-15 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | AMERICAN ENERGY UTICA LLC | 0 | 0 | 0 |
2015 | AMERICAN ENERGY UTICA LLC | 0 | 0 | 0 |
2017 | GULFPORT ENERGY CORPORATION | 574470 | 0 | 172 |
2018 | GULFPORT ENERGY CORPORATION | 473630 | 0 | 362 |
2019 | GULFPORT ENERGY CORPORATION | 84603 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | AMERICAN ENERGY UTICA LLC | Brine | 0 | 0 |
2015 | AMERICAN ENERGY UTICA LLC | Brine | 0 | 0 |
2017 | GULFPORT ENERGY CORPORATION | Brine | 6949 | 172 |
2018 | GULFPORT ENERGY CORPORATION | Brine | 5006 | 362 |
2019 | GULFPORT ENERGY CORPORATION | Brine | 829 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1175412169 | 2013-12-26 0:00 | DD | No Violations | 2.00 |
-1834241551 | 2020-3-24 0:00: | PW | No Violations | 1.00 |
-293002091 | 2013-5-15 0:00: | DD | No Violations | 2.00 |
-788657064 | 2015-6-18 0:00: | PL | No Violations | 1.00 |
0293002091 | 2013-05-15 | Drill / Deepen / Reopen | No Violations | The said well was spudded on this day with 80 of 3/8 wall- 20 diameter conductor being set with no annular space. |
0788657064 | 2015-06-18 | Preliminary Restoration | No Violations | Preliminary Restoration Status check inspection found the well location meets 1509.072 with vegetation established and erosion control in place. The well has been drilled but not stimulated. There is however 6 gas processing units on place on location to support each of the 6 wells present in which at this current time all 6 have been drilled but only 3 completed and in production with a total of 6 -210 barrel capacity production fluid tanks present in a plastic lined metal containment dike. In conversation with the newly acquired owners Gulfport Energy they intend on making changes to the well pad perimeter containment by adding functional drain valves at the discharge points along with rebuilding the well pad earthen containment berm. Preliminary Restoration passed on this day. |
1032201241 | 2013-12-22 | Drill / Deepen / Reopen | No Violations | Status check inspection found the current drilling depth to be 10,063 using a 8.5 drill bit in the production borehole stage of the well. The mud weight is 13.25#. A follow up on the recent oil based drilling mud spill found the company working to finish clean up and 3rd party contractors on site. Photographs were taken and the current clean up situation was discussed with my supervisor. |
1175412169 | 2013-12-26 | Drill / Deepen / Reopen | No Violations | Status check inspection on the drilling process found the well production borehole total drilling depth has been reached at 15,941 using a 8.5 drill bit. The recent oil based mud release clean up has been completed and the company is working on installing a fluid recovery pit below the location drain point, all surface water will be recovered from this point. |
1246465250 | 2016-12-29 | Completion Testing | No Violations | On this day I met with Gulfport field supervisor David Wade and reviewed a casing bond log with the log showing over 70% bond at a measured depth of 14,000 in which is the depth that the company proposes to set a 10,000 psi rated cast iron bridge plug to isolate the well bore from the depth the previous plug was set at 15,329 measured depth from surface. They are indicating this is giving them a 500 set back off the BLM property. |
1336687746 | 2013-12-23 | Drill / Deepen / Reopen | No Violations | Status check inspection to follow up on the clean up of the oil based drilling mud release on location. Inspection found several 3rd party agencies on location working to recover the fluid, Matt McGuire with HG was on site and we discussed the clean up procedures as well as future preventive action. Pictures were taken on this day. |
1372165203 | 2013-06-25 | Casing String Witnessed | No Violations | Status check inspection to witness the setting and cementing of 1093 of 13.375 surface pipe. Decker Drilling rig # 6 is on the hole with Baker Hughes cement services. The cement mix water was tested by the Baker Engineer and myself and showed no chlorides and a PH level of 6. There were 40 barrels of cement returns to surface and the casing was pressure tested to 670 psi upon the landing of the plug. |
1386331750 | 2013-12-05 | Drill / Deepen / Reopen | No Violations | HAD drilling rig 105 is now rigging up and shall begin drilling the 9.625 intermediate casing well bore. The company is switching out Blow Out Preventer stacks to a 10,000# stack and shall submit a copy of the BOP test. |
1409590331 | 2016-12-16 | Completion Testing | No Violations | On this day I participated in a conference call between Division staff members discussing the horizontal well bore being drilled across property that has been indicated to be the property and a mineral rights of the Bureau of Land Management (BLM). Gulfport has submitted a proposal to set (2) cast iron bridge plugs with a 500 stand off from the (BLM) property boundary. Gulfport has indicated that the cast iron bridge plugs proposed to be used to plug the wells will satisfy the (BLM). The well was drilled by a previous owner HG Energy. The well stimulation process has not been initiated. |
1479822121 | 2016-11-21 | Completion Testing | No Violations | Status check inspection observed that on this day crews were on site from Wehr well head installing the well head (B) sections and completion master valve assemblies and pressure testing the well head assemblies. |
1482930739 | 2016-12-27 | Completion Testing | No Violations | Status check inspection on the well completion workover process found a service rig on the hole owned by Hybrid drilling. The company man on site David Wade reported that a cast iron bridge plug was set at 15,329 measured depth to cover the 5.5 casing toe sleeve at 15,334. Nine Energy is standing by on location with a wireline truck to run a bond log. |
1483218109 | 2016-12-31 | Completion Testing | No Violations | On site to witness well owner run Cast Iron bridge plug into well, they ran a Baker 10K bridge plug to 14,045 and set it with setting tool and then pulled tubing from well bore and they plan on pressure testing plug to 9800# to confirm that it is holding and then they plan on repeating process and set second plug@14,000 and pressure test it also then they plan on resuming frack operations on said well. |
1483282947 | 2017-01-01 | Completion Testing | No Violations | On site to verify setting depth of CIBP and to pressure test plug integrity, Full Circle was plug tester they applied 2500 psi and then they raised pressure in 2500 psi steps until they reached 9800 psi and we monitored pressure for 15 minutes with a 75 psi loss during test period TEST PASSED and they will run second CIBP and test it also and then they will resume complexation operation. |
1618661012 | 2013-12-16 | Drill / Deepen / Reopen | No Violations | Inspection found the current drilling of the 1st intermediate 12.250 section at 8395. |
1850109360 | 2013-12-11 | Drill / Deepen / Reopen | No Violations | Status check inspection on the current drilling progress found the current drilling depth to be 5,450 using a 12.250 hammer bit and the drilling company pulling out of the hole with the drill string for a bit change. The estimated total depth to be drilled for this intermediate well bore section is 8350. |
1972066749 | 2017-06-27 | Production Wells | No Violations | Status check inspection found 6 wells present on location and in production. All wells are equipped with tubing heads and the production valves are in the open position. A total of 6 gas processing units are present on location. A total of 6 production tanks are present inside a polymer lined steel containment dike area. Proper signage is posted at the well pad entrance on the day of my inspection. |