Well Details

Well ID: 34-111-24482
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Sunsbury Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-001056
Farm/Lease Name: CAMPBELL 210092
License Status: Producing
License Date: 2014-06-11
Spud Date: 2014-07-24
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2014-10-23
Well Total Depth: 16760.00 ft
Configuration: Horizontal
Latitude: 39.830000
Longitude: -81.050000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-06-11 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:6/11/2014, Expired Date:6/10/2016 12:00:00 PM, Drilling unit acres:704.214, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2014-10-23
Completion Report Received 2015-12-01
Correction to Well 2015-12-18 TARGET/TAKEPOINT CHANGE PER AS-DRILLED PLAT-ALE
Construction Permit Expires 2016-06-10
Record Last Modified 2017-10-24

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/25/2015 06/28/2015 9538 8,618,480.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh water Stingray Carrier Water 7732-18-5 100 88.5841 0
Plexgel 907L-EB Chemplex SOLVAY Viscosifier Cyrstalline Silica 14808-60-7 0.06 0.00001628 0
Organophylic Clay Proprietary 2 0.000542696 0
Distillate(petroleum), hydrotreated light 64742-47-8 50 0.0135674 0
Guar Gum 9000-30-0 50 0.0135674 0
Alcohol ethoxylate 34398-01-1 0.99 0.000268634 0
TCA 6038F X-Chem, LLC Corossion Inhibitor Water 7732-18-5 80 0.00390448 0
Methanol 67-56-1 20 0.000976119 0
SC-30 X-Chem, LLC Scale Inhibitor Sodium Polyacrylate Proprietary 30 0.00328437 0
Water 7732-18-5 70 0.00766353 0
B-84 X-Chem, LLC Biocide Didecyl dimethyl ammonium chloride 7173-51-5 8 0.00277713 0
Glutaraldehyde 111-30-8 27 0.00937282 0
Water 7732-18-5 55.5 0.0192664 0
n-Alkyl dimethyl benzyl ammonium chloride 68424-85-1 5.5 0.00190928 0
Ethanol 64-17-5 4 0.00138857 0
40/70 White Steubenville/Cadiz Proppant Sand 14808-60-7 100 10.5658 0
VBL-29 X-Chem, LLC Breaker Water 7732-18-5 90 0.00537002 0
Hydrogen Peroxide 7722-84-1 10 0.000596669 0
Muriatic Acid Axiall, LLC Acid Water 7732-18-5 60 0.200801 0
Hydrogen chloride 7647-01-0 40 0.133867 0
FRA 409 Weatherford Friction Reducer Proprietary Proprietary 30 0.0295022 0
Adipic acid 124-04-9 3 0.00295022 0
Ethanaminium, N,N,N-trimethyl-2-[(1-oxo-2-propenyl)oxy]-,

chloride, polymer with 2-propenamide

69418-26-4 70 0.0688386 0
Petroleum Distillate 64742-47-8 10 0.00983408 0
Alcohols, C12-14-secondary, ethoxylated 84133-50-6 5 0.00491704 0
100 mesh Minerva/Cadiz Proppant Sand 14808-60-7 100 0.551919 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2015-06-28 H2O 10 260274 Gal 275480 STINGRAY PRESSURE PUMPING LLC STAGE 36/36

50 SHOTS

2015-05-25 H2O 10 257588 Gal 275640 STINGRAY PRESSURE PUMPING LLC STAGE 1/36

50 SHOTS

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 GULFPORT ENERGY CORPORATION 819439 0 80
2016 GULFPORT ENERGY CORPORATION 2468952 0 335
2017 GULFPORT ENERGY CORPORATION 807009 0 359
2018 GULFPORT ENERGY CORPORATION 399449 0 357
2019 GULFPORT ENERGY CORPORATION 75066 0 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 GULFPORT ENERGY CORPORATION Brine 9097 80
2016 GULFPORT ENERGY CORPORATION Brine 13287 335
2017 GULFPORT ENERGY CORPORATION Brine 5042 359
2018 GULFPORT ENERGY CORPORATION Brine 2683 357
2019 GULFPORT ENERGY CORPORATION Brine 491 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1057576072 2014-9-30 0:00: DD No Violations
-1498636755 2015-9-2 0:00:0 CT No Violations 1.00
-1518699104 2020-3-18 0:00: PW No Violations 1.00
-1560822228 2015-5-11 0:00: PL No Violations 1.00
0385672101 2015-07-22 Completion Testing No Violations Status check inspection on the well drilling process found the well drilling and stimulation process now complete with 4 wells on location awaiting the workover rig to drill out the completion plugs and run the production tubing. All completion work is being conducted on 2 levels of containment. The company has contractors on location finishing the installation of the 4 gas processing units and well production support equipment.
1057576072 2014-09-30 Drill / Deepen / Reopen No Violations Status check inspection on the current drilling process found Nomac Drilling rig # 311 on location with the 1st intermediate 17.5 well bore section total drilling depth complete at 2,291 and the 13.375 54.4# casing on location to be ran in the hole and cemented by Halliburton Cement services.
1498636755 2015-09-02 Completion Testing No Violations Status check inspection on the well completion process found the well stimulation process is now complete, the well also has 2.875 production tubing set and is now on line and producing, with a company know as Pro-flow testing services on location, the company is currently on day 6 of 12 proposed days the well will be flow tested, the well is on line and selling gas.
1560822228 2015-05-11 Preliminary Restoration No Violations Preliminary Restoration Status check inspection and well completion process update found a total of 4 wells have now been drilled on the Campbell well pad with all wells secured and awaiting a service rig to complete the toe prep clean out post-stimulation run. Upon completion the stimulation process will take place. The company has installed all well production flow lines and a tank battery has been constructed on location with a total of 4-400 barrel production tanks present. Upon review of the well pad perimeter it was observed that vegetation is established and no erosion issues noted as observed. The company has personnel in place monitoring any water that accumulates on location before discharging any fluid off site. Preliminary Restoration passed on this day.
1674991369 2014-10-19 Drill / Deepen / Reopen No Violations Status check inspection on the drilling process found Nomac Drilling rig 311 on location and the 8.5 production borehole total drilling depth has been reached at a depth of 16,760 with a directional azimuth of 149.28 degrees and 88.68 degree inclination, the company is conditioning the hole and preparing to pull the drill string.
1749058263 2019-04-10 Production Wells No Violations On this day, I found the pad gated with signage at the entrance. There are (4) producing wells equipped with a plunger lift system, (4) gas processing units, (4) 400-barrel steel production tanks within steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 0 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 400 psi. The production records are current.
2081558993 2014-10-09 Drill / Deepen / Reopen No Violations Status check inspection on the drilling process found the 12.250 2nd intermediate well bore total drilling depth of 8,625 has been reached and the company is conditioning the hole with fluid before pulling the drill string and running the 9.625 casing.
2097048706 2014-10-06 Drill / Deepen / Reopen No Violations Status check inspection of the current drilling process found Nomac Drilling rig 311 on location drilling the 12.250 2nd intermediate well bore section at a depth pf 6,640 misting on air, the 13.375 1st intermediate casing string was set and cemented to a depth of 2,332 with Stingray cement services cementing the casing using 1,694 sacks of class A cement with 24 barrels of cement returns to surface and the casing pressure tested to 500 psi over lift pressure.
385672101 2015-7-22 0:00: CT No Violations 0.60
643270810 2020-4-16 0:00: PW No Violations 0.30

For data sources see[9]

References