X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24508

Well Details

Well ID: 34-111-24508
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Sunsbury Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-001127
Farm/Lease Name: ROBINETTE 210129
License Status: Producing
License Date: 2014-11-06
Spud Date: 2014-09-26
Spud Drilling Contractor: SIDEWINDER DRILLING INC
Final Drill Date: 2014-12-16
Well Total Depth: 17118.00 ft
Configuration: Horizontal
Latitude: 39.810000
Longitude: -81.000000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-09-12 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:9/12/2014, Expired Date:9/11/2016 12:00:00 PM, Drilling unit acres:703786, Proposed Well Type:OG, Proposed Well Class:EDPW
APP 2014-11-06 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:11/6/2014, Expired Date:11/5/2016 12:00:00 PM, Drilling unit acres:703.786, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2014-12-16
Completion Report Received 2016-06-15
Construction Permit Expires 2016-11-05
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-06-16 10135 16935 0
10135 16935 0
10135 16935 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 08/04/2015 08/25/2015 9932 10,539,900.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SC-30 X-Chem, LLC Scale Inhibitor Water 7732-18-5 70 0.007381 0
Sodium Polyacrylate Proprietary 30 0.00316329 0
TCA 6038F X-Chem, LLC Corossion Inhibitor Water 7732-18-5 80 0.00150822 0
Methanol 67-56-1 20 0.000377055 0
40/70 White Steubenville/Cadiz Proppant Sand 14808-60-7 100 9.54065 0
Fresh water Stingray Carrier Water 7732-18-5 100 89.0393 0
100 mesh Minerva/Cadiz Proppant Sand 14808-60-7 100 1.0722 0
Muriatic Acid Axiall, LLC Acid Water 7732-18-5 60 0.13384 0
Hydrogen chloride 7647-01-0 40 0.0892269 0
Breaker 3l Weatherford Breaker Sodium Chloride 7647-14-5 40 0.00006740 0
Water 7732-18-5 45 0.00007582 0
Sodium Chlorite 7758-19-2 5 0.00000842 0
Potassium Chloride 7447-40-7 10 0.00001685 0
B-84 X-Chem, LLC Biocide Water 7732-18-5 55.5 0.0179511 0
Ethanol 64-17-5 4 0.00129377 0
Didecyl dimethyl ammonium chloride 7173-51-5 8 0.00258754 0
n-Alkyl dimethyl benzyl ammonium chloride 68424-85-1 5.5 0.00177893 0
Glutaraldehyde 111-30-8 27 0.00873295 0
FRA 409 Weatherford Friction Reducer Proprietary Proprietary 30 0.0237467 0
Petroleum Distillate 64742-47-8 10 0.00791556 0
Adipic acid 124-04-9 3 0.00237467 0
Alcohols, C12-14-secondary, ethoxylated 84133-50-6 5 0.00395778 0
Ethanaminium, N,N,N-trimethyl-2-[(1-oxo-2-propenyl)oxy]-,

chloride, polymer with 2-propenamide

69418-26-4 70 0.0554089 0
Plexgel 907L-EB Chemplex SOLVAY Viscosifier Distillate(petroleum), hydrotreated light 64742-47-8 50 0.000367895 0
Organophylic Clay Proprietary 2 0.00001472 0
Alcohol ethoxylate 34398-01-1 0.99 0.00000728 0
Cyrstalline Silica 14808-60-7 0.06 0.00000044 0
Guar Gum 9000-30-0 50 0.000367895 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2015-08-04 H2O 0 7698 Bbl 275140 STINGRAY PRESSURE PUMPING LLC STAGE 1/38

50 SHOTS

2015-08-25 H2O 0 5549 Bbl 277880 STINGRAY PRESSURE PUMPING LLC STAGE 38/38

50 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 GULFPORT ENERGY CORPORATION 821398 0 86
2016 GULFPORT ENERGY CORPORATION 2367217 0 361
2017 GULFPORT ENERGY CORPORATION 843469 0 348
2018 GULFPORT ENERGY CORPORATION 482128 0 353
2019 GULFPORT ENERGY CORPORATION 88250 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 GULFPORT ENERGY CORPORATION Brine 26737 86
2016 GULFPORT ENERGY CORPORATION Brine 41636 361
2017 GULFPORT ENERGY CORPORATION Brine 15110 348
2018 GULFPORT ENERGY CORPORATION Brine 8714 353
2019 GULFPORT ENERGY CORPORATION Brine 1757 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1231082372 2019-5-28 0:00: PW No Violations 0.10
-1759957958 2015-8-11 0:00: CT No Violations 1.20
0239824109 2014-12-16 Casing String Witnessed No Violations Status check inspection on the current drilling process found Sidewinder Drilling rig 209 on location with the 8.5 production borehole total drilling depth reached at 17,118 with a true vertical depth of 9,794. The rig is currently running the production casing
0316446059 2015-11-24 Production Wells No Violations Status check inspection of the well head found the well equipped with a production tree and the well in line and producing into a gas processing unit. Proper annular pressure surface monitoring gauges are present at the well head. Also present on location supporting the 4 existing wells is a total of 4 gas processing units and a total of 4-400 barrel production tanks. Proper well identification is posted.
0677611664 2018-02-26 Production Wells No Violations Producing well status check inspection found the well producing off the tubing well head assembly. The tubing well head has (2) lower manually operated master valves between the production head flow cross section and the tubing head flow cross. The production flow cross outlet also has (2) manual operated valves and one valve that is hydraulically controlled remotely and is part of the well pad emergency shut down system (ESD) that can be remotely controlled from the (ESD) switches found at the well pad entrance - each gas processing unit and the production fluid storage facility, each of the (4) well heads also have (ESD) devices present. All (4) well heads have annular pressure gauges present. At the left rear corner of the well pad is the production facility consisting of a total of (4) steel construction tanks of steel design which are located inside a polymer lined steel containment dike area. The lease road and well pad are of gravel design and is in good repair.
1231082372 2019-05-28 Production Wells No Violations On this day, I found the pad fenced and gated with signage at the entrance. An earthen berm surrounds the perimeter of the pad. There are (4) producing wells equipped with a plunger lift system, (4) gas processing units (GPU) with sand traps, and (4) 400-barrel and (1) 50-barrel steel production tanks within polymer lined steel containment. An Emergency Shutdown (ESD) button is present at the production facility, wellheads, and entrance. Additionally, concrete barriers surround the perimeter of the wellheads and GPUs. Identification and annular pressure monitoring devices are present at the wellheads. The 9.625 inch diameter intermediate casing has a pressure of 500 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 0 psi.
1261768831 2020-3-18 0:00: PW No Violations 0.90
1411781402 2014-09-26 Casing String Witnessed No Violations On site for a 21:00 pm call out on 09/26 to witness the conductor cement job found the said well was spudded on 09/26/14 by Butchs Rat hole top hole rig with a 110 x 32 conductor borehole drilled and 115 of 26 .375 wall pipe set with Stingray Cement services on location to cement the casing using 416 sacks of Class A-2% calcium .25 pps flake.
1418084375 2014-12-07 Drill / Deepen / Reopen No Violations Status check inspection on the current drilling process found Sidewinder Drilling rig 209 on the hole drilling the 8.750 vertical well bore section at a depth of 6,986 misting on air @ 22 gallons per minute with the borehole deviated 13 degrees in the directional azimuth of 183.18 degrees with a projected total depth of the vertical section of 9,200 in which the company will the pull out of the hole with the drill string and switch over to a 8.5 directional drilling assembly to begin drilling the horizontal well bore section.
1485585999 2020-4-16 0:00: PW No Violations 0.30
1759957958 2015-08-11 Completion Testing No Violations Status check inspection on the well completion process found Stingray Pressure pumping service on location standing by to stimulate stage 12 while Nine Energy completes the perforation phase on well # 1 and Stingray stimulates stage 12 on well # 4. All 4 wells on the pad have 38 proposed total stages. Oil States service is providing well head control. All stimulation support equipment is located on secondary polymer containment while the earthen well pad perimeter serves as the primary site containment with the drain valves in the close position.
2044908585 2015-07-22 Preliminary Restoration No Violations Status check inspection on the well completion process found the well drilling process is now complete and the company awaiting Stingray Pressure pumping stimulation service to complete the well. Addressing the restoration the company has finalized the production equipment placement with a total of 4-400 barrel production tanks present on location along with 4 gas processing units. In review of the affected area by the well pad construction it was observed that adequate vegetation and erosion control is in place and the company will continue to monitor the surface water created on the pad throughout the well completion process.
239824109 2014-12-16 0:00 CS No Violations 0.70
316446059 2015-11-24 0:00 PW No Violations 0.50
677611664 2018-2-26 0:00: PW No Violations 0.20

For data sources see[10]

References