If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-111-24498 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.79,"lon":-81.04,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Monroe | |
| Municipality: Adams Township | |
| Operator Name: GULFPORT APPALACHIA LLC | |
| Well Pad ID: US-OH-001061 | |
| Farm/Lease Name: TRUAX 210124 | |
| License Status: Producing | |
| License Date: 2014-07-24 | |
| Spud Date: 2014-08-07 | |
| Spud Drilling Contractor: SIDEWINDER DRILLING INC | |
| Final Drill Date: 2014-09-27 | |
| Well Total Depth: 17296.00 ft | |
| Configuration: Horizontal | |
| Latitude: 39.790000 | |
| Longitude: -81.040000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2014-06-16 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:6/16/2014, Expired Date:6/15/2016 12:00:00 PM, Drilling unit acres:673.951, Proposed Well Type:OG, Proposed Well Class:EDPW |
| APP | 2014-07-24 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:7/24/2014, Expired Date:7/23/2016 12:00:00 PM, Drilling unit acres:673.951, Proposed Well Type:OG, Proposed Well Class:EDPW |
| Reached Total Depth | 2014-09-27 | |
| Completion Report Received | 2015-12-01 | |
| Correction to Well | 2015-12-18 | TARGET/TAKEPOINT CHANGE PER AS-DRILLED PLAT-ALE |
| Construction Permit Expires | 2016-07-23 | |
| Record Last Modified | 2017-10-24 |
For data sources see[2]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 02/19/2015 | 02/28/2015 | 9699 | 9,749,920.0 | 0 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | SC-30 | X-Chem, LLC | Scale Inhibitor | Sodium Polyacrylate | Proprietary | 30 | 0.00330622 | 0 |
| Water | 7732-18-5 | 70 | 0.00771452 | 0 | ||||
| Muriatic Acid | Axiall, LLC | Acid | Hydrogen chloride | 7647-01-0 | 40 | 0.0728281 | 0 | |
| Water | 7732-18-5 | 60 | 0.109242 | 0 | ||||
| POLYfrac PTL Plus M-4.0 | PfP Technology | Proppant Carrier | Water | 7732-18-5 | 1 | 0.00005958 | 0 | |
| Petroleum Distillate | 64742-47-8 | 55 | 0.00327678 | 0 | ||||
| Guar Gum | 9000-30-0 | 50 | 0.00297889 | 0 | ||||
| Clay | Proprietary | 4 | 0.000238312 | 0 | ||||
| VBL-29 | X-Chem, LLC | Breaker | Hydrogen Peroxide | 7722-84-1 | 10 | 0.00098769 | 0 | |
| Water | 7732-18-5 | 90 | 0.00888921 | 0 | ||||
| SFR-451 | X-Chem, LLC | Friction Reducer | Water | 7732-18-5 | 59 | 0.0652062 | 0 | |
| Ammonium acetate | 631-61-8 | 6 | 0.00663114 | 0 | ||||
| Hydrotreated light distillates | 64742-47-8 | 35 | 0.0386816 | 0 | ||||
| 40/70 White | Steubenville/Cadiz | Proppant | Sand | 14808-60-7 | 100 | 11.852 | 0 | |
| TCA 6038F | X-Chem, LLC | Corossion Inhibitor | Methanol | 67-56-1 | 20 | 0.000237019 | 0 | |
| Water | 7732-18-5 | 80 | 0.000948075 | 0 | ||||
| Fresh water | Stingray | Carrier | Water | 7732-18-5 | 100 | 87.5871 | 0 | |
| 100 mesh | Minerva/Cadiz | Proppant | Sand | 14808-60-7 | 100 | 0.218405 | 0 | |
| B-84 | X-Chem, LLC | Biocide | Ethanol | 64-17-5 | 4 | 0.000874466 | 0 | |
| Water | 7732-18-5 | 55.5 | 0.0121332 | 0 | ||||
| n-Alkyl dimethyl benzyl ammonium chloride | 68424-85-1 | 5.5 | 0.00120239 | 0 | ||||
| Glutaraldehyde | 111-30-8 | 27 | 0.00590264 | 0 | ||||
| Didecyl dimethyl ammonium chloride | 7173-51-5 | 8 | 0.00174893 | 0 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2015-02-28 | H2O | 15 | 348978 Gal | 405980 | STINGRAY PRESSURE PUMPING LLC | STAGE 29/29
45 SHOTS |
| 2015-02-19 | H2O | 15 | 354942 Gal | 400470 | STINGRAY PRESSURE PUMPING LLC | STAGE 1/28
45 SHOTS STAGES 2-27 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2015 | GULFPORT ENERGY CORPORATION | 1793861 | 0 | 212 |
| 2016 | GULFPORT ENERGY CORPORATION | 792298 | 0 | 351 |
| 2017 | GULFPORT ENERGY CORPORATION | 497380 | 1 | 352 |
| 2018 | GULFPORT ENERGY CORPORATION | 291849 | 1 | 359 |
| 2019 | GULFPORT ENERGY CORPORATION | 53689 | 0 | 90 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2015 | GULFPORT ENERGY CORPORATION | Brine | 37829 | 212 |
| 2016 | GULFPORT ENERGY CORPORATION | Brine | 12304 | 351 |
| 2017 | GULFPORT ENERGY CORPORATION | Brine | 8145 | 352 |
| 2018 | GULFPORT ENERGY CORPORATION | Brine | 5369 | 359 |
| 2019 | GULFPORT ENERGY CORPORATION | Brine | 974 | 90 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1113784730 | 2014-9-18 0:00: | DD | No Violations | 0.60 |
| -1556836309 | 2020-2-28 0:00: | PW | No Violations | 0.40 |
| -678366331 | 2014-9-8 0:00:0 | DD | No Violations | 0.70 |
| -796072290 | 2019-3-11 0:00: | PW | No Violations | 0.20 |
| 0198171630 | 2014-09-12 | Drill / Deepen / Reopen | No Violations | Status check inspection on the drilling process found current drilling depth to be 3,699 using a 8.750 drilling assembly, The 9.625 1st intermediate was set at 2,307. |
| 0678366331 | 2014-09-08 | Drill / Deepen / Reopen | No Violations | Status check inspection on the drilling process found Sidewinder drilling rig 121 on location rigging up the blow out preventer on the 13.375 surface casing. |
| 0744881122 | 2014-09-07 | Casing String Witnessed | No Violations | I am onsite to witness the surface casing cementing operations. Sidewinder Drilling rig 121 drilled 357 of 17.5 hole and ran 357 of 13.375 casing. Stingray Cementing LLC cemented the casing in place with 474 sacks of class A cement with 2% CaCl and .25 pounds per sack of Celluseal. I witnessed Stingray verify the cement weight at 15.7 pounds per gallon with pressurized cement scales. I witnessed twelve barrels of cement returns to surface. The casing was pressured up to 1112 psi and lost only one psi. Circulation was maintained through out the job. |
| 0796072290 | 2019-03-11 | Production Wells | No Violations | On this day, I found the pad gated with signage at the entrance, and an Emergency Shutdown (ESD) prior to the gate. There are (5) wells setup to be produced by a plunger lift system, (5) vertical separators, and (6) 400-barrel steel production tanks within polymer-lined steel containment. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 0 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 0 psi. I spoke with Gulfport Energy Representative Steve Habig onsite. |
| 0858556991 | 2015-09-02 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well stimulation & completion process completed and the well now in production with a gas processing unit on location supporting the well. At the production fluid storage facility a total of 6-400 barrel production tanks are present inside a polymer lined metal dike area. There is currently a total of 5 active wells on this pad. Addressing the restoration- adequate vegetation and erosion control is in place in the affected area by the well site construction. |
| 1113784730 | 2014-09-18 | Drill / Deepen / Reopen | No Violations | Status check inspection on the drilling process found Sidewinder drilling rig 121 on location drilling the 8.5 directional curve section at a depth of 9,900 using 11.5# drilling mud with 43 recorded units of 3rd party gas. |
| 1410794685 | 2014-09-15 | Drill / Deepen / Reopen | No Violations | Status check inspection on the drilling process found Patterson rig 480 on location air drilling the 8.750 vertical well bore section with 4,680 cfm of air at a depth of 7,790 with a projected total depth to be 8,600 before switching to the 8.5directional drilling assembly. |
| 1412086313 | 2014-09-30 | Drill / Deepen / Reopen | No Violations | The well drilling process was completed on 09/28/14 with a total depth drilled of 17,297 along with a directional azimuth of 335.56 degrees and well bore true vertical depth of 9,684, 17,291 of 23# P-110 HC casing was ran and cemented by Stingray cement services using a lead and tail class H cement mix. Sidewinder rig 121 is on location and skidding to the # 3-C well. |
| 1424883975 | 2015-02-25 | Completion Testing | No Violations | Status check inspection on the well stimulation process found Stingray Pressure Pumping service on location completing the 18th stage to be stimulated with the annular casing pressure being monitored electronically during the stimulation process, all pressure iron being used is 15,000 psi working pressure and 15 tractor trailer pumping units are in use on the well pad along with 2 mixing blenders. Nine Energy wireline service is on location and the well bore has had a 15,000 psi rated completion plug set at a depth of 13,358 on this stage along with 45 perforations in the casing shot in 5 clusters of 9 shot bursts between the depths of 13,157 and 13,338. All equipment is located on primary containment with the well pad perimeter containment berm being the secondary containment with the outlet valves in the closed position during stimulation operations per company policy. |
| 198171630 | 2014-9-12 0:00: | DD | No Violations | |
| 64406472 | 2020-3-18 0:00: | PW | No Violations | 1.10 |
| 744881122 | 2014-9-7 0:00:0 | CS | No Violations | 6.00 |
| 858556991 | 2015-9-2 0:00:0 | PL | No Violations | 0.50 |
For data sources see[9]