| Well ID: 34-111-24476 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.84,"lon":-81.03,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Monroe | |
| Municipality: Sunsbury Township | |
| Operator Name: GULFPORT APPALACHIA LLC | |
| Well Pad ID: US-OH-001047 | |
| Farm/Lease Name: WESTHAWK 210209 | |
| License Status: Producing | |
| License Date: 2014-06-04 | |
| Spud Date: 2014-06-12 | |
| Spud Drilling Contractor: PATTERSON DRILLING | |
| Final Drill Date: 2014-08-25 | |
| Well Total Depth: 16236.00 ft | |
| Configuration: Horizontal | |
| Latitude: 39.840000 | |
| Longitude: -81.030000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2014-06-04 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:6/4/2014, Expired Date:6/3/2016 12:00:00 PM, Drilling unit acres:649.886, Proposed Well Type:OG, Proposed Well Class:EDPW |
| Reached Total Depth | 2014-08-25 | |
| Completion Report Received | 2015-12-01 | |
| Correction to Well | 2015-12-18 | TARGET/TAKEPOINT CHANGE PER AS-DRILLED PLAT-ALE |
| Construction Permit Expires | 2016-06-03 | |
| Record Last Modified | 2019-06-11 |
For data sources see[2]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 03/25/2015 | 04/26/2015 | 9642 | 8,226,120.0 | 0 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | VBL-29 | X-Chem, LLC | Breaker | Hydrogen Peroxide | 7722-84-1 | 10 | 0.00201166 | 0 |
| Water | 7732-18-5 | 90 | 0.0181049 | 0 | ||||
| B-84 | X-Chem, LLC | Biocide | Ethanol | 64-17-5 | 4 | 0.000978966 | 0 | |
| Water | 7732-18-5 | 55.5 | 0.0135831 | 0 | ||||
| n-Alkyl dimethyl benzyl ammonium chloride | 68424-85-1 | 5.5 | 0.00134608 | 0 | ||||
| Glutaraldehyde | 111-30-8 | 27 | 0.00660802 | 0 | ||||
| Didecyl dimethyl ammonium chloride | 7173-51-5 | 8 | 0.00195793 | 0 | ||||
| Muriatic Acid | Axiall, LLC | Acid | Water | 7732-18-5 | 60 | 0.229575 | 0 | |
| Hydrogen chloride | 7647-01-0 | 40 | 0.15305 | 0 | ||||
| SC-30 | X-Chem, LLC | Scale Inhibitor | Sodium Polyacrylate | Proprietary | 30 | 0.00328798 | 0 | |
| Water | 7732-18-5 | 70 | 0.00767196 | 0 | ||||
| 100 mesh | Minerva/Cadiz | Proppant | Sand | 14808-60-7 | 100 | 0.303923 | 0 | |
| SFR-451 | X-Chem, LLC | Friction Reducer | Ammonium acetate | 631-61-8 | 6 | 0.00579981 | 0 | |
| Water | 7732-18-5 | 59 | 0.0570315 | 0 | ||||
| Hydrotreated light distillates | 64742-47-8 | 35 | 0.0338322 | 0 | ||||
| Fresh water | Stingray | Carrier | Water | 7732-18-5 | 100 | 88.2216 | 0 | |
| TCA 6038F | X-Chem, LLC | Corossion Inhibitor | Water | 7732-18-5 | 80 | 0.00396142 | 0 | |
| Methanol | 67-56-1 | 20 | 0.000990356 | 0 | ||||
| 40/70 White | Steubenville/Cadiz | Proppant | Sand | 14808-60-7 | 100 | 10.8687 | 0 | |
| POLYfrac PTL Plus M-4.0 | PfP Technology | Proppant Carrier | Guar Gum | 9000-30-0 | 50 | 0.0330306 | 0 | |
| Petroleum Distillate | 64742-47-8 | 55 | 0.0363337 | 0 | ||||
| Water | 7732-18-5 | 1 | 0.000660612 | 0 | ||||
| Clay | Proprietary | 4 | 0.00264245 | 0 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2015-04-26 | H2O | 15 | 237090 Gal | 273400 | STINGRAY PRESSURE PUMPING LLC | STAGE 34/34
45 SHOTS |
| 2015-03-25 | H2O | 15 | 183540 Gal | 66360 | STINGRAY PRESSURE PUMPING LLC | STAGE 1/34
45 SHOTS STAGES 2/33 |
| 15 | 0 | 0 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2015 | GULFPORT ENERGY CORPORATION | 1808012 | 0 | 165 |
| 2016 | GULFPORT ENERGY CORPORATION | 2167058 | 0 | 339 |
| 2017 | GULFPORT ENERGY CORPORATION | 989463 | 1 | 354 |
| 2018 | GULFPORT ENERGY CORPORATION | 528399 | 0 | 356 |
| 2019 | GULFPORT ENERGY CORPORATION | 94147 | 0 | 90 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2015 | GULFPORT ENERGY CORPORATION | Brine | 24003 | 165 |
| 2016 | GULFPORT ENERGY CORPORATION | Brine | 11452 | 339 |
| 2017 | GULFPORT ENERGY CORPORATION | Brine | 6451 | 354 |
| 2018 | GULFPORT ENERGY CORPORATION | Brine | 4021 | 356 |
| 2019 | GULFPORT ENERGY CORPORATION | Brine | 809 | 90 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1188375334 | 2019-4-10 0:00: | PW | No Violations | 0.10 |
| -147019228 | 2014-8-18 0:00: | DD | No Violations | 1.00 |
| -1633230436 | 2018-2-26 0:00: | PW | No Violations | 0.20 |
| -1834398396 | 2020-2-28 0:00: | PW | No Violations | 0.40 |
| -1937924463 | 2014-8-22 0:00: | DD | No Violations | 1.50 |
| -71725964 | 2018-1-16 0:00: | PW | No Violations | 0.50 |
| -764352275 | 2014-8-10 0:00: | DD | No Violations | 0.50 |
| 0071725964 | 2018-01-16 | Production Wells | No Violations | Shale well status check inspection found a total of (4) active wells on the pad completed and in production. All wells have proper identification posted. There is also a total of (4) gas processing units on location supporting each of the wells. At the production fluid storage area there is a total of (4) steel construction 400 barrel capacity steel tanks present, all situated inside a polymer lined steel containment dike area with identification posted at the production facility and well pad entrance also. There is a steel gate at the well pad entrance with master control shut off buttons at the well pad entrance and 2 other points on the well pad including the well heads and gas processing units. |
| 0147019228 | 2014-08-18 | Drill / Deepen / Reopen | No Violations | Status check inspection on the drilling process found the 2nd intermediate 12.250 well bore section total drilling depth reached at 8,944 by Patterson Drilling rig 538, Schlumberger wire line service is logging the open hole and once completed the company will run and cement the 9.625 casing. |
| 0764352275 | 2014-08-10 | Drill / Deepen / Reopen | No Violations | Status check inspection found Patterson rig 538 on the hole rigging up the blow out preventer assembly to begin drilling the 2nd intermediate 12.250well bore. |
| 0975144431 | 2018-08-28 | Production Wells | No Violations | Status check inspection found 4 wells total on the well pad. The pad surface and lease road is of stone surface construction and in good repair. The said well is selling off the tubing head with artificial lift technology present. Annular pressure monitoring is present on the well head A&B sections. All but one gas processing unit has been removed. The production facility consists of (4) 400 barrel steel tanks and one 50 barrel steel tank, all situated inside a polymer lined steel containment dike area. Proper well identification and signage is posted. |
| 1150992459 | 2015-06-10 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well drilling and completion phase is now complete and the well is now in the flow back process stage with 4 gas processing units on location, one to support each well on location. At the production storage facility there is 4-400 barrel production tanks present inside a plastic lined steel containment dike area. Addressing the preliminary restoration it was observed that there is adequate vegetation established within the boundaries of the limits of disturbance. Proper erosion control has been maintained. Preliminary Restoration passed on this day. |
| 1188375334 | 2019-04-10 | Production Wells | No Violations | On this day, I found the pad gated with signage at the entrance. There are (4) producing wells equipped with a plunger lift system, (4) gas processing units, (4) 400-barrel steel production tanks within steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 0 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 380 psi. The production records are current. |
| 1402638820 | 2014-06-13 | Casing String Witnessed | No Violations | The said well was spudded on 06/12/2014 by Rocky Mountain Drillings top hole rig with 112 of 26 conductor being set on 06/13/2014 inside a 32 borehole with Stingray cement services cementing the conductor with 238 sacks of class A cement with good cement returns to surface. |
| 1407460907 | 2014-08-07 | Casing String Witnessed | No Violations | On08/07/14 Patterson rig #538 is now rigged up on the hole and has drilled the 24 surface borehole to 334 and ran 300 of 18.625 87.5# casing with O-Tex cement service on location to cement the casing back to surface with 470 sacks of class H cement with 30% open hole cement excess ran and 7 barrels of good cement returns to surface, the cement mix water was from a municipal source and verified good by the cement company. |
| 1633230436 | 2018-02-26 | Production Wells | No Violations | Status check inspection found the well pad equipped with a total of (4) producing wells with each well equipped with emergency shut down devices (ESD) there is also ESD Devices at the production facility and at the well pad entrance and well as the gas processing units. The well head is equipped with a casing head however the casing flow lines are not attached. The well has been recently set up to be produced by the means of a plunger lift system selling into the production flow line. The tubing flow cross section has been removed to install the plunger lift system. Annular pressure monitoring is in place. Also on location is the production facility consisting of 4 steel construction tanks capable of holding 400 barrels of fluid each. The tanks are situated inside a polymer lined steel containment dike area. |
| 1937924463 | 2014-08-22 | Drill / Deepen / Reopen | No Violations | Status check inspection on the drilling process found the current drilling depth to be 13,439 in the horizontal well bore section using a 8.5 diameter directional drilling assembly and 11.50 synthetic oil based drilling fluid. Chloride strip tests were administered in the standing water on location generated from the recent rainfall with no unacceptable levels being found, the company is also testing all fluids for chlorides. |
| 1978951975 | 2015-08-11 | Production Wells | No Violations | Producing well status check inspection found a total of 4 wells located on this location, the (Westhawk Pad) with all 4 well now in production daily. Annular pressure gauges are in place monitoring the annular casing pressure. At the entry point of the location a master control Emergency Shutdown button can be found for this location. |
| 1985491533 | 2014-08-20 | Drill / Deepen / Reopen | No Violations | |
| 975144431 | 2018-8-28 0:00: | PW | No Violations | 0.20 |