X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24362

Well Details

Well ID: 34-111-24362
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Seneca Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-000538
Farm/Lease Name: YONTZ UNIT
License Status: Producing
License Date: 2014-05-07
Spud Date: 2013-03-15
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2013-04-20
Well Total Depth: 13552.00 ft
Configuration: Horizontal
Latitude: 39.810000
Longitude: -81.300000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-10-30 Proposed Formations:POINT PLEASANT-BLACK RIVER, Issued Date:10/30/2012, Expired Date:10/30/2014 12:00:00 PM, Drilling unit acres:392.313, Proposed Well Type:OG, Proposed Well Class:EDPW
APP 2013-03-06 Proposed Formations:POINT PLEASANT, Issued Date:3/6/2013, Expired Date:3/6/2015 12:00:00 PM, Drilling unit acres:155.168, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-04-20
Correction to Well 2013-07-05 CORRECTION TO SURFACE AND TARGET INFORMATION (FOOTAGE & X,Y COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE INCREASED TO 449.996 ACRES.
Completion Report Received 2013-07-15
Correction to Well 2013-07-26 UNIT SIZE DECREASED TO 446.834 ACRES.
Correction to Well 2013-10-25 CHANGE IN SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND X,Y COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 448.074 ACRES.
APP 2014-05-07 Proposed Formations:POINT PLEASANT, Issued Date:5/7/2014, Expired Date:5/6/2016 12:00:00 PM, Drilling unit acres:448.074, Proposed Well Type:OG, Proposed Well Class:EDPW
Construction Permit Expires 2016-05-06
Record Last Modified 2017-04-18

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-07-16 8457 13492 0
8457 13492 0
8457 13492 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/11/2013 05/15/2013 8315 7,290,150.0 342824

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 AP-One U.S. Well Services Gel Breaker Ammonium Persulfate 7727-54-0 100 0.001 990
Water Antero Resources Base Fluid Water 7732-18-5 100 89.48 60,739,100.0
AI-300 U.S. Well Services, LLC Acid Corrosion Inhibitor Ethoxylated Nonylphenol 68412-54-4 5 0 10.1
Ethylene Glycol 107-21-1 31 0 65.2
Isopropyl Alcohol 67-63-0 3 0 4.5
N,N-Dimethylformamide 68-12-2 15 0 25.4
Water 7732-18-5 20 0 38.3
Triethyl Phosphate 78-40-0 3 0 6.1
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 13 0 25.4
Cinnamaldehyde 104-55-2 5 0 9.9
2-Butoxyethanol 111-76-2 7 0 12.1
SI-1000 U.S. Well Services, LLC Scale Inhibitor Anionic Copolymer Proprietary 0 0.004 2857.8
Water 7732-18-5 30 0.003 2154.2
Ethylene Glycol 107-21-1 20 0.004 2583.2
K-BAC 1020 U.S. Well Services, LLC Anti-Bacterial Agent Deionized Water 7732-18-5 28 0.003 1744.4
2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.005 3053.9
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 10.329 7,011,420.0
LGC-15 U.S. Well Services, LLC Gelling Agent Surfactant 68439-51-0 3 0.002 1484
Guar Gum 9000-30-0 50 0.036 24733.5
Petroleum Distillates 64742-47-8 60 0.035 23424.1
Suspending Agent 14808-60-7 3 0.006 3782.7
WFRA-405 U.S. Well Services, LLC Friction Reducer Petroleum Distillates 64742-47-8 40 0.017 11448.2
HCl Acid (12.5% - 18%) U.S. Well Services, LLC Bulk Acid Water 7732-18-5 40 0.028 19162.8
Hydrogen Chloride 7641-01-1 60 0.048 58121.4

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-05-11 H2O 15 8689 Bbl 356900 US Well Services Inc STAGE 2

60 SHOTS

2013-05-15 H2O 15 356980 Bbl 8588 US Well Services Inc STAGE 17

60 SHOTS

2013-05-13 H2O 15 8544 Bbl 360200 US Well Services Inc STAGE 11

60 SHOTS

2013-05-15 H2O 15 8204 Bbl 356440 US Well Services Inc STAGE 18

60 SHOTS

2013-05-13 H2O 15 8684 Bbl 355805 US Well Services Inc STAGE 13

60 SHOTS

2013-05-14 H2O 15 8614 Bbl 357095 US Well Services Inc STAGE 16

60 SHOTS

2013-05-15 H2O 15 8412 Bbl 358055 US Well Services Inc STAGE 19

60 SHOTS

2013-05-10 H2O 15 8545 Bbl 348300 US Well Services Inc STAGE 1

60 SHOTS

2013-05-13 H2O 15 8504 Bbl 356065 US Well Services Inc STAGE 12

60 SHOTS

2013-05-14 H2O 15 9445 Bbl 324450 US Well Services Inc STAGE 14

60 SHOTS

2013-05-14 H2O 15 8054 Bbl 347500 US Well Services Inc STAGE 15

60 SHOTS

2013-05-12 H2O 15 8723 Bbl 356335 US Well Services Inc STAGE 6

60 SHOTS

2013-05-13 H2O 15 8636 Bbl 358585 US Well Services Inc STAGE 9

60 SHOTS Carbon fiber plug set @ 11,500' 60 perforations total. Frac Gradient 1.10.

2013-05-13 H2O 15 8571 Bbl 359120 US Well Services Inc STAGE 10

60 SHOTS

2013-05-12 H2O 15 9174 Bbl 341775 US Well Services Inc STAGE 7

60 SHOTS

2013-05-15 H2O 15 8508 Bbl 356400 US Well Services Inc STAGE 20

60 SHOTS

2013-05-12 H2O 15 8665 Bbl 360880 US Well Services Inc STAGE 8

60 SHOTS

2013-05-11 H2O 15 8765 Bbl 360070 US Well Services Inc STAGE 4

60 SHOTS

2013-05-11 H2O 15 8645 Bbl 357295 US Well Services Inc STAGE 3

60 SHOTS

2013-05-12 H2O 15 9574 Bbl 283174 US Well Services Inc STAGE 5

60 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 ANTERO RESOURCES CORPORATION 1444621 169 138
2014 ANTERO RESOURCES CORPORATION 969671 1 358
2015 ANTERO RESOURCES CORPORATION 529786 121 361
2016 ANTERO RESOURCES CORPORATION 353730 38 363
2017 ANTERO RESOURCES CORPORATION 303793 59 365
2018 ANTERO RESOURCES CORPORATION 236645 83 365
2019 ANTERO RESOURCES CORPORATION 50329 38 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 ANTERO RESOURCES CORPORATION Brine 12621 138
2014 ANTERO RESOURCES CORPORATION Brine 15536 358
2015 ANTERO RESOURCES CORPORATION Brine 4255 361
2016 ANTERO RESOURCES CORPORATION Brine 3208 363
2017 ANTERO RESOURCES CORPORATION Brine 2132 365
2018 ANTERO RESOURCES CORPORATION Brine 1655 365
2019 ANTERO RESOURCES CORPORATION Brine 305 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1485212194 2019-1-29 0:00: PW No Violations 0.10
-1495067021 2013-3-16 0:00: AM No Violations
-1967824512 2013-4-22 0:00: AM No Violations
-2005035894 2013-4-4 0:00:0 DD No Violations
-256041210 2013-12-12 0:00 PW No Violations 1.00
-478070717 2013-3-28 0:00: DD No Violations
-86688573 2013-5-30 0:00: CT No Violations
0086688573 2013-05-30 Completion Testing No Violations Status check inspection on the drilling out of the completion plugs found the company rigging up to start their clean out run. I also discussed the placement of the Methanol on site and had the company move the stored material away from their line heaters.
0145677537 2014-07-30 Preliminary Restoration No Violations Status check inspection on the preliminary restoration found the well drilling and stimulation process is now complete and the well is in line and producing with 8- 400 barrel production tanks on site servicing all 6 wells on the drill pad now in production.
0256041210 2013-12-12 Production Wells No Violations The well is in production and on line, The company has completed 3 wells on the pad and is currently in the process of drilling 3 more.
0381279361 2018-03-07 Production Wells No Violations Status check inspection accompanied by ODNR Inspector Tom Thomas to document the well status. The well is equipped with a casing and tubing well head assembly with (2) manually operated valves on the tubing well head and one emergency shut down valve on the tubing tree production flow line. The well head casing flow line is also tied into the production flow line however the valves are in the closed position. The 13.375 and 9.625 casing well head assemblies have flowlines with valves and gauges installed to monitor annular pressure. No 13.375 casing well head pressure gauge is present and the 9.625 casing well head reads 1,500 pounds pressure. On pad total is (6) complete wells supported by (6) gas processing units. Also on location is a production fluid facility consisting of a total of (8) steel construction tanks with a capacity of 400 barrels of fluid each, the tanks are situated inside a polymer lined steel containment dike area. The well lease road entrance is gated and locked with signage posted at the entrance of the well pad and at each well head. The well pad has a stone surface along with the lease road. The well pad perimeter berm is of earthen material and in good repair.
0478070717 2013-03-28 Drill / Deepen / Reopen No Violations Inspector received phone notification and stopped by the drill site in regards to the completion of the current intermediate drilling stage total drilling depth being reached. A total depth of 2036 was reached using a 17.50 bit and the company is conditioning the bore hole preparing to run the 13.375 intermediate casing string. The casing tally was reviewed and received noting proper centralizer placement along with a casing shoe and float collar being ran.
0504757431 2018-03-07 Production Wells No Violations On this day, I accompanied ODNR Inspector William Stolarik. Please refer to his comments for a detailed report. The well is equipped with annular pressure monitoring devices. Concrete barriers surround the wellheads. The facility is gated with an electronic shutdown button on the right-hand side, prior to the pad. The front left of the pad is equipped with (8) 400 barrel steel tanks within containment and an electronic shutdown button. There are (6) gas processing units along the back of the pad, and a midstream facility behind the gas processing units.
0663806946 2013-04-01 Drill / Deepen / Reopen No Violations Inspection and notification documentation of the setting of the 13.375 casing string. Notification was received and inspector was in phone contact with the rig supervisor on 03/29/2013 with notice received of the running and setting of 2026 of 13.375 production casing, with cement returns to surface and all records received on 04/01/2013.
1256844914 2013-03-20 Drill / Deepen / Reopen No Violations Status check inspection found the drilling company finishing hooking up to the conductor pipe and getting ready to start drilling their surface hole.
1276299159 2013-03-26 Drill / Deepen / Reopen No Violations Inspection of the drilling process found the current depth of 1350 using a 17.5 bit and drilling on air. The company is currently running a borehole deviation survey.
1349898448 2020-5-22 0:00: PW No Violations 1.00
1363519559 2013-03-16 Administrative Inspection No Violations Inspector receive notification that the said well has been spudded on this day and the top hole rig is attempting to set the tin horn or cellar.
1364127046 2013-03-23 Drill / Deepen / Reopen No Violations Inspector on site to witness the running and cementing of the 18.625 surface casing, 378 of casing was set and cemented back to surface with 100% cement excess ran and 110 bbl of cement returns to surface, the casing was tested to 600 psi over lift pressure upon the landing of the cement plug.
1365426388 2013-04-08 Drill / Deepen / Reopen No Violations Status check inspection on the current drilling progress found the current drilling depth to be 6882 using a 12.250 drill bit. Total depth to e drilled for this stage is 7090.
1365725848 2013-04-11 Drill / Deepen / Reopen No Violations Status check inspection to witness the 2nd stage of the 9.625 casing cement job.
1366045645 2013-04-15 Drill / Deepen / Reopen No Violations Inspection and status check on the drilling progress found the current drilling depth to be 7520 using a 8.5 drill bit with the current bore hole position in the Horizontal curve section and drilling on oil base mud.
1366333323 2013-04-18 Drill / Deepen / Reopen No Violations Status check inspection @ 7:30 Am found the current drilling depth to be 11,608 using a 8.5 drill bit and oil based drilling fluid with the current bore hole position in the horizontal section. The projected well total bore hole depth is to be 13,542.
1366337907 2013-04-18 Drill / Deepen / Reopen No Violations I received a call from the rig superintendent at 11:15 Am requesting me to return to the drilling rig due to a flow line failure casing oil based drilling mud to be discharged under pressure across the South East side of the drill site impoundment. Upon arrival I photographed the site and did a perimeter check finding no drilling fluids had left the site. A remedial clean up procedure was discussed with the affected surface material already being cleaned up and placed into box containers and being hauled to a EPA approved landfill. There was damage to contractor vehicles by flying debris, the vehicles and a mud loggers trailer were also covered by oil based mud. All equipment to be cleaned will be done inside of a containment area and the site will have and surface water and oil base mud vacuumed up and the material hauled to an approved disposal facility for the remainder of the project.
1366752181 2013-04-23 Drill / Deepen / Reopen No Violations Inspection found the drilling rig currently broke down while in the process of running the 5.5 production casing. Review of the area affected by the oil based drilling fluid spill on 04/18/13 found the affected area cleaned up.
1366975743 2013-04-25 Drill / Deepen / Reopen No Violations Upon inspection it was found that the well bore drilling process has been completed and the drilling rig is rigging down and moving off location. Inspector will note that I had to call Neighbors Completion services and have a correct cement job log ticket emailed to me for the 5.5 production casing.
1368451957 2013-05-13 Completion Testing No Violations Status check inspection of the completion process found US Well Service currently stimulating the 9th stage to be completed.
1370526726 2013-06-06 Completion Testing No Violations Status check inspection of the completion process found the stimulation process and well bore clean out complete. The well is waiting the completion of the transportation gas line and then will be put in line.
1383150412 2013-10-30 Production Wells No Violations Inspection found the well capable of production and 8- 400 barrel production tanks located on site.
1386949410 2013-12-12 Production Wells No Violations Bill Stolarik and I stopped in at the location and inspected the site. Well is in production. Tanks, dike and identifications are in place.
145677537 2014-7-30 0:00: PL No Violations 0.50
1485212194 2019-01-29 Production Wells No Violations On this day, I found the pad gated with signage at the entrance. There are (6) producing wells, (6) gas processing units, (4) 400-barrel steel production tanks within steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 0 pounds per square inch (psi), and the 13.375 inch diameter surface casing does not have a gauge. The company will be contacted about having a gauge in place.
1495067021 2013-03-16 Administrative Inspection No Violations The company man on site notified me on Sunday @ 2:00 PM that the top hole rig contractors Ranson is not able to reach the 100 mark needed as per permit conditions on their conductor string due to being in solid bedrock and the rig not being able to drill the hard shale rock. I notified my supervisor and asked permission for them to set conductor @ 85; After discussion and permit review and the understanding that the next string to be set is the surface pipe @ 340 My supervisor Rocky and myself agreed that they could set the conductor at 85. Notification was sent to Steve Opritza in the Divisions permitting section on 03/18/13.
1512766814 2013-05-28 Completion Testing No Violations Status check inspection found the service co completed drilling out the bridge plugs and pulling out of the hole with the tubing work over drill string and preparing to run in the hole with the tubing production string to be set at 8723.
1967824512 2013-04-22 Administrative Inspection No Violations Notification was received from the company man on site in regards to the well bore total drilling depth of 13,552 being reached and the company getting ready to run the production casing.
2005035894 2013-04-04 Drill / Deepen / Reopen No Violations Status check inspection found the current drilling depth of 5052 and the rig pulling out of the hole with the drill string to pick up a tri cone drill bit due to the formation making fluid and the hammer bit not making acceptable progress.
381279361 2018-3-7 0:00:0 PW No Violations
504757431 2018-3-7 0:00:0 PW No Violations 0.20
663806946 2013-4-1 0:00:0 DD No Violations 2.00

For data sources see[10]

References