Well Details

Well ID: 34-111-24331
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Seneca Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-000625
Farm/Lease Name: ET RUBEL
License Status: Plugged Back
License Date: 2012-04-09
Spud Date: 2012-01-29
Spud Drilling Contractor: FRONTIER DRILLING
Final Drill Date: 2012-05-25
Well Total Depth: 8200.00 ft
Configuration: Vertical
Latitude: 39.830000
Longitude: -81.300000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-04-09 Proposed Formations:POINT PLEASANT - BLACK RIVER, Issued Date:4/9/2012, Expired Date:4/9/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Correction to Well 2012-04-20 CORRECTION TO CASING PROGRAM.
Reached Total Depth 2012-05-25
Plugged Back 2012-05-27
Completion Report Received 2012-06-27
Construction Permit Expires 2014-04-09
Record Last Modified 2015-09-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-01-09 10227 10442 60
2013-01-09 9338 9552 60
2013-01-10 9041 9256 60
2013-01-09 11118 11331 60
2013-01-09 13489 13703 60
2013-01-09 13192 13407 60
2013-01-09 13785 14000 60
2013-01-09 14378 14593 60
2013-01-09 14082 14296 60
2013-01-09 12896 13110 60
2013-01-09 11710 11924 60
2013-01-09 9931 10145 60
2013-01-09 11413 11628 60
9041 9256 60
11118 11331 60
10820 11035 60
10524 10738 60
10227 10442 60
9931 10145 60
9634 9849 60
9338 9552 60
8745 8959 60
8448 8663 60
8152 8366 60
14378 14593 60
14082 14296 60
13785 14000 60
13489 13703 60
13192 13407 60
12896 13110 60
12599 12814 60
12303 12517 60
12006 12221 60
11710 11924 60
11413 11628 60
11117 11331 60
2013-01-09 12006 12221 60
8152 8366 60
2013-01-09 12599 12814 60
2013-01-09 12303 12517 60
2013-01-09 10524 10738 60
2013-01-09 11117 11331 60
2013-01-09 10820 11035 60
2013-01-09 9634 9849 60
2013-01-09 8448 8663 60
2013-01-09 8152 8366 60
2013-01-09 8745 8959 60

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 06/26/2012 06/26/2012 7,859 9,718,254

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Carrier/Base Fluid Water 7732-18-5 100.00% 89.39%
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100.00% 10.32%
Water 7732-18-5 20.00% 0.00%
Water 7732-18-5 40.00% 0.02%
Surfactant 68439-51-0 3.00% 0.00%
Ethylene Glycol 107-21-1 31.00% 0.00%
N,N-Dimethylformamide 1968-12-02 15.00% 0.00%
Suspending agent (solid) 14808-60-7 3.00% 0.00%
Cinnamaldehyde 104-55-2 5.00% 0.00%
Triethyl Phosphate 78-40-0 3.00% 0.00%
Water 7732-18-5 87.50% 0.11%
Anionic Copolymer Proprietary Proprietary
Deionized Water 7732-18-5 28.00% 0.00%
Ethoxylated Nonylphenol 68412-54-4 5.00% 0.00%
Water 7732-18-5 30.00% 0.00%
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 13.00% 0.00%
Petroleum Distillates 64742-47-8 22.00% 0.01%
Ammonium Chloride 12125-02-9 5.00% 0.00%
Ethoxylated alcohol blend Proprietary 5.00% 0.00%
Petroleum Distillates 64742-47-8 60.00% 0.07%
Isopropyl Alcohol 67-63-0 3.00% 0.00%
LGC-15 U.S. Well Services, LLC Gelling Agents Guar Gum 9000-30-0 50.00% 0.01%
HCL Acid (12.5%-18.0%) U.S. Well Services, LLC Bulk Acid Hydrogen Chloride 7641-01-01 18.00% 0.05%
WFRA-405 U.S. Well Services, LLC Friction Reducer Anionic Polyacrylamide Proprietary Proprietary
Bioclear 2000 U.S. Well Services, LLC Anti-Bacterial Agent 2,2-dibromo-3-nitrilopropionamide 10222-01-2 20.00% 0.00%
AI-300 U.S. Well Services, LLC Acid Corrosion Inhibitors 2-Butoxyethanol 111-76-2 7.00% 0.00%
AP One U.S. Well Services, LLC Gel Breakers Ammonium Persulfate 7727-54-0 100.00% 0.00%
SI-1000 U.S. Well Services, LLC Scale Inhibitor Ethylene Glycol 107-21-1 20.00% 0.00%

For data sources see[4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 ANTERO RESOURCES CORPORATION Brine 0 0
2013 ANTERO RESOURCES CORPORATION Brine 15244 136
2014 ANTERO RESOURCES CORPORATION Brine 20321 362
2015 ANTERO RESOURCES CORPORATION Brine 8202 365
2016 ANTERO RESOURCES CORPORATION Brine 2915 363
2017 ANTERO RESOURCES CORPORATION Brine 2355 365
2018 ANTERO RESOURCES CORPORATION Brine 2763 360
2019 ANTERO RESOURCES CORPORATION Brine 597 79

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1055457986 2012-5-10 0:00: DD No Violations
-1144138400 2014-3-13 0:00: PW No Violations 1.50
-1304598486 2012-7-6 0:00:0 CT No Violations
-1736047510 2018-3-7 0:00:0 PW No Violations 0.20
-2042933591 2018-3-7 0:00:0 PW No Violations 0.20
-2058474054 2013-10-27 0:00 PW No Violations 1.20
-668358091 2013-8-14 0:00: PW No Violations 1.20
-976500081 2015-6-17 0:00: PL No Violations 0.50
-982918977 2019-1-29 0:00: PW No Violations 0.20
0436728540 2018-03-07 Final Restoration No Violations Status check inspection to document the well was drilled and plugged back and is now operating under the permit number 3411124331-0100.
0583273175 2019-01-24 Production Wells No Violations On this day, I am conducting an inspection to document the SIMOPS progress for the plug and abandonment of permit number 4446. I spoke with Antero representative Barney Etcher, and he stated the SIMOPS process is being delayed due creating a standard operating procedure between departments within Antero Resources. Containment is being set in place and steel cages for the producing wells are onsite. The well in question currently has a nightcap in place and no gauges are present. I found the pad gated with signage at the entrance. There are (6) producing wells, (6) gas processing units (GPU), (4) 400-barrel steel production tanks within polymer lined steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Additionally, concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 100 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 0 psi.
0668358091 2013-08-14 Production Wells No Violations The said well is now in production. The tubing pressure id 3745 psi. I asked the company man on site to place proper well identification on each well head.
0976500081 2015-06-17 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the well location has proper erosion control and vegetation established. The company has recently added additional earthen containment around the well pad perimeter. Addressing the well status the well drilling and completion process is complete with the well in production with additional gas processing equipment located on the well pad in a separate location from the producing wells, there is also a total of 8-400 barrel capacity production fluid tanks on location located inside a plastic lined metal dike area with proper well identification posted at the well head. Preliminary Restoration passed on this day.
0982918977 2019-01-29 Production Wells No Violations On this day, I found Antero progressing with the SimOps procedure in preparation for the plug and abandonment of permit number 4446. TekSolv is onsite installing back-pressure valves in the tubing hanger on the (6) producing wells on the pad, prior to installing the steel cages over the wellheads. Fortis Energy is also onsite installing containment and preparing to rig-up, once the SimOps procedures have been completed. I spoke with Antero Representative Barney Etcher during the inspection.
1055457986 2012-05-10 Drill / Deepen / Reopen No Violations Stopped by drill rig for update on upcoming surface job, consultant stated that they should be ready to cement pipe in place late Friday night or Saturday morning.
1144138400 2014-03-13 Production Wells No Violations Inspector Eric Conrad and myself met on site with Anteros production supervisor Daren Rader discussing several site concerns listed as follows, site entry point identification, proper site soil compaction over the recently installed production flow lines, procedures for identifying temporary storage tanks with proper liquid content identification, general procedure safety during the completion drill out process, proper mapping and identification of buried underground production lines, proper containment under all fluid vessels on site. Mr. Rader understood this was to be addressed as procedure concerns on all Antero sites in general.
1304598486 2012-07-06 Completion Testing No Violations Inspection revealed that frac job is complete and company is getting ready to start flow back process, currently rigging up flare stack and flow back lines to 500 bbl storage tanks.
1339619398 2012-06-13 Drill / Deepen / Reopen No Violations Total depth@14,686 preparing to run 5.5 casing.
1361302138 2013-02-19 Production Wells No Violations Inspection of the well and site found the well has been completed and is idle waiting on a gas transportation line to installed. 8- 400 barrel production tanks are present on location in a lined metal pit. A lined fresh water impoundment is located on location in a fenced in area.
1385061534 2013-11-20 Production Wells Violations Noted On site electrical inspection with Brad Sellers the Divisions inter agency coordinator and a inspector with the Ohio Department of Commerce- electrical inspector, On the day of inspection deficiencies were found in the grounding system on the electrical service feeding the site, We also discovered a 500 barrel tank on site used for flow back operations with no plugs in the outlets. Anteros people were on site and made the needed corrections accordingly.
1389812434 2014-01-15 Preliminary Restoration No Violations Status check inspection found the well in production and the boundary areas disturbed by the well pad construction have ample vegetation. 8- 400 barrel production tanks are located in a containment dike area.
1677943755 2012-06-11 Drill / Deepen / Reopen No Violations Total depth@14,686 conditioning well bore will run 5.5 casing on Wednesday.
1736047510 2018-03-07 Production Wells No Violations Status check inspection accompanied by ODNR Inspector Tom Thomas to document the well status. The well is equipped with a casing and tubing well head assembly with (2) manually operated valves on the tubing well head and one emergency shut down valve on the tubing tree production flow line. The well head casing flow line is also tied into the production flow line however the valves are in the closed position. The 13.375 and 9.625 casing well head assemblies have flowlines with valves and gauges installed to monitor annular pressure. The 13.375 casing well head pressure gauge reads (0) zero pounds pressure and the 9.625 casing well head reads 700 pounds pressure. On pad total is (6) complete wells supported by (6) gas processing units. Also on location is a production fluid facility consisting of a total of (8) steel construction tanks with a capacity of 400 barrels of fluid each, the tanks are situated inside a polymer lined steel containment dike area.
1884522499 2013-10-02 Preliminary Restoration No Violations Status check inspection on the well and location, On this day I spoke with Anteros safety coordinator and asked that each well head have proper identification and proper identification be placed at the entry point of the location. There are also contractors on site emptying the earthen pit and preparing to close it in. The area around the site has vegetation established and the drilling equipment has been moved off with the well currently in production. The tank battery has been erected on the site pad with 8-400 barrel production tanks present.
2042933591 2018-03-07 Production Wells No Violations On this day, I accompanied ODNR Inspector William Stolarik. Please refer to his comments for a detailed report. The well is equipped with annular pressure monitoring devices. Concrete barriers surround the wellheads. The facility is gated with an electronic shutdown button on the right-hand side, prior to the pad. The front left of the pad is equipped with (8) 400 barrel steel tanks within containment and an electronic shutdown button. There are (6) gas processing units along the front right side of the pad, and a midstream facility along the front right side, as well.
2058474054 2013-10-27 Production Wells No Violations Follow up inspection to complaint # 4510 forwarded over from Aaron Wolfe with the Ohio EPA, The photographs sent to the EPA by Ruth Partin were reviewed by my Supervisor Rocky King and Myself and along with the EPA it was found no violations were present in the photos, The request by Ruth Partin to disclose the nature of the production equipment on location will be for site safety reasons forwarded to Anteros public relations department for answering, The EPA provided only a email address and failed to document a time or day of contact as well as any personal contact information for Ruth Partin. My on site inspection found my recent request after my last inspection on 10/02/2013 to post proper identification met, All 3 wells on location are in production and a Myers tank truck was on location withdrawing processed water with proper safety grounding and spill containment in place while loading, The Myers UIC number was also properly posted on the tank truck.
436728540 2018-3-7 0:00:0 FR No Violations 0.10
583273175 2019-1-24 0:00: PW No Violations 0.20
719848104 2020-9-23 0:00: PL No Violations 0.30

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1385061534 US-OH-111443 2014-04-10 General Safety