Well ID: 34-111-24362 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.81,"lon":-81.3,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Seneca Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-000538 | |
Farm/Lease Name: YONTZ UNIT | |
License Status: Producing | |
License Date: 2014-05-07 | |
Spud Date: 2013-03-15 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2013-04-20 | |
Well Total Depth: 13552.00 ft | |
Configuration: Horizontal | |
Latitude: 39.810000 | |
Longitude: -81.300000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-10-30 | Proposed Formations:POINT PLEASANT-BLACK RIVER, Issued Date:10/30/2012, Expired Date:10/30/2014 12:00:00 PM, Drilling unit acres:392.313, Proposed Well Type:OG, Proposed Well Class:EDPW |
APP | 2013-03-06 | Proposed Formations:POINT PLEASANT, Issued Date:3/6/2013, Expired Date:3/6/2015 12:00:00 PM, Drilling unit acres:155.168, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2013-04-20 | |
Correction to Well | 2013-07-05 | CORRECTION TO SURFACE AND TARGET INFORMATION (FOOTAGE & X,Y COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE INCREASED TO 449.996 ACRES. |
Completion Report Received | 2013-07-15 | |
Correction to Well | 2013-07-26 | UNIT SIZE DECREASED TO 446.834 ACRES. |
Correction to Well | 2013-10-25 | CHANGE IN SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND X,Y COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 448.074 ACRES. |
APP | 2014-05-07 | Proposed Formations:POINT PLEASANT, Issued Date:5/7/2014, Expired Date:5/6/2016 12:00:00 PM, Drilling unit acres:448.074, Proposed Well Type:OG, Proposed Well Class:EDPW |
Construction Permit Expires | 2016-05-06 | |
Record Last Modified | 2017-04-18 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-07-16 | 8457 | 13492 | 0 |
8457 | 13492 | 0 | |
8457 | 13492 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 05/11/2013 | 05/15/2013 | 8315 | 7,290,150.0 | 342824 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | AP-One | U.S. Well Services | Gel Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.001 | 990 |
Water | Antero Resources | Base Fluid | Water | 7732-18-5 | 100 | 89.48 | 60,739,100.0 | |
AI-300 | U.S. Well Services, LLC | Acid Corrosion Inhibitor | Ethoxylated Nonylphenol | 68412-54-4 | 5 | 0 | 10.1 | |
Ethylene Glycol | 107-21-1 | 31 | 0 | 65.2 | ||||
Isopropyl Alcohol | 67-63-0 | 3 | 0 | 4.5 | ||||
N,N-Dimethylformamide | 68-12-2 | 15 | 0 | 25.4 | ||||
Water | 7732-18-5 | 20 | 0 | 38.3 | ||||
Triethyl Phosphate | 78-40-0 | 3 | 0 | 6.1 | ||||
Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 13 | 0 | 25.4 | ||||
Cinnamaldehyde | 104-55-2 | 5 | 0 | 9.9 | ||||
2-Butoxyethanol | 111-76-2 | 7 | 0 | 12.1 | ||||
SI-1000 | U.S. Well Services, LLC | Scale Inhibitor | Anionic Copolymer | Proprietary | 0 | 0.004 | 2857.8 | |
Water | 7732-18-5 | 30 | 0.003 | 2154.2 | ||||
Ethylene Glycol | 107-21-1 | 20 | 0.004 | 2583.2 | ||||
K-BAC 1020 | U.S. Well Services, LLC | Anti-Bacterial Agent | Deionized Water | 7732-18-5 | 28 | 0.003 | 1744.4 | |
2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.005 | 3053.9 | ||||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 10.329 | 7,011,420.0 | |
LGC-15 | U.S. Well Services, LLC | Gelling Agent | Surfactant | 68439-51-0 | 3 | 0.002 | 1484 | |
Guar Gum | 9000-30-0 | 50 | 0.036 | 24733.5 | ||||
Petroleum Distillates | 64742-47-8 | 60 | 0.035 | 23424.1 | ||||
Suspending Agent | 14808-60-7 | 3 | 0.006 | 3782.7 | ||||
WFRA-405 | U.S. Well Services, LLC | Friction Reducer | Petroleum Distillates | 64742-47-8 | 40 | 0.017 | 11448.2 | |
HCl Acid (12.5% - 18%) | U.S. Well Services, LLC | Bulk Acid | Water | 7732-18-5 | 40 | 0.028 | 19162.8 | |
Hydrogen Chloride | 7641-01-1 | 60 | 0.048 | 58121.4 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-05-11 | H2O | 15 | 8689 Bbl | 356900 | US Well Services Inc | STAGE 2
60 SHOTS |
2013-05-15 | H2O | 15 | 356980 Bbl | 8588 | US Well Services Inc | STAGE 17
60 SHOTS |
2013-05-13 | H2O | 15 | 8544 Bbl | 360200 | US Well Services Inc | STAGE 11
60 SHOTS |
2013-05-15 | H2O | 15 | 8204 Bbl | 356440 | US Well Services Inc | STAGE 18
60 SHOTS |
2013-05-13 | H2O | 15 | 8684 Bbl | 355805 | US Well Services Inc | STAGE 13
60 SHOTS |
2013-05-14 | H2O | 15 | 8614 Bbl | 357095 | US Well Services Inc | STAGE 16
60 SHOTS |
2013-05-15 | H2O | 15 | 8412 Bbl | 358055 | US Well Services Inc | STAGE 19
60 SHOTS |
2013-05-10 | H2O | 15 | 8545 Bbl | 348300 | US Well Services Inc | STAGE 1
60 SHOTS |
2013-05-13 | H2O | 15 | 8504 Bbl | 356065 | US Well Services Inc | STAGE 12
60 SHOTS |
2013-05-14 | H2O | 15 | 9445 Bbl | 324450 | US Well Services Inc | STAGE 14
60 SHOTS |
2013-05-14 | H2O | 15 | 8054 Bbl | 347500 | US Well Services Inc | STAGE 15
60 SHOTS |
2013-05-12 | H2O | 15 | 8723 Bbl | 356335 | US Well Services Inc | STAGE 6
60 SHOTS |
2013-05-13 | H2O | 15 | 8636 Bbl | 358585 | US Well Services Inc | STAGE 9
60 SHOTS Carbon fiber plug set @ 11,500' 60 perforations total. Frac Gradient 1.10. |
2013-05-13 | H2O | 15 | 8571 Bbl | 359120 | US Well Services Inc | STAGE 10
60 SHOTS |
2013-05-12 | H2O | 15 | 9174 Bbl | 341775 | US Well Services Inc | STAGE 7
60 SHOTS |
2013-05-15 | H2O | 15 | 8508 Bbl | 356400 | US Well Services Inc | STAGE 20
60 SHOTS |
2013-05-12 | H2O | 15 | 8665 Bbl | 360880 | US Well Services Inc | STAGE 8
60 SHOTS |
2013-05-11 | H2O | 15 | 8765 Bbl | 360070 | US Well Services Inc | STAGE 4
60 SHOTS |
2013-05-11 | H2O | 15 | 8645 Bbl | 357295 | US Well Services Inc | STAGE 3
60 SHOTS |
2013-05-12 | H2O | 15 | 9574 Bbl | 283174 | US Well Services Inc | STAGE 5
60 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | ANTERO RESOURCES CORPORATION | 1444621 | 169 | 138 |
2014 | ANTERO RESOURCES CORPORATION | 969671 | 1 | 358 |
2015 | ANTERO RESOURCES CORPORATION | 529786 | 121 | 361 |
2016 | ANTERO RESOURCES CORPORATION | 353730 | 38 | 363 |
2017 | ANTERO RESOURCES CORPORATION | 303793 | 59 | 365 |
2018 | ANTERO RESOURCES CORPORATION | 236645 | 83 | 365 |
2019 | ANTERO RESOURCES CORPORATION | 50329 | 38 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | ANTERO RESOURCES CORPORATION | Brine | 12621 | 138 |
2014 | ANTERO RESOURCES CORPORATION | Brine | 15536 | 358 |
2015 | ANTERO RESOURCES CORPORATION | Brine | 4255 | 361 |
2016 | ANTERO RESOURCES CORPORATION | Brine | 3208 | 363 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 2132 | 365 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 1655 | 365 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 305 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1485212194 | 2019-1-29 0:00: | PW | No Violations | 0.10 |
-1495067021 | 2013-3-16 0:00: | AM | No Violations | |
-1967824512 | 2013-4-22 0:00: | AM | No Violations | |
-2005035894 | 2013-4-4 0:00:0 | DD | No Violations | |
-256041210 | 2013-12-12 0:00 | PW | No Violations | 1.00 |
-478070717 | 2013-3-28 0:00: | DD | No Violations | |
-86688573 | 2013-5-30 0:00: | CT | No Violations | |
0086688573 | 2013-05-30 | Completion Testing | No Violations | Status check inspection on the drilling out of the completion plugs found the company rigging up to start their clean out run. I also discussed the placement of the Methanol on site and had the company move the stored material away from their line heaters. |
0145677537 | 2014-07-30 | Preliminary Restoration | No Violations | Status check inspection on the preliminary restoration found the well drilling and stimulation process is now complete and the well is in line and producing with 8- 400 barrel production tanks on site servicing all 6 wells on the drill pad now in production. |
0256041210 | 2013-12-12 | Production Wells | No Violations | The well is in production and on line, The company has completed 3 wells on the pad and is currently in the process of drilling 3 more. |
0381279361 | 2018-03-07 | Production Wells | No Violations | Status check inspection accompanied by ODNR Inspector Tom Thomas to document the well status. The well is equipped with a casing and tubing well head assembly with (2) manually operated valves on the tubing well head and one emergency shut down valve on the tubing tree production flow line. The well head casing flow line is also tied into the production flow line however the valves are in the closed position. The 13.375 and 9.625 casing well head assemblies have flowlines with valves and gauges installed to monitor annular pressure. No 13.375 casing well head pressure gauge is present and the 9.625 casing well head reads 1,500 pounds pressure. On pad total is (6) complete wells supported by (6) gas processing units. Also on location is a production fluid facility consisting of a total of (8) steel construction tanks with a capacity of 400 barrels of fluid each, the tanks are situated inside a polymer lined steel containment dike area. The well lease road entrance is gated and locked with signage posted at the entrance of the well pad and at each well head. The well pad has a stone surface along with the lease road. The well pad perimeter berm is of earthen material and in good repair. |
0478070717 | 2013-03-28 | Drill / Deepen / Reopen | No Violations | Inspector received phone notification and stopped by the drill site in regards to the completion of the current intermediate drilling stage total drilling depth being reached. A total depth of 2036 was reached using a 17.50 bit and the company is conditioning the bore hole preparing to run the 13.375 intermediate casing string. The casing tally was reviewed and received noting proper centralizer placement along with a casing shoe and float collar being ran. |
0504757431 | 2018-03-07 | Production Wells | No Violations | On this day, I accompanied ODNR Inspector William Stolarik. Please refer to his comments for a detailed report. The well is equipped with annular pressure monitoring devices. Concrete barriers surround the wellheads. The facility is gated with an electronic shutdown button on the right-hand side, prior to the pad. The front left of the pad is equipped with (8) 400 barrel steel tanks within containment and an electronic shutdown button. There are (6) gas processing units along the back of the pad, and a midstream facility behind the gas processing units. |
0663806946 | 2013-04-01 | Drill / Deepen / Reopen | No Violations | Inspection and notification documentation of the setting of the 13.375 casing string. Notification was received and inspector was in phone contact with the rig supervisor on 03/29/2013 with notice received of the running and setting of 2026 of 13.375 production casing, with cement returns to surface and all records received on 04/01/2013. |
1256844914 | 2013-03-20 | Drill / Deepen / Reopen | No Violations | Status check inspection found the drilling company finishing hooking up to the conductor pipe and getting ready to start drilling their surface hole. |
1276299159 | 2013-03-26 | Drill / Deepen / Reopen | No Violations | Inspection of the drilling process found the current depth of 1350 using a 17.5 bit and drilling on air. The company is currently running a borehole deviation survey. |
1349898448 | 2020-5-22 0:00: | PW | No Violations | 1.00 |
1363519559 | 2013-03-16 | Administrative Inspection | No Violations | Inspector receive notification that the said well has been spudded on this day and the top hole rig is attempting to set the tin horn or cellar. |
1364127046 | 2013-03-23 | Drill / Deepen / Reopen | No Violations | Inspector on site to witness the running and cementing of the 18.625 surface casing, 378 of casing was set and cemented back to surface with 100% cement excess ran and 110 bbl of cement returns to surface, the casing was tested to 600 psi over lift pressure upon the landing of the cement plug. |
1365426388 | 2013-04-08 | Drill / Deepen / Reopen | No Violations | Status check inspection on the current drilling progress found the current drilling depth to be 6882 using a 12.250 drill bit. Total depth to e drilled for this stage is 7090. |
1365725848 | 2013-04-11 | Drill / Deepen / Reopen | No Violations | Status check inspection to witness the 2nd stage of the 9.625 casing cement job. |
1366045645 | 2013-04-15 | Drill / Deepen / Reopen | No Violations | Inspection and status check on the drilling progress found the current drilling depth to be 7520 using a 8.5 drill bit with the current bore hole position in the Horizontal curve section and drilling on oil base mud. |
1366333323 | 2013-04-18 | Drill / Deepen / Reopen | No Violations | Status check inspection @ 7:30 Am found the current drilling depth to be 11,608 using a 8.5 drill bit and oil based drilling fluid with the current bore hole position in the horizontal section. The projected well total bore hole depth is to be 13,542. |
1366337907 | 2013-04-18 | Drill / Deepen / Reopen | No Violations | I received a call from the rig superintendent at 11:15 Am requesting me to return to the drilling rig due to a flow line failure casing oil based drilling mud to be discharged under pressure across the South East side of the drill site impoundment. Upon arrival I photographed the site and did a perimeter check finding no drilling fluids had left the site. A remedial clean up procedure was discussed with the affected surface material already being cleaned up and placed into box containers and being hauled to a EPA approved landfill. There was damage to contractor vehicles by flying debris, the vehicles and a mud loggers trailer were also covered by oil based mud. All equipment to be cleaned will be done inside of a containment area and the site will have and surface water and oil base mud vacuumed up and the material hauled to an approved disposal facility for the remainder of the project. |
1366752181 | 2013-04-23 | Drill / Deepen / Reopen | No Violations | Inspection found the drilling rig currently broke down while in the process of running the 5.5 production casing. Review of the area affected by the oil based drilling fluid spill on 04/18/13 found the affected area cleaned up. |
1366975743 | 2013-04-25 | Drill / Deepen / Reopen | No Violations | Upon inspection it was found that the well bore drilling process has been completed and the drilling rig is rigging down and moving off location. Inspector will note that I had to call Neighbors Completion services and have a correct cement job log ticket emailed to me for the 5.5 production casing. |
1368451957 | 2013-05-13 | Completion Testing | No Violations | Status check inspection of the completion process found US Well Service currently stimulating the 9th stage to be completed. |
1370526726 | 2013-06-06 | Completion Testing | No Violations | Status check inspection of the completion process found the stimulation process and well bore clean out complete. The well is waiting the completion of the transportation gas line and then will be put in line. |
1383150412 | 2013-10-30 | Production Wells | No Violations | Inspection found the well capable of production and 8- 400 barrel production tanks located on site. |
1386949410 | 2013-12-12 | Production Wells | No Violations | Bill Stolarik and I stopped in at the location and inspected the site. Well is in production. Tanks, dike and identifications are in place. |
145677537 | 2014-7-30 0:00: | PL | No Violations | 0.50 |
1485212194 | 2019-01-29 | Production Wells | No Violations | On this day, I found the pad gated with signage at the entrance. There are (6) producing wells, (6) gas processing units, (4) 400-barrel steel production tanks within steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 0 pounds per square inch (psi), and the 13.375 inch diameter surface casing does not have a gauge. The company will be contacted about having a gauge in place. |
1495067021 | 2013-03-16 | Administrative Inspection | No Violations | The company man on site notified me on Sunday @ 2:00 PM that the top hole rig contractors Ranson is not able to reach the 100 mark needed as per permit conditions on their conductor string due to being in solid bedrock and the rig not being able to drill the hard shale rock. I notified my supervisor and asked permission for them to set conductor @ 85; After discussion and permit review and the understanding that the next string to be set is the surface pipe @ 340 My supervisor Rocky and myself agreed that they could set the conductor at 85. Notification was sent to Steve Opritza in the Divisions permitting section on 03/18/13. |
1512766814 | 2013-05-28 | Completion Testing | No Violations | Status check inspection found the service co completed drilling out the bridge plugs and pulling out of the hole with the tubing work over drill string and preparing to run in the hole with the tubing production string to be set at 8723. |
1967824512 | 2013-04-22 | Administrative Inspection | No Violations | Notification was received from the company man on site in regards to the well bore total drilling depth of 13,552 being reached and the company getting ready to run the production casing. |
2005035894 | 2013-04-04 | Drill / Deepen / Reopen | No Violations | Status check inspection found the current drilling depth of 5052 and the rig pulling out of the hole with the drill string to pick up a tri cone drill bit due to the formation making fluid and the hammer bit not making acceptable progress. |
381279361 | 2018-3-7 0:00:0 | PW | No Violations | |
504757431 | 2018-3-7 0:00:0 | PW | No Violations | 0.20 |
663806946 | 2013-4-1 0:00:0 | DD | No Violations | 2.00 |
For data sources see[10]