Well Details

Well ID: 34-111-24423
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Seneca Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-000811
Farm/Lease Name: DK CARPENTER UNIT
License Status: Producing
License Date: 2014-06-09
Spud Date: 2013-10-31
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2014-03-07
Well Total Depth: 18279.00 ft
Configuration: Horizontal
Latitude: 39.820000
Longitude: -81.280000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-10-11 Proposed Formations:POINT PLEASANT, Issued Date:10/11/2013, Expired Date:10/11/2015 12:00:00 PM, Drilling unit acres:548.573, Proposed Well Type:OG, Proposed Well Class:EDPW
APP 2014-02-26 Proposed Formations:POINT PLEASANT, Issued Date:2/26/2014, Expired Date:2/26/2016 12:00:00 PM, Drilling unit acres:453.775, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2014-03-07 Borehole survey recv'd 5/7/14
APP 2014-06-09 Proposed Formations:POINT PLEASANT, Issued Date:6/9/2014, Expired Date:6/8/2016 12:00:00 PM, Drilling unit acres:453.775, Proposed Well Type:OG, Proposed Well Class:EOUT
Correction to Well 2014-12-05 CHANGE IN SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED.
Completion Report Received 2015-02-12 Borehole survey recv'd 5/7/14
Construction Permit Expires 2016-06-08 Borehole survey recv'd 5/7/14
Record Last Modified 2017-10-23 Borehole survey recv'd 5/7/14

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-02-13 8471 18209 0
8471 18209 0
8471 18209 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 07/22/2014 08/13/2014 8268 14,397,200.0 644168

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 WFRA-405 U.S. Well Services, LLC Friction Reducer Petroleum Distillates 64742-47-8 22 0.02687 35655.1
Water 7732-18-5 40 0.03338 44292.1
Ethoxylated alcohol blend Proprietary 5 0.00417 5536.51
Crystalline Salt 12125-02-9 5 0.00417 5536.51
Anionic Polyacrylamide Proprietary 0 0.03338 44292.1
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 8.8583 11,753,000.0
LGC-15 U.S. Well Services, LLC Gelling Agents Surfactant 68439-51-0 3 0.00337 4467.09
Suspending agent (solid) 14808-60-7 3 0.00858 11386.7
Guar Gum 9000-30-0 50 0.05611 74451.5
Petroleum Distillates 64742-47-8 60 0.05314 70510
K-BAC 1020 U.S. Well Services, LLC Anti-Bacterial Agent 2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.00432 5727.66
Deionized Water 7732-18-5 28 0.00247 3271.62
AP One U.S. Well Services, LLC Gel Breakers Ammonium Persulfate 7727-54-0 100 0.00179 2381
HCL Acid (12.6%-18.0%) U.S. Well Services, LLC Bulk Acid Hydrogen Chloride 7647-01-0 18 0.07691 102046
Water 7732-18-5 87.5 0.32199 427206
SI-1000 U.S. Well Services, LLC Scale Inhibitor Water 7732-18-5 30 0.00301 4000.06
Anionic Copolymer Proprietary 0 0.004 5306.58
Ethylene Glycol 107-21-1 20 0.00362 4796.72
AI-300 U.S. Well Services, LLC Acid Corrosion Inhibitors Cinnamaldehyde 104-55-2 5 0.00011 151.343
Triethyl Phosphate 78-40-0 3 0.00002000 24.2969
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 13 0.00011 149.294
Isopropyl Alcohol 67-63-0 3 0.00001000 19.2961
Ethoxylated Nonylphenol 68412-54-4 5 0.00003000 40.4949
2-Butoxyethanol 111-76-2 7 0.0001 131.877
N,N-Dimethylformamide 68-12-2 15 0.00013 172.518
Water 7732-18-5 20 0.00004000 51.2285
Ethylene Glycol 107-21-1 31 0.00042 558.146
Water Antero Resources Base Fluid Water 7732-18-5 100 90.4994 120,073,000.0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-07-22 H2O 15 6297 Bbl 219980 US Well Services Inc STAGE 1/56

60 SHOTS STAGE 2-55 SEE IMAGES

2014-08-13 H2O 15 5767 Bbl 230100 US Well Services Inc STAGE 56/56

60 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 ANTERO RESOURCES CORPORATION 903954 148 66
2015 ANTERO RESOURCES CORPORATION 3239683 1662 365
2016 ANTERO RESOURCES CORPORATION 1239790 227 363
2017 ANTERO RESOURCES CORPORATION 751047 145 365
2018 ANTERO RESOURCES CORPORATION 521258 183 365
2019 ANTERO RESOURCES CORPORATION 103136 78 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 ANTERO RESOURCES CORPORATION Brine 20403 66
2015 ANTERO RESOURCES CORPORATION Brine 31506 365
2016 ANTERO RESOURCES CORPORATION Brine 16598 363
2017 ANTERO RESOURCES CORPORATION Brine 7534 365
2018 ANTERO RESOURCES CORPORATION Brine 4264 365
2019 ANTERO RESOURCES CORPORATION Brine 13 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1183201448 2018-3-7 0:00:0 PW No Violations
-1691078132 2013-11-1 0:00: DD No Violations 1.20
-20939214 2014-2-26 0:00: DD No Violations 1.20
-2093953653 2020-5-21 0:00: PL No Violations 1.00
-431415917 2013-12-21 0:00 DD No Violations
-581364483 2013-12-26 0:00 CS No Violations 9.00
-665188714 2014-1-6 0:00:0 DD No Violations
0020939214 2014-02-26 Drill / Deepen / Reopen No Violations Status check inspection on the drilling progress found the current drilling depth to be 12,561 in the 8.5 diameter production borehole with a current azimuth of 332.86 degrees and inclination of 90.52 degrees and a projected total well bore depth to be drilled of 18,370, the current oil based drilling mud weight is 13.7#.
0352134533 2014-02-23 Drill / Deepen / Reopen No Violations Status check inspection on the drilling progress found the current drilling depth to be 8,710 with the current borehole position in the horizontal position with a current azimuth of 334 degrees and drilling mud weight of 13.2#.
0431415917 2013-12-21 Drill / Deepen / Reopen No Violations Status check inspection on the drilling progress found the drilling company running in the hole with the drill string preparing to drill out from under the 18.625 surface casing.
0581364483 2013-12-26 Casing String Witnessed No Violations On 12/24/13 I was notified that the rig crew had set the 13.375 intermediate casing down on bottom and the pipe was stuck at the shoe. On 12/2613 the 13.375 was perforated with 2 -3 hollow steel carrier guns with 18 shots in each gun, perforations were at 2181 to 2184 & 2190 to 2193, circulation was then established and the casing cemented by Allied Cement services, during the cementing the cement head on the truck failed at 294 barrels of product mixed, and the cement plug was then immediately dropped and pumped to 2161 and the well shut in no gel or cement returns to surface, the well was bond logged the next day showing a cement top at 50 from surface.
0665188714 2014-01-06 Drill / Deepen / Reopen No Violations Status check inspection found the current well bore 12.250 2nd intermediate drilling section to be complete with a total depth of 7,399 drilled. The company is preparing to begin running the 9.625 casing.
0890428127 2013-12-23 Drill / Deepen / Reopen No Violations Status check inspection found the current 17.5 well bore section has been completed to a depth of 2252 and the company is currently running a borehole deviation survey. The 13.375 proposed casing tally was received.
1074761551 2019-02-07 Production Wells No Violations On this day, I found the pad gated with signage at the entrance. There are (8) producing wells, (8) gas processing units, (4) 400-barrel steel production tanks within polymer-lined steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 0 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 0 psi. It will be noted that in 2018 a slip had occurred along the southern slope of the pad and western slope of the lease road, prior to the pad. The slopes have since been graded, seeded, and erosion control in place. Currently awaiting new vegetation.
1183201448 2018-03-07 Production Wells No Violations Status check inspection found the well is equipped with a casing and tubing well head assembly with (2) manually operated valves on the tubing well head and one emergency shut down valve on the tubing tree production flow line. The well head casing flow line is also tied into the production flow line however the valves are in the closed position. The 13.375 and 9.625 casing well head assemblies have flowlines with valves and gauges installed to monitor annular pressure. The 13.375 casing well head pressure gauge reads 0 pounds pressure and the 9.625 casing well head reads 1,400 pounds pressure. On pad total is (8) complete wells supported by (8) gas processing units. Also on location is a production fluid facility consisting of a total of (8) steel construction tanks with a capacity of 400 barrels of fluid each, the tanks are situated inside a polymer lined steel containment dike area. The well lease road entrance is gated and locked with signage posted at the entrance of the well pad and at each well head. The well pad has a stone surface along with the lease road. The well pad perimeter berm is of earthen material and in good repair.
1211263296 2014-02-20 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Patterson UTI Drilling Rig #332 had skidded from the 34111244240000 DK Carpenter 1H and was nippling up and preparing to trip in the hole with an 8.5 inch diameter bit to drill out the 9.625 inch float shoe at 7360 feet and begin drilling their curve. Met with Company Man Rick Mortimer and discussed 5.5 inch production casing cement job on the 1H and findings on walk around site inspection.
1387627630 2013-12-21 Casing String Witnessed No Violations On 12/19/13, Patterson Drilling rig 332 is now on the hole and 361 of 18.625 surface casing was set and cemented to surface by Allied cement services using 768 sks of Class A 2% calcium .25# flow seal cement with 40 barrels of cement returns to surface and the casing pressure tested to 800 psi upon the landing of the plug.
1388098360 2013-12-26 Drill / Deepen / Reopen No Violations The 13.375 pipe was landed hard resulting in the pipe getting stuck in the bottom of the hole. The back side was loaded with KCL water and some clay stay- additives. The inside will be loaded and then perforated at a depth of 2195-2178. The cement company has pre-loaded a blend with .25lb per sack of cello flake in the blend. The second gun was chose to be ran due to a total of 290 barrels of cement slurry will be ran in the cement job.
1388705338 2014-01-02 Drill / Deepen / Reopen No Violations Status check inspection on the current drilling progress found the current drilling depth to be 6460 using a 12.250 hammer bit and misting with water picked up in the borehole at 5033, the projected total depth for the current well bore segment is 7,399.
1394028857 2014-03-05 Casing String Witnessed No Violations Status check inspection on the drilling progress found Patterson Drilling rig 332 has completed the well drilling process with a total depth drilled of 18,279 with a 8.5 diameter borehole with the company currently running the production casing.
1691078132 2013-11-01 Drill / Deepen / Reopen No Violations The said well was spudded on 10/30/2013 with 100 of 26 conductor being set and cemented to surface.
1717787029 2014-02-19 Drill / Deepen / Reopen No Violations Status check inspection found Patterson Drilling rig 332 rigging up on the 9.625 casing with 3rd party contractors on site completing the 21 day blow out preventer test with all test records recorded.
352134533 2014-2-23 0:00: DD No Violations 1.20
890428127 2013-12-23 0:00 DD No Violations 1.20

For data sources see[10]

References