X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24410

Well Details

Well ID: 34-111-24410
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Bethel Township
Operator Name: HALL DRILLING LLC (OIL & GAS)
Well Pad ID: US-OH-000840
Farm/Lease Name: HERCHER NORTH
License Status: Final Restoration
License Date: 2013-08-19
Spud Date: 2013-03-07
Spud Drilling Contractor: ZIEGENFUSS DRILLING
Final Drill Date: 2013-08-06
Well Total Depth: 300.00 ft
Configuration: Vertical
Latitude: 39.670000
Longitude: -81.240000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-07-09 Proposed Formations:TRENTON-BLACK RIVER, Issued Date:7/9/2013, Expired Date:7/9/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Plugged/Abandoned 2013-08-06 LOST HOLE WHILE DRILLING SURFACE. WILL PLUG TO SKID AND RE-
Reached Total Depth 2013-08-06 LOST HOLE WHILE DRILLING SURFACE. WILL PLUG TO SKID AND RE-
APP 2013-08-19 Proposed Formations:TRENTON-BLACK RIVER, Issued Date:8/19/2013, Expired Date:8/19/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Completion Report Received 2013-09-18 LOST HOLE WHILE DRILLING SURFACE. WILL PLUG TO SKID AND RE-
Construction Permit Expires 2015-08-19 LOST HOLE WHILE DRILLING SURFACE. WILL PLUG TO SKID AND RE-
Record Last Modified 2018-06-08 LOST HOLE WHILE DRILLING SURFACE. WILL PLUG TO SKID AND RE-

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1513522404 2015-6-18 0:00: FR No Violations 0.20
1375837762 2013-08-06 Plug / Plug Back No Violations Notification was received on this day at 7:00AM from Mike Hall that during the drilling of the surface borehole the 23 hammer bit cutting head was lost @ 300 and the well was to be plugged immediately. The well bore was filled to surface with 4 loads of redi-mix concrete with all casing recovered. Notification was made to the Division and a new well was spudded.
1513522404 2015-06-18 Final Restoration No Violations Final inspection passed on this day, the well was located on the Hercher shale pad.

For data sources see[3]

References