If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24424 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.82,"lon":-81.28,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Seneca Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-000811 | |
Farm/Lease Name: DK CARPENTER UNIT | |
License Status: Producing | |
License Date: 2014-06-11 | |
Spud Date: 2013-11-01 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2014-02-12 | |
Well Total Depth: 19402.00 ft | |
Configuration: Horizontal | |
Latitude: 39.820000 | |
Longitude: -81.280000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-10-11 | Proposed Formations:POITN PLEASANT, Issued Date:10/11/2013, Expired Date:10/11/2015 12:00:00 PM, Drilling unit acres:548.573, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2014-02-12 | |
APP | 2014-02-26 | Proposed Formations:POINT PLEASANT, Issued Date:2/26/2014, Expired Date:2/26/2016 12:00:00 PM, Drilling unit acres:453.775, Proposed Well Type:OG, Proposed Well Class:EOUT |
APP | 2014-06-11 | Proposed Formations:POINT PLEASANT, Issued Date:6/11/2014, Expired Date:6/10/2016 12:00:00 PM, Drilling unit acres:453.775, Proposed Well Type:OG, Proposed Well Class:EOUT |
Correction to Well | 2014-12-05 | CHANGE IN SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED. |
Completion Report Received | 2015-02-19 | |
Construction Permit Expires | 2016-06-10 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-02-13 | 8882 | 19253 | 0 |
8882 | 19253 | 0 | |
8882 | 19253 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 10/29/2014 | 11/10/2014 | 8391 | 11,504,800.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | GW-3 | Baker Hughes | Gelling Agent | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.012708 | 13685 |
FRW-18 | Baker Hughes | Friction Reducer | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0829103 | 89284 | |
CI-14 | Baker Hughes | Corrosion Inhibitor | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0006665 | 717.75 | |
Alpha 1427 | Baker Hughes | Biocide | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0091248 | 9826.25 | |
Scaletrol 720 | Baker Hughes | Scale Inhibitor | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.015092 | 16252.2 | |
HCl, 10.1 - 15% | Baker Hughes | Acidizing | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.420047 | 452338 | |
Sand, White, 20/40 | Baker Hughes | Proppant | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 4.27375 | 4,602,300.0 | |
Enzyme G-NE | Baker Hughes | Breaker | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0154851 | 16675.6 | |
Water | Operator | Carrier | Water | 7732-18-5 | 100 | 88.9994 | 95,924,800.0 | |
Sand, White, 100 mesh | Baker Hughes | Proppant | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 1.74586 | 1,880,080.0 | |
GW-3LDF | Baker Hughes | Gelling Agent | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0680998 | 73334.9 | |
Ingredients in Additive(s) (MSDS and non-MSDS) | Baker Hughes | See Trade Name(s) List | Crystalline Silica: Quartz | 14808-60-7 | 5 | 0.003402 | 3666.75 | |
Potassium Chloride | 7447-40-7 | 1 | 0.0001508 | 162.522 | ||||
Ammonium Chloride | 12125-02-9 | 3 | 0.0024851 | 2678.52 | ||||
Isotridecanol, ethoxylated | 9043-30-5 | 5 | 0.003402 | 3666.75 | ||||
Sodium Chloride | 7647-14-5 | 5 | 0.0042927 | 4626.72 | ||||
Citric Acid | 77-92-9 | 60 | 0.0017311 | 1865.8 | ||||
Polyoxythylene Sorbitan Monooleate | 9005-65-6 | 0.5 | 0.0004142 | 446.42 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000670 | 7.1775 | ||||
Quaternary Ammonium Compound | 68424-85-1 | 5 | 0.0004558 | 491.313 | ||||
Petroleum Distillates | 64742-47-8 | 30 | 0.0204121 | 22000.5 | ||||
Water | 7732-18-5 | 95 | 0.419021 | 451626 | ||||
2-Propenoic, Polymer with Sodium Phosphinate, Sodium Salt | 71050-62-9 | 20 | 0.0030158 | 3250.44 | ||||
Crystalline Silica (Quartz) | 14808-60-7 | 100 | 10.2869 | 11,087,400.0 | ||||
Hydrotreated Light Distillate | 64742-47-8 | 30 | 0.0248514 | 26785.2 | ||||
2-butoxy-1-propanol | 15821-83-7 | 0.1 | 0.00006800 | 73.3349 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 2 | 0.0016568 | 1785.68 | ||||
Didecyl Dimethyl Ammonium Chloride | 7173-51-5 | 10 | 0.0009117 | 982.625 | ||||
Methanol | 67-56-1 | 100 | 0.0006659 | 717.75 | ||||
Guar Gum | 9000-30-0 | 100 | 0.0535213 | 57685.9 | ||||
Olefin | 64743-02-8 | 5 | 0.00003330 | 35.8875 | ||||
Calcium Chloride | 10043-52-4 | 5 | 0.0007539 | 812.61 | ||||
Paraffinic Petroleum Distillate | 64742-55-8 | 30 | 0.0204121 | 22000.5 | ||||
Modified Thiourea Polymer | 68527-49-1 | 7 | 0.00004660 | 50.2425 | ||||
Mineral Oil | 8042-47-5 | 70 | 0.0476283 | 51334.4 | ||||
Poly (acrylamide-co-acrylic acid) partial sodium salt | 62649-23-4 | 30 | 0.0248514 | 26785.2 | ||||
Hemicellulase Enzyme Concentrate | 9025-56-3 | 5 | 0.0007736 | 833.78 | ||||
Oleamide DEA | 93-83-4 | 2 | 0.0016568 | 1785.68 | ||||
Sorbitan Monooleate | 1338-43-8 | 0.5 | 0.0004142 | 446.42 | ||||
1-butoxy-2-propanol | 5131-66-8 | 5 | 0.003402 | 3666.75 | ||||
Ethylene Glycol | 107-21-1 | 45 | 0.0067855 | 7313.49 | ||||
Fatty Acids | 61790-12-3 | 10 | 0.00006660 | 71.775 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.0629588 | 67857.8 | ||||
Ethanol | 64-17-5 | 5 | 0.0004558 | 491.313 | ||||
Propargyl Alcohol | 107-19-7 | 5 | 0.00003330 | 35.8875 | ||||
Polyoxyalkylenes | 68951-67-7 | 30 | 0.0001998 | 215.325 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.0027351 | 2947.88 | ||||
Sand, White, 40/70 | Baker Hughes | Proppant | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 4.27626 | 4,605,000.0 | |
Ferrotrol 300L | Baker Hughes | Iron Control | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0028877 | 3109.67 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-11-10 | H2O | 15 | 54852 Gal | 241963 | BAKER-HUGHES | STAGE 60/60
30 SHOTS |
2020-08-14 | H2O | 15 | 7021 Bbl | 233240 | US Well Services Inc | STAGE 1/60
60 SHOTS STAGES 2-59 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | ANTERO RESOURCES CORPORATION | 471804 | 895 | 32 |
2015 | ANTERO RESOURCES CORPORATION | 3883718 | 1993 | 365 |
2016 | ANTERO RESOURCES CORPORATION | 1622421 | 299 | 363 |
2017 | ANTERO RESOURCES CORPORATION | 1013348 | 198 | 365 |
2018 | ANTERO RESOURCES CORPORATION | 733253 | 287 | 365 |
2019 | ANTERO RESOURCES CORPORATION | 150462 | 114 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | ANTERO RESOURCES CORPORATION | Brine | 9125 | 32 |
2015 | ANTERO RESOURCES CORPORATION | Brine | 38545 | 365 |
2016 | ANTERO RESOURCES CORPORATION | Brine | 21588 | 363 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 10150 | 365 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 6729 | 365 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 1353 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1591927398 | 2014-8-25 0:00: | CT | No Violations | 2.00 |
-1698886033 | 2014-6-19 0:00: | CT | No Violations | |
-1864153381 | 2013-11-30 0:00 | CS | No Violations | 2.00 |
-524608059 | 2014-2-14 0:00: | DD | No Violations | |
-969069852 | 2019-2-7 0:00:0 | PW | No Violations | 0.20 |
0023145392 | 2013-12-03 | Drill / Deepen / Reopen | No Violations | Status check inspection on the current drilling progress found the current well bore drilling depth to be 2562 using a 12.250 directional hammer bit assembly with the company taking directional surveys every 120 and a current noted azimuth of 200.95 degrees and inclination of 1.82 degrees. |
0524608059 | 2014-02-14 | Drill / Deepen / Reopen | No Violations | Stopped by drill site to check for containment around dirty water tanks, all produced water is being stored within containment area. |
0562109049 | 2018-03-07 | Production Wells | No Violations | Status check inspection found the well is equipped with a casing and tubing well head assembly with (2) manually operated valves on the tubing well head and one emergency shut down valve on the tubing tree production flow line. The well head casing flow line is also tied into the production flow line however the valves are in the closed position. The 13.375 and 9.625 casing well head assemblies have flowlines with valves and gauges installed to monitor annular pressure. The 13.375 casing well head pressure gauge reads 400 pounds pressure and the 9.625 casing well head reads 450 pounds pressure. On pad total is (8) complete wells supported by (8) gas processing units. Also on location is a production fluid facility consisting of a total of (8) steel construction tanks with a capacity of 400 barrels of fluid each, the tanks are situated inside a polymer lined steel containment dike area. The well lease road entrance is gated and locked with signage posted at the entrance of the well pad and at each well head. The well pad has a stone surface along with the lease road. The well pad perimeter berm is of earthen material and in good repair. |
0969069852 | 2019-02-07 | Production Wells | No Violations | On this day, I found the pad gated with signage at the entrance. There are (8) producing wells, (8) gas processing units, (4) 400-barrel steel production tanks within polymer-lined steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 100 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 300 psi. It will be noted that in 2018 a slip had occurred along the southern slope of the pad and western slope of the lease road, prior to the pad. The slopes have since been graded, seeded, and erosion control in place. Currently awaiting new vegetation. |
1069132573 | 2014-02-03 | Drill / Deepen / Reopen | No Violations | Status check inspection on the current drilling progress found the current drilling depth to be 11,752 in the horizontal well bore section with a current azimuth of 332.06 degrees and inclination of 90 degrees. |
1238725618 | 2020-5-21 0:00: | PL | No Violations | 1.00 |
1383339031 | 2013-11-01 | Drill / Deepen / Reopen | No Violations | The said well was spudded on 10/30/2013 with 100 of 26 conductor being set and cemented to surface. |
1385337954 | 2013-11-24 | Casing String Witnessed | No Violations | On 11/24/13 Patterson Drilling rig 323 is now on the hole and 383 of 18.625 surface casing was set and cemented to surface by Halliburton Cementing services with 100% excess of class A cement ran and 53 barrels of cement returns to surface, No cement wiper plug was ran and the casing shall be pressure tested before drilling out from under the surface pipe. The cement water was tested with no chlorides showing above unacceptable levels. Due to cold weather conditions and the last joint having to circulated in the job took longer than anticipated. |
1387275126 | 2013-12-16 | Casing String Witnessed | No Violations | Status check inspection on the 9.625 casing cement job, Halliburton was on site to cement the casing set at 7,336, A casing tally was received and reviewed along with the proposed cement job. |
1591927398 | 2014-08-25 | Completion Testing | No Violations | Status check inspection of the completion process found that during the recent stimulation process a leak was discovered and repaired in the well head and a solid retrievable bridge plug was set in the 5.5 casing at a depth of 7,250 in the horizontal 20 degree curve section of the well bore and the well head consist pressure tested, directly following a attempt to recover the retrievable bridge plug was unsuccessful using the wireline services and coil tubing was brought in and ran in the hole with a fishing overshot and hydraulic jars being used to grab ahold of the lost tools but unsuccessful in recovering the lost tools, a service rig is to be mobilized and set up on the hole and the coil tubing shall be cut off and stick tubing ran in the hole in order to fish out the lost tools and plug. |
1631755422 | 2013-12-10 | Drill / Deepen / Reopen | No Violations | Status check inspection on the drilling progress found the current drilling depth to be 6345 using a 12.250 drill bit with a projected well bore total depth for this intermediate well bore stage of 7337. I was notified that the company was running back in the hole with the drill string after a bit change trip and was approximately 1000 off bottom and attempted to circulate the hole and a down hole restriction caused a overpressure surface condition allowing the discharge line to fail emitting a 2% brine mist, I spoke with my supervisor and due to this being a lit mist discharge only with no reported quantity we are not requiring and surface material to be removed, the company will test the affected area using a 3rd party contractor for unwanted excessive contamination of the affected area. |
1698886033 | 2014-06-19 | Completion Testing | No Violations | Status check inspection found Fortis well service on the hole pulling the work over string out of the hole after completing a toe sleeve clean out run, perforations were shot from 19,261 to 19,263 to allow the company to pump down the wireline tools to begin the simulation process in the next 72 hours. |
1788391357 | 2013-12-12 | Drill / Deepen / Reopen | No Violations | Patterson rig 332 was at depth of 7065 in 12.25 open hole. The rig is running motors off of Natural gas and have frozen off. Company is working on issue to get hole drilled and run 9.625casing. |
1864153381 | 2013-11-30 | Casing String Witnessed | No Violations | On 11/30/13 2,264 of 13.375 1st intermediate casing was ran and set in place and cemented to surface by Halliburton Cement services with 84 barrels of cement returns to surface. |
23145392 | 2013-12-3 0:00: | DD | No Violations | 1.60 |
562109049 | 2018-3-7 0:00:0 | PW | No Violations |
For data sources see[10]