Well Details

Well ID: 34-111-24416
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Salem Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-000800
Farm/Lease Name: SHROYER UNIT
License Status: Producing
License Date: 2013-09-13
Spud Date: 2013-09-13
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2014-03-12
Well Total Depth: 19502.00 ft
Configuration: Horizontal
Latitude: 39.790000
Longitude: -80.870000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-08-20 Proposed Formations:TRENTON, Issued Date:8/20/2013, Expired Date:8/20/2015 12:00:00 PM, Drilling unit acres:512.33, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2013-09-13 Proposed Formations:POINT PLEASANT, Issued Date:9/13/2013, Expired Date:9/13/2015 12:00:00 PM, Drilling unit acres:511.85, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2014-03-12
Correction to Well 2015-05-22 CORRECTION TO UNIT SIZE, TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Construction Permit Expires 2015-09-13
Completion Report Received 2016-03-22
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-07-28 11288 19235 0
11288 19235 0
11288 19235 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 06/29/2014 07/09/2014 10500 10,377,200.0 0
2 06/18/2014 06/26/2014 10500 12,589,400.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 BXL 10C Producers Service Corp Crosslinker Ethylene Glycol 107-21-1 40 0.0117746 11792.6
Sodium Hydroxide 1310-73-2 5 0.00147182 1474.07
Glycerine 56-81-5 5 0.00147182 1474.07
Potassium Tetraborate 1332-77-0 40 0.0117746 11792.6
PRO-DRB-LT Producers Service Corp Breaker Crystalline Silica in form of Quartz 14808-60-7 15 0.00513522 5143.06
Ammonium Persulfate 7727-54-0 80 0.0273878 27429.7
AS 9811 Producers Service Corp Friction Reducer Petroleum Distillate 064742-47-8 24 0.0196295 19659.5
GSW-HT Producers Service Corp Gel Stabilizer Triethanolamine 102-71-6 60 0.00337457 3379.72
Diethanolamine 111-42-2 1 0.00005624 56.329
PROHIB II Producers Service Corp Inhibitor Methanol 67-56-1 30 0.000320059 320.548
Dimethylcocoamine, bis(chloroethyl)ether,

diquaternary ammonium salt

68607-28-3 60 0.000640118 641.096
Propargyl Alcohol 107-19-7 30 0.000320059 320.548
Ethylene Glycol 107-21-1 40 0.000426745 427.398
Glycol Ethers 111-76-2 40 0.000426745 427.398
Ethoxylated Nonylphenol 68412-54-4 10 0.000106686 106.849
PRO BREAKER 4 Producers Service Corp Breaker Sucrose 57-50-1 46 0.000184724 185.006
Ethylene Glycol 107-21-1 14 0.00005622 56.306
AS 9220 Producers Service Corp Scale Inhibitor Organic Phosphate 71050-62-9 25 0.00557974 5588.27
Water Company 1 Carrier/Base Fluid Water 7732-18-5 100 86.4651 86,597,300.0
MB 7530 Producers Service Corp Biocide Tetrahydro-3, 5-dimethyl-2H-1,3,5-thiadiazine-2-thione 533-74-4 24 0.00655216 6562.17
Sodium Hydroxide 1310-73-2 4 0.00109203 1093.7
Hydrochloric Acid (15%) Producers Service Corp Acidizing Hydrochloric Acid 7647-01-0 15 0.171578 171840
PRO GEL 4.0L Producers Service Corp Gelling Agent Ethylene Glycol 107-21-1 14 0.0240246 24061.3
light distillate treated oil 000-00-0 60 0.102962 103120
Guar Gum 9000-30-0 60 0.102962 103120
suspension aids 000-00-0 10 0.0171604 17186.6
Sand (Proppant) Producers Service Corp Proppant Silica Substrate NA 100 12.0172 12,035,600.0
2 PROHIB II Producers Service Corp Inhibitor Dimethylcocoamine, bis(chloroethyl)ether,

diquaternary ammonium salt

68607-28-3 60 0.000518385 626.526
Ethylene Glycol 107-21-1 40 0.00034559 417.684
Glycol Ethers 111-76-2 40 0.00034559 417.684
Methanol 67-56-1 30 0.000259193 313.263
Ethoxylated Nonylphenol 68412-54-4 10 0.00008640 104.421
Propargyl Alcohol 107-19-7 30 0.000259193 313.263
AS 9811 Producers Service Corp Friction Reducer Petroleum Distillate 064742-47-8 24 0.0236238 28551.9
BXL 10C Producers Service Corp Crosslinker Ethylene Glycol 107-21-1 40 0.00490456 5927.7
Sodium Hydroxide 1310-73-2 5 0.00061307 740.963
Glycerine 56-81-5 5 0.00061307 740.963
Potassium Tetraborate 1332-77-0 40 0.00490456 5927.7
PRO-DRB-LT Producers Service Corp Breaker Crystalline Silica in form of Quartz 14808-60-7 15 0.00130285 1574.64
Ammonium Persulfate 7727-54-0 80 0.00694854 8398.07
BIO CLEAR 2000 Producers Service Corp Biocide Polyethylene Glycol 25322-68-3 70 0.00003217 38.875
2,2-dibromo-3-nitriloproplonamide 10222-01-2 40 0.00001838 22.214
GSW-HT Producers Service Corp Gel Stabilizer Diethanolamine 111-42-2 1 0.00006473 78.229
Triethanolamine 102-71-6 60 0.0038836 4693.76
PRO GEL 4.0L Producers Service Corp Gelling Agent suspension aids 000-00-0 10 0.0125966 15224.4
Ethylene Glycol 107-21-1 14 0.0176352 21314.1
light distillate treated oil 000-00-0 60 0.0755794 91346.1
Guar Gum 9000-30-0 60 0.0755794 91346.1
Hydrochloric Acid (15%) Producers Service Corp Acidizing Hydrochloric Acid 7647-01-0 15 0.138949 167935
Water Company 1 Carrier/Base Fluid Water 7732-18-5 100 86.9252 105,059,000.0
MB 7530 Producers Service Corp Biocide Sodium Hydroxide 1310-73-2 4 0.000958085 1157.95
Tetrahydro-3, 5-dimethyl-2H-1,3,5-thiadiazine-2-thione 533-74-4 24 0.00574851 6947.71
Sand (Proppant) Producers Service Corp Proppant Silica Substrate NA 100 11.849 14,320,800.0
PRO BREAKER 4 Producers Service Corp Breaker Sucrose 57-50-1 46 0.000237314 286.82
Ethylene Glycol 107-21-1 14 0.00007223 87.293
PRO LOK Producers Service Corp Iron Control Methanol 67-56-1 60 0.000182282 220.308
AS 9220 Producers Service Corp Scale Inhibitor Organic Phosphate 71050-62-9 25 0.00550564 6654.18

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 0 0
H2O 0 0 0
2014-06-22 H2O 0 9748 Bbl 521000 Producers Service Corporation STAGE 10
2014-06-24 H2O 0 9961 Bbl 539400 Producers Service Corporation STAGE 16
2014-06-28 H2O 0 9684 Bbl 540400 Producers Service Corporation STAGE 27
2014-06-21 H2O 0 10657 Bbl 539800 Producers Service Corporation STAGE 9
2014-06-21 H2O 0 99010 Bbl 541300 Producers Service Corporation STAGE 7
2014-06-26 H2O 0 9968 Bbl 542700 Producers Service Corporation STAGE 20
H2O 0 0 0
2014-06-27 H2O 0 10416 Bbl 544800 Producers Service Corporation STAGE 22
2014-06-19 H2O 0 11609 Bbl 539900 Producers Service Corporation STAGE 3
2014-06-18 H2O 0 10302 Gal 222600 Producers Service Corporation STAGE 1
2013-06-23 H2O 0 12787 Bbl 539100 Producers Service Corporation STAGE 14
2014-06-20 H2O 0 10984 Bbl 539500 Producers Service Corporation STAGE 6
2014-06-28 H2O 0 11674 Bbl 540000 Producers Service Corporation STAGE 25
2014-06-21 H2O 0 10058 Bbl 5537 Producers Service Corporation STAGE 8
H2O 0 0 0
2014-06-25 H2O 0 10431 Bbl 543000 Producers Service Corporation STAGE 19
2014-06-25 H2O 0 9906 Bbl 541600 Producers Service Corporation STAGE 18
2014-06-22 H2O 0 9319 Bbl 541800 Producers Service Corporation STAGE 12
2014-06-24 H2O 0 11789 Bbl 339700 Producers Service Corporation STAGE 15
2014-06-29 H2O 0 9698 Bbl 540700 Producers Service Corporation STAGE 29
2014-06-19 H2O 0 10419 Gal 543000 Producers Service Corporation STAGE 4
2014-06-23 H2O 0 9104 Bbl 484100 Producers Service Corporation STAGE 13
2014-06-27 H2O 0 10211 Bbl 540000 Producers Service Corporation STAGE 24
H2O 0 0 0
2014-06-27 H2O 0 9854 Bbl 539900 Producers Service Corporation STAGE 23
2014-06-20 H2O 0 9100 Bbl 298700 Producers Service Corporation STAGE 5
2014-06-18 H2O 0 10419 Bbl 543000 Producers Service Corporation STAGE 4
2014-06-25 H2O 0 10300 Bbl 539500 Producers Service Corporation STAGE 17
2014-06-28 H2O 0 9397 Bbl 541800 Producers Service Corporation STAGE 26
2014-06-26 H2O 0 9686 Bbl 542300 Producers Service Corporation STAGE 21
2014-06-22 H2O 0 8643 Bbl 538900 Producers Service Corporation STAGE 11
2014-06-28 H2O 0 10043 Bbl 539300 Producers Service Corporation STAGE 28

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 ECLIPSE RESOURCES I LP 2813608 0 141
2015 ECLIPSE RESOURCES I LP 2641584 0 362
2016 ECLIPSE RESOURCES I LP 1200452 0 360
2017 ECLIPSE RESOURCES I LP 899893 0 288
2018 ECLIPSE RESOURCES I LP 273657 0 230
2019 ECLIPSE RESOURCES I LP 87321 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 ECLIPSE RESOURCES I LP Brine 30561 141
2015 ECLIPSE RESOURCES I LP Brine 15323 362
2016 ECLIPSE RESOURCES I LP Brine 7944 360
2017 ECLIPSE RESOURCES I LP Brine 44459 288
2018 ECLIPSE RESOURCES I LP Brine 11698 230
2019 ECLIPSE RESOURCES I LP Brine 2788 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1312341837 2018-8-28 0:00: PL No Violations 0.50
-1377124667 2016-1-19 0:00: PW No Violations
-1501754750 2020-4-17 0:00: PW No Violations 0.30
-1816733971 2013-11-18 0:00 DD No Violations 1.30
-677427383 2013-11-6 0:00: DD No Violations 0.80
-835622750 2013-9-13 0:00: DD No Violations 1.00
0191627329 2014-02-20 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Nomac Drilling Rig #359 had skidded from the 34111244230000 Shroyer Unit 4H and was preparing to trip in the hole with an 12.25 inch diameter bit and drill out the 13.375 inch float shoe at 2392 feet continuing down to approximately 8900 feet and running 9.625 inch 2nd intermediate string of casing.
0511425115 2015-02-10 Preliminary Restoration No Violations Status check inspection on the Preliminary Restoration found the well in production with 2.875 tubing set in the well bore and proper well identification posted on the well head. There is 3 -400 barrel capacity production fluid storage tanks on location along with a 100 barrel tank, all located in a metal dike area with a plastic type containment dike. There is 2 gas processing units along with 2 mechanical separators located on the far East side of the well pad to support both wells on the pad now producing. Proper well identification is posted at both the well head and tank battery. The Preliminary Restoration was passed on this day. No violations noted.
0677427383 2013-11-06 Drill / Deepen / Reopen No Violations Status check inspection found the drilling company Alpha Hunter Drilling rig # 9 has drilled into the top of the coal mine void at 757while drilling their mine string. They have pulled out of the hole with the drill string and are going back in with recovery tools to try and recover iron that is in the hole left from the underground mining operation.
0757108480 2014-03-11 Drill / Deepen / Reopen No Violations On the day of my inspection accompanied by ODNR Inspector Randy Akins, I witnessed that Nomac Drilling Rig #359 was drilling their lateral with an 8.5 inch diameter at 16155 feet with a projected td of 19047 feet. Site Inspection revealed no violations.
0835622750 2013-09-13 Drill / Deepen / Reopen No Violations The said well was spudded on this day and 102 of 30 conductor was set in a 36 borehole.
0928235562 2014-06-24 Completion Testing No Violations On the day of my inspection I witnessed that Producers Service Company was on site and stage sixteen of twenty nine total stages was in progress. Average treating pressure at the time of inspection was 9373psi, 40/70 mesh sand @1.5# and average rate 65bpm. Completed walk around with Unconventional Completions Foreman Alex Pottmeyer revealing no violations.
1312341837 2018-08-28 Preliminary Restoration No Violations Preliminary Restoration found the area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. The well pad and lease road are of stone surface construction and in good repair. 4 total well are now present on the well pad. The said well is equipped with a lower A and upper B section well head assembly with 2 diameter riser pipes attached to each well head section, the riser pipes are equipped with valves and gauges to monitor annular pressure. The A section gauge which monitors the pressure between the 13.375 and 9.625 diameter casing string reads zero pounds pressure. The B section gauge which reads the pressure between the 5.5 and 9.625 diameter casing string reads 600 pounds pressure. The 5.5 internal casing pressure is 800 pounds and the flow line pressure downstream of the well head choke is 353 pounds. The tubing head pressure is 392 pounds pressure. On the left rear side of the well pad is the production fluid facility consisting of (3) steel construction 400 barrel capacity tanks along with a single 100 barrel tank, all situated inside a polymer lined steel containment dike area. There is a 3rd party midstream pipeline point and compressor on a separate pad at the rear of the location.
1377124667 2016-01-19 Production Wells No Violations Status check inspection to document the well head working pressures. On this day it was observed that the production tubing head had a pressure of 1,098 psi with the 5.5 showing 1,387 psi at surface internally- the annular of the 5.5 showed 1387psi and the annular of the 9.625 showed 13 psi. The production tubing sales line showed 1,068 psi. The annular 5.5 casing monitoring poind does have a 1 line ran into the production sales line to releive annular pressure.
1383403310 2013-11-02 Casing String Witnessed No Violations On 11/02/13- 420 of 24 surface was set and cemented to surface with 100% cement excess ran and cement returns 85 barrels before total displacement. Alpha Hunter rig # 9 will drill and set the surface, mine string and 1st intermediate.
1384264967 2013-11-12 Drill / Deepen / Reopen No Violations Status check inspection found the current drilling depth to be 1871 using a 17.5 drill bit.
1394722496 2014-03-13 Drill / Deepen / Reopen No Violations Status check inspection of the drilling process found the current drilling depth to be 18,730 using a 8.5 diameter drill bit with a projected total depth of 19,047 and true vertical depth of 10,799 and azimuth of 154.77 degrees and inclination 88.98 degrees.
1398890089 2014-04-30 Drill / Deepen / Reopen No Violations Notification was received today from Kyle Bradford with Eclipse Resources regarding the recent bond log ran on 04/26/2014 on the 5.5 production casing to verify the cement top on the annular side of the casing, the bond log showed an estimated cement top in the horizontal section at 11,000 and the tail of the 13 pound per gallon 1.58 yield at 15,800 with a total of 18,717 of 5.5 production casing ran leaving 2,917 of total coverage in the horizon section, notification was made to my supervisors and a meeting will be set up once all documentation is in place.
1402524209 2014-06-11 Completion Testing No Violations On this day, I observed several companies on site rigging up to begin the stimulation process on the 2 known wells on location. I contacted Kyle Bradford with Eclipse and he indicated they planned on stimulating the well. I informed Kyle that on 04/30/14 I had made notice to him that the production casing cement job had inadaquate coverage and befort they (Eclipse) proceeded on with the completion process we would need to review the Bond Logs and completion records to ensure they had proper zonal cement coverage. At that point I contacted my supervisor Rocky king who notified Kyle Bradford that they were not to proceed with the stimulation process until the Division reviewed and approved their completion records and formation cement coverage as required in ORC 1501:9-1-08 Well Construction rules.
1403128165 2014-06-18 Completion Testing No Violations On the day of my inspection I witnessed that Producers Service Company was on site and fracing had commenced on the said well with stage two out of twenty nine in progress. I met with Company Man Billy Wells and discussed frac and stages. Average treating pressure at the time of inspection was 10240psi, 1/4 # sand and average rate 57bpm. Due to time restraints was unable to witness complete stage. Site inspection revealed that all equipment was in containment.
1816733971 2013-11-18 Drill / Deepen / Reopen No Violations Alpha Hunter drilling rig 9 has completed drilling and setting the 13.375 1st intermediate casing string to a depth of 2420 with 2392 of casing being set and cemented. Nomac Drilling rig 359 shall take over and complete the well bore drilling process.
191627329 2014-2-20 0:00: DD No Violations 4.00
511425115 2015-2-10 0:00: PL No Violations 2.00
757108480 2014-3-11 0:00: DD No Violations 2.50
928235562 2014-6-24 0:00: CT No Violations

For data sources see[10]