{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.81,"lon":-81.3,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Seneca Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-000538 | |
Farm/Lease Name: GARY UNIT | |
License Status: Producing | |
License Date: 2014-03-10 | |
Spud Date: 2013-06-15 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2014-02-24 | |
Well Total Depth: 16656.00 ft | |
Configuration: Horizontal | |
Latitude: 39.810000 | |
Longitude: -81.300000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-04-26 | Proposed Formations:POINT PLEASANT, Issued Date:4/26/2013, Expired Date:4/26/2015 12:00:00 PM, Drilling unit acres:452.533, Proposed Well Type:OG, Proposed Well Class:EDPW |
Correction to Well | 2013-08-16 | CHANGE IN PROPOSED TOTAL DEPTH. |
Correction to Well | 2014-02-14 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE INCREASED TO 645.286 ACRES. |
Reached Total Depth | 2014-02-24 | |
APP | 2014-03-10 | Proposed Formations:POINT PLEASANT, Issued Date:3/10/2014, Expired Date:3/9/2016 12:00:00 PM, Drilling unit acres:645.286, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2014-06-13 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2015-05-07 | |
Construction Permit Expires | 2016-03-09 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-05-07 | 8292 | 16458 | 0 |
8292 | 16458 | 0 | |
8292 | 16458 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 05/02/2014 | 05/16/2014 | 8208 | 11,686,800.0 | 76360 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Plexbreak 145 | Chemplex | Non-emulsifier | Cocamide Diethanolamine Salt | 68603-42-9 | 10 | 0.00008000 | 0 |
Ethylene Glycol Monobutyl Ether | 111-76-2 | 15 | 0.00012 | 0 | ||||
Diethanolamine | 111-42-2 | 5 | 0.00004000 | 0 | ||||
Methyl Alcohol | 67-56-1 | 15 | 0.00012 | 0 | ||||
Water | 732-18-5 | 66 | 0.00052 | 0 | ||||
Plexaid 673 | Chemplex | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 25 | 0.00393 | 0 | |
Water | 7732-18-5 | 85 | 0.01335 | 0 | ||||
Sodium Salt of Phosphonodimethylated Diamine | Proprietary | 5 | 0.00079 | 0 | ||||
Ferriplex 66 | Chemplex | Iron Control | Citric Acid | 77-92-9 | 30 | 0.00013 | 0 | |
Water | 7732-18-5 | 35 | 0.00016 | 0 | ||||
Acetic Acid | 64-19-7 | 50 | 0.00022 | 0 | ||||
40/70 White | US Silica | Propppant | Sand | 14808-60-7 | 100 | 4.9144 | 0 | |
Freshwater | Antero Resources | Water | Water | 7732-18-5 | 100 | 90.709 | 0 | |
Hydrochloric Acid 10-15% | Reagent | Acid | Hydrchloric Acid | 7647-01-0 | 15 | 0.03424 | 0 | |
Plexcide 15G | Chemplex | Biocide | Alkyl Dimethyl Benzyl Ammonium Chloride | 68424-85-1 | 3 | 0.00076 | 0 | |
Glutaraldehyde | 111-30-8 | 14 | 0.00355 | 0 | ||||
Didecyl Dimethyl Ammonium Chloride | 7173-51-5 | 3 | 0.00076 | 0 | ||||
Water | 7732-18-5 | 90 | 0.02285 | 0 | ||||
Ethanol | 64-17-5 | 3 | 0.00076 | 0 | ||||
Beta M-4.0 | PfP | Guar Gel | Petroleum Distillate | 64742-47-8 | 55 | 0.04677 | 0 | |
Surfactant | 154518-36-2 | 1 | 0.00085 | 0 | ||||
Clay | 1302-78-9 | 5 | 0.00425 | 0 | ||||
Guar Gum | 9000-30-0 | 50 | 0.04252 | 0 | ||||
Plexhib 256 | Chemplex | Corrosion | n-olefins | Proprietary | 10 | 0.00007000 | 0 | |
Alcohol Ethoxylate Surfactants | Proprietary | 30 | 0.00021 | 0 | ||||
Methyl Alcohol | 67-56-1 | 70 | 0.00049 | 0 | ||||
Propargyl Alcohol | 107-19-7 | 8 | 0.00006000 | 0 | ||||
thiourea-formaldehyde copolymer | 68527-49-1 | 30 | 0.00021 | 0 | ||||
20/40 White | US Silica | Propppant | Sand | 14808-60-7 | 100 | 2.9237 | 0 | |
100 Mesh | US Silica | Propppant | Sand | 14808-60-7 | 100 | 1.2677 | 0 | |
Plexslick 953 | Chemplex | Friction Reducer | Polyacrylamide-co-acrylic acid | 9003-06-9 | 32 | 0.01967 | 0 | |
Hydrotreated Petroleum Distillate | 64742-47-8 | 30 | 0.01844 | 0 | ||||
Water | 7732-18-5 | 35 | 0.02152 | 0 | ||||
Alcohol Ethoxylate Surfactants | Proprietary | 8 | 0.00492 | 0 | ||||
Sodium Persulfate | Chemplex | Breaker | Sodium Persulfate | 7775-27-1 | 100 | 0.00123 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-05-16 | H2O | 15 | 0 Gal | 238786 | Go Frac LLC | STAGE 47/47 |
2014-05-02 | H2O | 15 | 0 | 237595 | Go Frac LLC | STAGE 1/47
STAGES 2-46 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | ANTERO RESOURCES CORPORATION | 2077978 | 2442 | 182 |
2015 | ANTERO RESOURCES CORPORATION | 1620515 | 1391 | 365 |
2016 | ANTERO RESOURCES CORPORATION | 706052 | 209 | 363 |
2017 | ANTERO RESOURCES CORPORATION | 547470 | 165 | 365 |
2018 | ANTERO RESOURCES CORPORATION | 426775 | 150 | 365 |
2019 | ANTERO RESOURCES CORPORATION | 86225 | 66 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | ANTERO RESOURCES CORPORATION | Brine | 791 | 182 |
2015 | ANTERO RESOURCES CORPORATION | Brine | 12645 | 365 |
2016 | ANTERO RESOURCES CORPORATION | Brine | 6429 | 363 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 3805 | 365 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 3000 | 365 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 524 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1019705439 | 2014-2-21 0:00: | DD | No Violations | 2.00 |
-1290355557 | 2014-2-20 0:00: | DD | No Violations | 2.50 |
-1481759976 | 2013-12-13 0:00 | DD | No Violations | 1.00 |
-1630461767 | 2014-4-17 0:00: | PL | No Violations | 1.10 |
-1878666156 | 2014-1-13 0:00: | DD | No Violations | 0.60 |
-1993117978 | 2013-8-14 0:00: | PW | No Violations | |
-261401772 | 2014-2-14 0:00: | DD | No Violations | |
-71550009 | 2013-11-20 0:00 | DD | No Violations | 2.50 |
-782216571 | 2014-7-30 0:00: | PL | No Violations | 0.50 |
-96776965 | 2014-2-20 0:00: | DD | No Violations | 1.00 |
0063835264 | 2014-06-23 | Completion Testing | No Violations | Status check inspection of the completion process found Key Energys completion service rigging up on the well assembling the well control Blow out preventer stack and Cudd completion services tubing snubbing unit standing by to assemble their unit, proper containment is in place and the 500 barrel flow back tanks have proper grounding. |
0071550009 | 2013-11-20 | Drill / Deepen / Reopen | No Violations | On site electrical inspection with Brad Sellers the Divisions inter agency coordinator and a inspector with the Ohio Department of Commerce- electrical inspector, On the day of inspection deficiencies were found in the grounding system on the electrical service generator feeding the site trailers, We also discovered the internal grounding system inside the electrical panels servicing the site trailers were insufficiently wired according to the National Electric Code. Anteros people were on site and made the needed corrections accordingly. |
0096776965 | 2014-02-20 | Drill / Deepen / Reopen | No Violations | My inspection finds the rig, Patterson 342, is drilling 8.5 hole at a depth of 12370. I am accompanied by inspector L.J. Parkins. Due to an electrical storm we were unable to perform a full site inspection. |
0261401772 | 2014-02-14 | Drill / Deepen / Reopen | No Violations | Stopped by drill site to check for containment around dirty water tanks, all produced water is being stored within containment area. |
0606867988 | 2014-02-23 | Drill / Deepen / Reopen | No Violations | Status check inspection on the drilling progress found the current drilling depth to be 15,783 in the Horizontal well bore section using a 8.5 direction drilling assembly with a current mud weight of 13.2# and directional azimuth of 333.19 degrees with a total estimated drilling depth to be 16,824. The drilling supervisor and myself did walk the location and review the recent slip on the North East side of the location and observed the company has made efforts to deter the surface water from further infiltrating the area. |
0663299104 | 2018-03-07 | Production Wells | No Violations | On this day, I accompanied ODNR Inspector William Stolarik. Please refer to his comments for a detailed report. The well is equipped with annular pressure monitoring devices. Concrete barriers surround the wellheads. The facility is gated with an electronic shutdown button on the right-hand side, prior to the pad. The front left of the pad is equipped with (8) 400 barrel steel tanks within containment and an electronic shutdown button. There are (6) gas processing units along the back of the pad, and a midstream facility behind the gas processing units. |
0777045000 | 2014-01-15 | Casing String Witnessed | No Violations | Status check inspection found the 12.250 2nd intermediate borehole total drilling depth has been reached at 7041 the company was conditioning the borehole in preparation to run the 9.625 intermediate casing. |
0782216571 | 2014-07-30 | Preliminary Restoration | No Violations | Status check inspection on the preliminary restoration found the well drilling and stimulation process is now complete and the well is in line and producing with 8- 400 barrel production tanks on site servicing all 6 wells on the drill pad now in production. |
1019705439 | 2014-02-21 | Drill / Deepen / Reopen | No Violations | At 8:00 am I met Bill Stolarik, Conrad Baston, Tom Wince, Joe Honeycutt, and Josh Allred to discuss the slip that has developed. Conrad stated that the construction records from the site indicated that neither the rig nor any production equipment was jeopardized by the slip. Conrad agreed to submit to ODNR DOGRM a plan in writing as soon as it is finalized. The rig is currently drilling at a depth of 13459. |
1078769701 | 2018-03-07 | Production Wells | No Violations | Status check inspection accompanied by ODNR Inspector Tom Thomas to document the well status. The well is equipped with a casing and tubing well head assembly with (2) manually operated valves on the tubing well head and one emergency shut down valve on the tubing tree production flow line. The well head casing flow line is also tied into the production flow line however the valves are in the closed position. The 13.375 and 9.625 casing well head assemblies have flowlines with valves and gauges installed to monitor annular pressure. The 13.375 casing well head pressure gauge reads 700 pounds pressure and the 9.625 casing well head reads 700 pounds pressure. On pad total is (6) complete wells supported by (6) gas processing units. Also on location is a production fluid facility consisting of a total of (8) steel construction tanks with a capacity of 400 barrels of fluid each, the tanks are situated inside a polymer lined steel containment dike area. The well lease road entrance is gated and locked with signage posted at the entrance of the well pad and at each well head. The well pad has a stone surface along with the lease road. The well pad perimeter berm is of earthen material and in good repair. |
1259155127 | 2013-12-12 | Drill / Deepen / Reopen | No Violations | Wells have been spudded but not completed. Waiting on drill rig for drilling intermittent strings and lateral. |
1290355557 | 2014-02-20 | Drill / Deepen / Reopen | Violations Noted | On the day of my inspection I witnessed that Patterson UTI Drilling Rig #342 was drilling an 8.5 inch diameter lateral hole at a depth of 12313 feet on 13.1# oil based drilling mud with an estimated td of 16824 feet. Site inspection accompanied by Company Man revealed a slip on the northeast corner of drill pad. Core samples have been taken and are awaiting results for a plan of action to address. I requested that Antero expedite a plan to address the slip as thaw has begun and the slip will only worsen. At the time of inspection simultaneous operation was taking place with the drilling and 2 wells producing. Repairs were being made to the drilling unit primary containment. Noble County Inspector Eric Conrad made call to Antero Construction Engineer and he stated that a plan would be emailed to Eric tonight. Monroe County Inspector Bill Stolarik will meet with them tomorrow. |
1371592464 | 2013-06-16 | Casing String Witnessed | No Violations | On this day I witnessed the setting of 85 of 26 conductor casing with 30 barrels of cement returns to surface, the 100 minimum per permit requirements could not be reached due to the initial site excavation removing 80 of cover down to solid bedrock. Division Deputy Chief Dave Claus was made aware of this issue on 06/14/13 by Dave Ball on 3411124374. |
1385157101 | 2013-11-22 | Casing String Witnessed | No Violations | Inspector on site to witness the cementing of the 18.625 surface casing, 413 of pipe was set inside of a 435 24 diameter bore hole and cemented with 849 sacks of class A 2% calcium 1/4# flake cement with 63 barrels of good cement returns witnessed to surface and the casing pressure tested to 500 psi over lift pressure upon the landing of the cement plug. |
1385797853 | 2013-11-26 | Casing String Witnessed | No Violations | on site inspection to witness the cementing of 2,054 of 13.375 casing, Allied Cement services cemented the casing back to surface with good cement returns and lift pressure with the casing pressure tested to 500# over lift pressure upon the landing of the cement plug. All records received. |
1392734875 | 2014-02-18 | Drill / Deepen / Reopen | No Violations | My inspection today finds the drilling rig, Patterson 342, is drilling 8.5 hole at a depth of 9707. Upon inspection of the containment I reminded the company representative to closely monitor it as the snow melts. A substantial slip has developed on the east side of the pad. The company drilling representative stated that soil sampling was done and a plan developed to stabilize the slip. |
1393002274 | 2014-02-20 | Administrative Inspection | No Violations | I called Daniel Smith with Antero and asked him about the slip. Mr. Smith stated that Antero engineers were formulating a plan to stabilize the slip. I received a call from Conrad Baston, Antero Civil Engineering General Manager, at 3:42pm. He agreed to meet onsite and discuss the slip. |
1393065583 | 2014-02-21 | Surface Facility Construction | No Violations | On the day of my inspection I was accompanied by Inspector Eric Conrad and Anteros environmental construction personnel with the inspection and meeting purpose of reviewing a slip that has occurred on the North East corner of the drill site pad, On this day the company has presented a remedial plan of action to repair the slip along with a temporary plan of action to stabilize the area by the means of diverting the surface water infiltrating the area, protective boundaries will be established for safety reasons. Completed engineered drawings will be submitted immediately upon completion to the Division, The affected area was photographed and my direct supervisor Rocky King notified and sent pictures of the situation. |
1393263877 | 2014-02-24 | Drill / Deepen / Reopen | No Violations | Status check inspection of the drilling progress found the production borehole total depth to be drilled has been reached at 16,656, the company is encountering formation gas pressure at 500 units and is attempting to bring the 13.7# mud weight up to properly control the gas pressure before pulling out of the hole with the drill string. Inspection of the recent slip area found the slip has not progressed since my last inspection. |
1393506060 | 2014-02-27 | Administrative Inspection | No Violations | On this day following up on NOV-1290355557, I contacted Monroe County Inspector Bill Stolarik and he and Noble County Inspector Eric Conrad have met with Antero Resources Corp. Construction Engineer and a plan has been submitted to address slip. Temporary berms are in place to redirect surface water from impacting slip. |
1395871686 | 2014-03-26 | Preliminary Restoration | No Violations | Compliance follow-up inspection found the company has beginning the slip repair by the means of bringing in an auger rig to set 21 45 pilings to be cemented in place and a wall erected between the pilings. |
1399556908 | 2014-05-08 | Completion Testing | No Violations | Status check inspection on the stimulation process found Gofrac services on location preparing to stimulate stage # 22 with a solid completion plug set at 12,811 and perforations from 12,797 to 12,650 with 1000 gallons of 15% HCL acid used. |
1481759976 | 2013-12-13 | Drill / Deepen / Reopen | No Violations | On site inspection to document the status of the drilling process, The well bore has been drilled to the point of the 1st intermediate casing string and the larger rig is slated to move in soon. |
1492639396 | 2014-04-09 | Preliminary Restoration | No Violations | Status check inspection on the slip repair process found the retaining wall being installed is complete and the company is removing the instable material from below the wall that is locates in the slip, the company is hauling in larger rock to place below to replace the unstable soil that has slipped, photographs were taken of the repair process. |
1548777803 | 2019-01-29 | Production Wells | No Violations | On this day, I found the pad gated with signage at the entrance. There are (6) producing wells, (6) gas processing units, (4) 400-barrel steel production tanks within steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 700 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 700 psi. |
1630461767 | 2014-04-17 | Preliminary Restoration | No Violations | Compliance notice follow up inspection found the earthen slip mentioned in the initial violation has been repaired accordingly, the preliminary restoration addressing the drill site as a hole will be approved upon the completion of all well activity on the drilling pad. |
1878666156 | 2014-01-13 | Drill / Deepen / Reopen | No Violations | Status check inspection on the drilling progress found the current drilling depth to be 4,100 in the 12.250 2nd intermediate well bore section, the company is drilling on air. |
1993117978 | 2013-08-14 | Production Wells | No Violations | The well is in the production testing stages and is being flow tested. The tubing pressure is 5000 psi. I asked the company man on site to place proper well identification on each well head. |
2048193753 | 2013-06-12 | Drill / Deepen / Reopen | No Violations | Notification was received that the said well is to be spudded and the conductor set on this day. I inspected the site and reviewed the permit conditions with the drilling superintendent for Express Energy who is the drilling contractor. I shall Gps the well once the conductor is set. |
2143071725 | 2014-04-01 | Preliminary Restoration | No Violations | Status check inspection on the remedial work over slip repair on the North East side of the location, 90% of the pilings have been installed and cemented in place with a minimum of 20 set into bedrock, the company shall then install a barrier supportive wall between the pilings finishing the project by then installing perferated drains and catch basins before backfilling. |
252227879 | 2020-5-22 0:00: | PW | No Violations | 1.00 |
606867988 | 2014-2-23 0:00: | DD | No Violations | 2.00 |
63835264 | 2014-6-23 0:00: | CT | No Violations | 1.40 |
663299104 | 2018-3-7 0:00:0 | PW | No Violations | 0.20 |
777045000 | 2014-1-15 0:00: | CS | No Violations | 0.80 |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1290355557 | US-OH-108203 | 2016-07-26 | NONEC | Failure to post permit |
1290355557 | US-OH-108204 | 2015-01-08 | Failure to restore land surface witin area disturbed in sighting |
For data sources see[10]