Well Details

Well ID: 34-111-24375
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Seneca Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-000538
Farm/Lease Name: GARY UNIT
License Status: Producing
License Date: 2014-03-10
Spud Date: 2013-06-15
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2014-02-24
Well Total Depth: 16656.00 ft
Configuration: Horizontal
Latitude: 39.810000
Longitude: -81.300000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-04-26 Proposed Formations:POINT PLEASANT, Issued Date:4/26/2013, Expired Date:4/26/2015 12:00:00 PM, Drilling unit acres:452.533, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2013-08-16 CHANGE IN PROPOSED TOTAL DEPTH.
Correction to Well 2014-02-14 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE INCREASED TO 645.286 ACRES.
Reached Total Depth 2014-02-24
APP 2014-03-10 Proposed Formations:POINT PLEASANT, Issued Date:3/10/2014, Expired Date:3/9/2016 12:00:00 PM, Drilling unit acres:645.286, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2014-06-13 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2015-05-07
Construction Permit Expires 2016-03-09
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-05-07 8292 16458 0
8292 16458 0
8292 16458 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/02/2014 05/16/2014 8208 11,686,800.0 76360

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Plexbreak 145 Chemplex Non-emulsifier Cocamide Diethanolamine Salt 68603-42-9 10 0.00008000 0
Ethylene Glycol Monobutyl Ether 111-76-2 15 0.00012 0
Diethanolamine 111-42-2 5 0.00004000 0
Methyl Alcohol 67-56-1 15 0.00012 0
Water 732-18-5 66 0.00052 0
Plexaid 673 Chemplex Scale Inhibitor Methyl Alcohol 67-56-1 25 0.00393 0
Water 7732-18-5 85 0.01335 0
Sodium Salt of Phosphonodimethylated Diamine Proprietary 5 0.00079 0
Ferriplex 66 Chemplex Iron Control Citric Acid 77-92-9 30 0.00013 0
Water 7732-18-5 35 0.00016 0
Acetic Acid 64-19-7 50 0.00022 0
40/70 White US Silica Propppant Sand 14808-60-7 100 4.9144 0
Freshwater Antero Resources Water Water 7732-18-5 100 90.709 0
Hydrochloric Acid 10-15% Reagent Acid Hydrchloric Acid 7647-01-0 15 0.03424 0
Plexcide 15G Chemplex Biocide Alkyl Dimethyl Benzyl Ammonium Chloride 68424-85-1 3 0.00076 0
Glutaraldehyde 111-30-8 14 0.00355 0
Didecyl Dimethyl Ammonium Chloride 7173-51-5 3 0.00076 0
Water 7732-18-5 90 0.02285 0
Ethanol 64-17-5 3 0.00076 0
Beta M-4.0 PfP Guar Gel Petroleum Distillate 64742-47-8 55 0.04677 0
Surfactant 154518-36-2 1 0.00085 0
Clay 1302-78-9 5 0.00425 0
Guar Gum 9000-30-0 50 0.04252 0
Plexhib 256 Chemplex Corrosion n-olefins Proprietary 10 0.00007000 0
Alcohol Ethoxylate Surfactants Proprietary 30 0.00021 0
Methyl Alcohol 67-56-1 70 0.00049 0
Propargyl Alcohol 107-19-7 8 0.00006000 0
thiourea-formaldehyde copolymer 68527-49-1 30 0.00021 0
20/40 White US Silica Propppant Sand 14808-60-7 100 2.9237 0
100 Mesh US Silica Propppant Sand 14808-60-7 100 1.2677 0
Plexslick 953 Chemplex Friction Reducer Polyacrylamide-co-acrylic acid 9003-06-9 32 0.01967 0
Hydrotreated Petroleum Distillate 64742-47-8 30 0.01844 0
Water 7732-18-5 35 0.02152 0
Alcohol Ethoxylate Surfactants Proprietary 8 0.00492 0
Sodium Persulfate Chemplex Breaker Sodium Persulfate 7775-27-1 100 0.00123 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-05-16 H2O 15 0 Gal 238786 Go Frac LLC STAGE 47/47
2014-05-02 H2O 15 0 237595 Go Frac LLC STAGE 1/47

STAGES 2-46 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 ANTERO RESOURCES CORPORATION 2077978 2442 182
2015 ANTERO RESOURCES CORPORATION 1620515 1391 365
2016 ANTERO RESOURCES CORPORATION 706052 209 363
2017 ANTERO RESOURCES CORPORATION 547470 165 365
2018 ANTERO RESOURCES CORPORATION 426775 150 365
2019 ANTERO RESOURCES CORPORATION 86225 66 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 ANTERO RESOURCES CORPORATION Brine 791 182
2015 ANTERO RESOURCES CORPORATION Brine 12645 365
2016 ANTERO RESOURCES CORPORATION Brine 6429 363
2017 ANTERO RESOURCES CORPORATION Brine 3805 365
2018 ANTERO RESOURCES CORPORATION Brine 3000 365
2019 ANTERO RESOURCES CORPORATION Brine 524 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1019705439 2014-2-21 0:00: DD No Violations 2.00
-1290355557 2014-2-20 0:00: DD No Violations 2.50
-1481759976 2013-12-13 0:00 DD No Violations 1.00
-1630461767 2014-4-17 0:00: PL No Violations 1.10
-1878666156 2014-1-13 0:00: DD No Violations 0.60
-1993117978 2013-8-14 0:00: PW No Violations
-261401772 2014-2-14 0:00: DD No Violations
-71550009 2013-11-20 0:00 DD No Violations 2.50
-782216571 2014-7-30 0:00: PL No Violations 0.50
-96776965 2014-2-20 0:00: DD No Violations 1.00
0063835264 2014-06-23 Completion Testing No Violations Status check inspection of the completion process found Key Energys completion service rigging up on the well assembling the well control Blow out preventer stack and Cudd completion services tubing snubbing unit standing by to assemble their unit, proper containment is in place and the 500 barrel flow back tanks have proper grounding.
0071550009 2013-11-20 Drill / Deepen / Reopen No Violations On site electrical inspection with Brad Sellers the Divisions inter agency coordinator and a inspector with the Ohio Department of Commerce- electrical inspector, On the day of inspection deficiencies were found in the grounding system on the electrical service generator feeding the site trailers, We also discovered the internal grounding system inside the electrical panels servicing the site trailers were insufficiently wired according to the National Electric Code. Anteros people were on site and made the needed corrections accordingly.
0096776965 2014-02-20 Drill / Deepen / Reopen No Violations My inspection finds the rig, Patterson 342, is drilling 8.5 hole at a depth of 12370. I am accompanied by inspector L.J. Parkins. Due to an electrical storm we were unable to perform a full site inspection.
0261401772 2014-02-14 Drill / Deepen / Reopen No Violations Stopped by drill site to check for containment around dirty water tanks, all produced water is being stored within containment area.
0606867988 2014-02-23 Drill / Deepen / Reopen No Violations Status check inspection on the drilling progress found the current drilling depth to be 15,783 in the Horizontal well bore section using a 8.5 direction drilling assembly with a current mud weight of 13.2# and directional azimuth of 333.19 degrees with a total estimated drilling depth to be 16,824. The drilling supervisor and myself did walk the location and review the recent slip on the North East side of the location and observed the company has made efforts to deter the surface water from further infiltrating the area.
0663299104 2018-03-07 Production Wells No Violations On this day, I accompanied ODNR Inspector William Stolarik. Please refer to his comments for a detailed report. The well is equipped with annular pressure monitoring devices. Concrete barriers surround the wellheads. The facility is gated with an electronic shutdown button on the right-hand side, prior to the pad. The front left of the pad is equipped with (8) 400 barrel steel tanks within containment and an electronic shutdown button. There are (6) gas processing units along the back of the pad, and a midstream facility behind the gas processing units.
0777045000 2014-01-15 Casing String Witnessed No Violations Status check inspection found the 12.250 2nd intermediate borehole total drilling depth has been reached at 7041 the company was conditioning the borehole in preparation to run the 9.625 intermediate casing.
0782216571 2014-07-30 Preliminary Restoration No Violations Status check inspection on the preliminary restoration found the well drilling and stimulation process is now complete and the well is in line and producing with 8- 400 barrel production tanks on site servicing all 6 wells on the drill pad now in production.
1019705439 2014-02-21 Drill / Deepen / Reopen No Violations At 8:00 am I met Bill Stolarik, Conrad Baston, Tom Wince, Joe Honeycutt, and Josh Allred to discuss the slip that has developed. Conrad stated that the construction records from the site indicated that neither the rig nor any production equipment was jeopardized by the slip. Conrad agreed to submit to ODNR DOGRM a plan in writing as soon as it is finalized. The rig is currently drilling at a depth of 13459.
1078769701 2018-03-07 Production Wells No Violations Status check inspection accompanied by ODNR Inspector Tom Thomas to document the well status. The well is equipped with a casing and tubing well head assembly with (2) manually operated valves on the tubing well head and one emergency shut down valve on the tubing tree production flow line. The well head casing flow line is also tied into the production flow line however the valves are in the closed position. The 13.375 and 9.625 casing well head assemblies have flowlines with valves and gauges installed to monitor annular pressure. The 13.375 casing well head pressure gauge reads 700 pounds pressure and the 9.625 casing well head reads 700 pounds pressure. On pad total is (6) complete wells supported by (6) gas processing units. Also on location is a production fluid facility consisting of a total of (8) steel construction tanks with a capacity of 400 barrels of fluid each, the tanks are situated inside a polymer lined steel containment dike area. The well lease road entrance is gated and locked with signage posted at the entrance of the well pad and at each well head. The well pad has a stone surface along with the lease road. The well pad perimeter berm is of earthen material and in good repair.
1259155127 2013-12-12 Drill / Deepen / Reopen No Violations Wells have been spudded but not completed. Waiting on drill rig for drilling intermittent strings and lateral.
1290355557 2014-02-20 Drill / Deepen / Reopen Violations Noted On the day of my inspection I witnessed that Patterson UTI Drilling Rig #342 was drilling an 8.5 inch diameter lateral hole at a depth of 12313 feet on 13.1# oil based drilling mud with an estimated td of 16824 feet. Site inspection accompanied by Company Man revealed a slip on the northeast corner of drill pad. Core samples have been taken and are awaiting results for a plan of action to address. I requested that Antero expedite a plan to address the slip as thaw has begun and the slip will only worsen. At the time of inspection simultaneous operation was taking place with the drilling and 2 wells producing. Repairs were being made to the drilling unit primary containment. Noble County Inspector Eric Conrad made call to Antero Construction Engineer and he stated that a plan would be emailed to Eric tonight. Monroe County Inspector Bill Stolarik will meet with them tomorrow.
1371592464 2013-06-16 Casing String Witnessed No Violations On this day I witnessed the setting of 85 of 26 conductor casing with 30 barrels of cement returns to surface, the 100 minimum per permit requirements could not be reached due to the initial site excavation removing 80 of cover down to solid bedrock. Division Deputy Chief Dave Claus was made aware of this issue on 06/14/13 by Dave Ball on 3411124374.
1385157101 2013-11-22 Casing String Witnessed No Violations Inspector on site to witness the cementing of the 18.625 surface casing, 413 of pipe was set inside of a 435 24 diameter bore hole and cemented with 849 sacks of class A 2% calcium 1/4# flake cement with 63 barrels of good cement returns witnessed to surface and the casing pressure tested to 500 psi over lift pressure upon the landing of the cement plug.
1385797853 2013-11-26 Casing String Witnessed No Violations on site inspection to witness the cementing of 2,054 of 13.375 casing, Allied Cement services cemented the casing back to surface with good cement returns and lift pressure with the casing pressure tested to 500# over lift pressure upon the landing of the cement plug. All records received.
1392734875 2014-02-18 Drill / Deepen / Reopen No Violations My inspection today finds the drilling rig, Patterson 342, is drilling 8.5 hole at a depth of 9707. Upon inspection of the containment I reminded the company representative to closely monitor it as the snow melts. A substantial slip has developed on the east side of the pad. The company drilling representative stated that soil sampling was done and a plan developed to stabilize the slip.
1393002274 2014-02-20 Administrative Inspection No Violations I called Daniel Smith with Antero and asked him about the slip. Mr. Smith stated that Antero engineers were formulating a plan to stabilize the slip. I received a call from Conrad Baston, Antero Civil Engineering General Manager, at 3:42pm. He agreed to meet onsite and discuss the slip.
1393065583 2014-02-21 Surface Facility Construction No Violations On the day of my inspection I was accompanied by Inspector Eric Conrad and Anteros environmental construction personnel with the inspection and meeting purpose of reviewing a slip that has occurred on the North East corner of the drill site pad, On this day the company has presented a remedial plan of action to repair the slip along with a temporary plan of action to stabilize the area by the means of diverting the surface water infiltrating the area, protective boundaries will be established for safety reasons. Completed engineered drawings will be submitted immediately upon completion to the Division, The affected area was photographed and my direct supervisor Rocky King notified and sent pictures of the situation.
1393263877 2014-02-24 Drill / Deepen / Reopen No Violations Status check inspection of the drilling progress found the production borehole total depth to be drilled has been reached at 16,656, the company is encountering formation gas pressure at 500 units and is attempting to bring the 13.7# mud weight up to properly control the gas pressure before pulling out of the hole with the drill string. Inspection of the recent slip area found the slip has not progressed since my last inspection.
1393506060 2014-02-27 Administrative Inspection No Violations On this day following up on NOV-1290355557, I contacted Monroe County Inspector Bill Stolarik and he and Noble County Inspector Eric Conrad have met with Antero Resources Corp. Construction Engineer and a plan has been submitted to address slip. Temporary berms are in place to redirect surface water from impacting slip.
1395871686 2014-03-26 Preliminary Restoration No Violations Compliance follow-up inspection found the company has beginning the slip repair by the means of bringing in an auger rig to set 21 45 pilings to be cemented in place and a wall erected between the pilings.
1399556908 2014-05-08 Completion Testing No Violations Status check inspection on the stimulation process found Gofrac services on location preparing to stimulate stage # 22 with a solid completion plug set at 12,811 and perforations from 12,797 to 12,650 with 1000 gallons of 15% HCL acid used.
1481759976 2013-12-13 Drill / Deepen / Reopen No Violations On site inspection to document the status of the drilling process, The well bore has been drilled to the point of the 1st intermediate casing string and the larger rig is slated to move in soon.
1492639396 2014-04-09 Preliminary Restoration No Violations Status check inspection on the slip repair process found the retaining wall being installed is complete and the company is removing the instable material from below the wall that is locates in the slip, the company is hauling in larger rock to place below to replace the unstable soil that has slipped, photographs were taken of the repair process.
1548777803 2019-01-29 Production Wells No Violations On this day, I found the pad gated with signage at the entrance. There are (6) producing wells, (6) gas processing units, (4) 400-barrel steel production tanks within steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 700 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 700 psi.
1630461767 2014-04-17 Preliminary Restoration No Violations Compliance notice follow up inspection found the earthen slip mentioned in the initial violation has been repaired accordingly, the preliminary restoration addressing the drill site as a hole will be approved upon the completion of all well activity on the drilling pad.
1878666156 2014-01-13 Drill / Deepen / Reopen No Violations Status check inspection on the drilling progress found the current drilling depth to be 4,100 in the 12.250 2nd intermediate well bore section, the company is drilling on air.
1993117978 2013-08-14 Production Wells No Violations The well is in the production testing stages and is being flow tested. The tubing pressure is 5000 psi. I asked the company man on site to place proper well identification on each well head.
2048193753 2013-06-12 Drill / Deepen / Reopen No Violations Notification was received that the said well is to be spudded and the conductor set on this day. I inspected the site and reviewed the permit conditions with the drilling superintendent for Express Energy who is the drilling contractor. I shall Gps the well once the conductor is set.
2143071725 2014-04-01 Preliminary Restoration No Violations Status check inspection on the remedial work over slip repair on the North East side of the location, 90% of the pilings have been installed and cemented in place with a minimum of 20 set into bedrock, the company shall then install a barrier supportive wall between the pilings finishing the project by then installing perferated drains and catch basins before backfilling.
252227879 2020-5-22 0:00: PW No Violations 1.00
606867988 2014-2-23 0:00: DD No Violations 2.00
63835264 2014-6-23 0:00: CT No Violations 1.40
663299104 2018-3-7 0:00:0 PW No Violations 0.20
777045000 2014-1-15 0:00: CS No Violations 0.80

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1290355557 US-OH-108203 2016-07-26 NONEC Failure to post permit
1290355557 US-OH-108204 2015-01-08 Failure to restore land surface witin area disturbed in sighting

For data sources see[10]

References