If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24389 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.64,"lon":-80.92,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Lee Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-000803 | |
Farm/Lease Name: STALDER UNIT C | |
License Status: Producing | |
License Date: 2014-04-23 | |
Spud Date: 2014-04-22 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2014-09-26 | |
Well Total Depth: 17198.00 ft | |
Configuration: Horizontal | |
Latitude: 39.640000 | |
Longitude: -80.920000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-05-21 | Proposed Formations:CLINTON THRU TRENTON, Issued Date:5/21/2013, Expired Date:5/21/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
Correction to Well | 2013-05-24 | CORRECTION TO FOOTAGE (SURFACE). |
APP | 2014-04-23 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:4/23/2014, Expired Date:4/22/2016 12:00:00 PM, Drilling unit acres:672.4, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2014-09-26 | |
Completion Report Received | 2015-05-26 | |
Construction Permit Expires | 2016-04-22 | |
Change of Owner | 2017-12-22 | Operator changed from 8610, TRIAD HUNTER LLC to 8844, ECLIPSE RESOURCES I LP |
Record Last Modified | 2017-12-22 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-06-08 | 16855 | 11481 | 0 |
16855 | 11481 | 0 | |
16855 | 11481 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 12/01/2014 | 12/01/2014 | 10701 | 10,461,900.0 | 106000 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | LP-65 | Halliburton | Scale Inhibitor | Ammonium chloride | 12125-02-9 | 10 | 0.0024006 | 2400 |
100 MESH WHITE | Halliburton | Proppant | Crystalline silica, quartz | 14808-60-7 | 100 | 0.519935 | 519801 | |
LGC-36 UC | Halliburton | Liquid Gel Concentrate | Guar gum | 9000-30-0 | 60 | 0.0164083 | 16405 | |
Naphtha, hydrotreated heavy | 64742-48-9 | 60 | 0.0164083 | 16405 | ||||
FR-66 | Halliburton | Friction Reducer | Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0466769 | 46665 | |
WG-36 GELLING AGENT | Halliburton | Gelling Agent | Guar gum | 9000-30-0 | 100 | 0.0478724 | 47860 | |
Other Ingredient(s) | Bentonite, benzyl(hydrogenated
tallow alkyl) dimethylammonium stearate complex |
121888-68-4 | 0 | 0.00239362 | 2393 | |||
Formaldehyde | 50-00-0 | 0 | 0.00024006 | 240 | ||||
Sodium sulfate | 7757-82-6 | 0 | 0.00000136 | 2 | ||||
Silica gel | 112926-00-8 | 0 | 0.000478724 | 479 | ||||
Fatty acid tall oil amide | Confidential | 0 | 0.00777949 | 7778 | ||||
Surfactant mixture | Confidential | 0 | 0.000478724 | 479 | ||||
Propylene glycol | 57-55-6 | 0 | 0.0169668 | 16963 | ||||
Organic phosphonate | Confidential | 0 | 0.0144036 | 14400 | ||||
Crystalline silica, quartz | 14808-60-7 | 0 | 0.00007522 | 76 | ||||
Aluminum Silicate | 1302-76-7 | 0 | 5.85072 | 5,849,200.0 | ||||
Sorbitan monooleate polyoxyethylene derivative | 9005-65-6 | 0 | 0.0015559 | 1556 | ||||
Sodium chloride | 7647-14-5 | 0 | 0.00778449 | 7783 | ||||
Sorbitan, mono-9-octadecenoate, (Z) | 1338-43-8 | 0 | 0.0015559 | 1556 | ||||
Water | 7732-18-5 | 0 | 1.08498 | 1,084,700.0 | ||||
Fatty alcohol polyglycol ether surfactant | 9043-30-5 | 0 | 0.000273472 | 274 | ||||
Ammonium chloride | 12125-02-9 | 0 | 0.00777949 | 7778 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 0 | 0.00777949 | 7778 | ||||
Polyacrylamide copolymer | Confidential | 0 | 0.0466769 | 46665 | ||||
Strontium chloride | 10476-85-4 | 0 | 0.00000500 | 6 | ||||
Potassium chloride | 7447-40-7 | 0 | 0.00000500 | 6 | ||||
Quaternary ammonium compounds,
bis(hydrogenated tallow alkyl) dimethyl,salts with bentonite |
68953-58-2 | 0 | 0.00136736 | 1368 | ||||
SP BREAKER | Halliburton | Breaker | Sodium persulfate | 7775-27-1 | 100 | 0.00135635 | 1356 | |
30/50, 20/40 CERAMIC PROP | Halliburton | Proppant | Silica, amorphous - fumed | 7631-86-9 | 30 | 1.75522 | 1,754,760.0 | |
Mullite | 1302-93-8 | 100 | 5.85072 | 5,849,200.0 | ||||
Crystalline silica, cristobalite | 14464-46-1 | 30 | 1.75522 | 1,754,760.0 | ||||
Fresh Water | Operator | Base Fluid | Fresh Water | 7732-18-5 | 100 | 87.1698 | 87,147,100.0 | |
OptiKleen- | Halliburton | Concentrate | Sodium perborate tetrahydrate | 10486-00-7 | 100 | 0.00189949 | 1899 | |
CALCIUM CHLORIDE | Halliburton | Brine | Calcium chloride | 10043-52-4 | 96 | 0.00009603 | 96 | |
30/50 WHITE | Halliburton | Proppant | Crystalline silica, quartz | 14808-60-7 | 100 | 5.22416 | 5,222,800.0 | |
BE-9W | Halliburton | Biocide | Tributyl tetradecyl phosphonium chloride | 81741-28-8 | 10 | 0.0028278 | 2828 | |
HYDROCHLORIC ACID 10-30% | Halliburton | Solvent | Hydrochloric acid | 7647-01-0 | 30 | 0.284683 | 284610 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-11-20 | H2O | 0 | 9397 Bbl | 291745 | Halliburton | STAGE 1/25
STAGES 2-24 SEE IMAGES |
2014-12-02 | H2O | 0 | 10223 Bbl | 366887 | Halliburton | STAGE 25/25 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | TRIAD HUNTER LLC | 2454635 | 0 | 281 |
2016 | TRIAD HUNTER LLC | 948426 | 0 | 367 |
2017 | ECLIPSE RESOURCES I LP | 453573 | 0 | 365 |
2018 | ECLIPSE RESOURCES I LP | 311234 | 0 | 353 |
2019 | ECLIPSE RESOURCES I LP | 66379 | 0 | 86 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | TRIAD HUNTER LLC | Brine | 40169 | 281 |
2016 | TRIAD HUNTER LLC | Brine | 13128 | 367 |
2017 | TRIAD HUNTER LLC | Brine | 7960 | 334 |
2018 | ECLIPSE RESOURCES I LP | Brine | 4155 | 353 |
2019 | ECLIPSE RESOURCES I LP | Brine | 870 | 86 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1042607624 | 2019-3-12 0:00: | PW | No Violations | 1.00 |
-1313773414 | 2015-5-26 0:00: | CT | No Violations | 0.70 |
-1836896581 | 2014-4-23 0:00: | DD | No Violations | 5.50 |
-2050393381 | 2020-5-29 0:00: | PW | No Violations | 0.30 |
0115584436 | 2016-02-16 | Preliminary Restoration | No Violations | Status check inspection found the well head equipped with (2) 5.185 master control primary gate valves assembled on the B-section well head along with (2) tubing head master valves and a primary control hydraulic emergency shut down in line vale on the tubing head stack located between the 2 tubing manual valves. There is a sand trap separator hooked into the production outlet flow line near the well head supported by a 100 barrel production tank located on location near the well head. The well does have production tubing in it and the well is currently in production with a total of 10- 400 barrel production tanks located on a production pad adjacent to the well pad with 7 gas processing units along with a gas compressor also located on the adjacent production pad. The well was turned over to the companys production department on and after 12/17/2015. Addressing the preliminary restoration- upon inspection of the well pad it was observed that the primary perimeter boundary affected by the well pad construction is secure and has no stability or erosion issues with vegetation established on the well ad perimeter. The well pad itself has earthen material that was stockpiled after a well control incident during December of 2014, According to Sam Miracle with Triads Engineering Department the material is slated to be addressed once the weather breaks this spring. There is also a large portable polymer lined water tank on the well pad location that is being emptied of all fluids currently and is to be disassembled and removed from the locating in the future. |
1042607624 | 2019-03-12 | Production Wells | No Violations | Status check inspection found the well equipped with a lower A and upper B section with 2 diameter riser pipes attached to the service ports on the A&B sections. The riser pipes are equipped with valves and gauges for the purpose of annular pressure monitoring. The A section pressure gauge reads 150 pounds and the B section pressure reads 250 pounds. The 5.5 production casing well head section flow cross is equipped with a gauge that reads 1,700 pounds pressure. The well head is equipped with a production tree and lubricator head with 1,400 pounds pressure on the production tree. The well is flowing through a sand trap separator. The production facility is situated on a separate production pad and consists of (10) 500 barrel capacity tanks along with 5 gas processing units. On site on this day were company representatives Neil Ingram, George Winland and Ryan Lori. |
115584436 | 2016-2-16 0:00: | PL | No Violations | 1.20 |
1201390161 | 2017-12-07 | Preliminary Restoration | No Violations | Preliminary restoration status check inspection found the area affected by the well pad construction perimeter boundary to be stable with vegetation established. There is a 2nd pad site that us used as a production pad that the lease road to the pad runs through that also has the perimeter established with vegetation, on the second pad is the tank farm that consists of a total of 10 steel design 500 barrel fluid capacity steel tanks situated inside a polymer lined steel containment area. There is also a large gas compressor and 5 gas processing units on the second pad site. Addressing the primary pad site there are 5 wells completed on the pad with all 5 wells found to be in operation on the pad. Proper well identification is posted on each well and at the tank farm battery site. The lease road is of stone construction. Bruce Carpenter with Eclipse Resources recently contacted me and indicated that Eclipse has taken over ownership of the wells and equipment. |
1313773414 | 2015-05-26 | Completion Testing | No Violations | Status check inspection on the well flow back completion process found Fesco Well Control Company on site conducting well flow back post stimulation operations. Conversation with the Flow Back Engineer with Fesco indicated to the fact that today would be the final day for flow back and the company would be released and breaking down their equipment in order for Triad to begin normal production operations. On site with me today was ODNR Engineer Tech Andy Thomas who agreed the Preliminary Restoration could not be considered completed until the company removed the 2 large piles of soil placed on location during the well control event during the month of 12/2014. |
1403595391 | 2014-06-24 | Casing String Witnessed | No Violations | On 06/24/2014 Warren Drilling rig 12 is now on the hole and has drilled a 24 diameter surface borehole to a depth of 530 and ran 504 of 20 casing with Halliburton cement services cementing the casing to surface using 620 sacks of Halcem cement with 40 % calculated open hole excess and 37 barrels of cement returns to surface. |
1405558486 | 2014-07-16 | Casing String Witnessed | No Violations | Status check inspection on the running of the 9.625 2nd intermediate casing string set at a depth of 9,607 with Halliburton cement crew on location rigging up to cement the casing. |
1411408444 | 2014-09-22 | Drill / Deepen / Reopen | No Violations | Status check inspection on the drilling process found Patterson drilling on the hole drilling the 8.5 production borehole in the curve section at a depth of 10,122 using 11.7# drilling mud, a formation integrity breakdown test was administered indicating the formation would withstand 19# mud weight. |
1800723426 | 2014-07-09 | Drill / Deepen / Reopen | No Violations | Status check inspection on the drilling process found Warren Drilling rig 12 on the hole drilling the 12.250 2nd intermediate well bore at a depth of 6,250, the company is drilling on air and misting with KCL. |
1836896581 | 2014-04-23 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that Express Energy Services had drilled a 32 inch diameter hole to the depth of 100 feet and ran 100 feet of 26 inch conductor pipe. Express Energy Services cemented conductor pipe with 250 sacks of Class A cement with 2% CaCl and .5 #/sack of floseal. Had good returns of 5bbls and cement stayed to surface. |
427501320 | 2019-8-1 0:00:0 | PW | No Violations | 0.30 |
For data sources see[10]