X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24560

Well Details

Well ID: 34-111-24560
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Washington Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-001192
Farm/Lease Name: DONATO 210637
License Status: Producing
License Date: 2015-07-20
Spud Date: 2015-04-18
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2015-09-21
Well Total Depth: 15914.00 ft
Configuration: Horizontal
Latitude: 39.640000
Longitude: -81.190000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-12-16 Proposed Formations:TRENTON, Issued Date:12/16/2014, Expired Date:12/15/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2015-05-05 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:5/5/2015, Expired Date:5/4/2017 12:00:00 PM, Drilling unit acres:327.409, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2015-05-20 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED.
Change of Owner 2015-07-17 Operator changed from 9193, AMERICAN ENERGY UTICA LLC to 8799, GULFPORT ENERGY CORPORATION
APP 2015-07-20 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:7/20/2015, Expired Date:7/19/2017 12:00:00 PM, Drilling unit acres:294.966, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2015-09-21 Status/TD depth based on Drill Survey 11-6-
Correction to Well 2016-03-25 change in target/takepoint per as drilled plat ALE
Construction Permit Expires 2017-07-19 Status/TD depth based on Drill Survey 11-6-
Completion Report Received 2017-11-21 Status/TD depth based on Drill Survey 11-6-
Record Last Modified 2017-12-13 Status/TD depth based on Drill Survey 11-6-

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-11-20 9589 9731 50
2017-11-20 15658 15800 40
15658 15800 40
9589 9731 50
9589 9731 50

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 11/20/2016 12/07/2016 9217 9,825,140.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 FRA-409 Lubrizol Friction Reducer Distillates, Petroleum, Hydrotreated Light 64742-47-8 30 0.026318 21581.4
Water 7732-18-5 70 0.0614086 50356.7
Bio B2512 Lubrizol Biocide Water 7732-18-5 90 0.031895 26154.7
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 10 0.00354389 2906.08
Sand (40/70 CL Proppant) Carbo Ceramic Inc. Proppant Ceramic materials and wares, chemicals 66402-68-4 100 10.7771 8,837,500.0
Hydrochloric Acid (28%) Oxy Acidizing Water 7732-18-5 64 0.149625 122697
Hydrochloric Acid (Hydrogen Chloride) 7732-18-5 36 0.0841641 69016.8
Water Rice Energy Carrier/Base Fluid Water 7732-18-5 100 87.8774 72,061,800.0
NEFE-180 Chemplex Corrosion Inhibitor/Iron Control Methanol 67-56-1 35 0.00054197 444.43
Coconut oil acid diethanolamine 68603-42-9 5 0.00007742 63.49
Acetic acid 64-19-7 65 0.00100652 825.37
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00007742 63.49
2-Ethylhexanol 104-76-7 10 0.000154849 126.98
Fatty acids, tall oil 61790-12-3 5 0.00007742 63.49
2-Propyn-1-ol 107-19-7 5 0.00007742 63.49
Olefin Proprietary 5 0.00007742 63.49
Sand (100 Mesh Proppant) Taylor Frac Proppant Silica Substrate 14808-60-7 100 0.970774 796060
SI-20W Stingray Pressure Pumping, LLC Scale Inhibitor Water 7732-18-5 55 0.000376939 309.1
Phosphinocarboxylic Acid 110224-99-2 45 0.000308405 252.9
BS-648 Lubrizol Scale Inhibitor Ammonia 7664-41-7 5 0.000626046 513.374
Water 7732-18-5 80 0.0100167 8213.98
Ammonium chloride 12125-02-9 10 0.00125209 1026.75
Methanol 67-56-1 5 0.000626046 513.374
ScaleClear 125W Lubrizol Scale Inhibitor Phosphonomethylated polyamine, cmpd. with substituted amine Proprietary 15 0.000453799 372.127
Ethylene Glycol 107-21-1 60 0.00181519 1488.51
Water 7732-18-5 22.5 0.000680698 558.19
Ammonium Chloride 12125-02-9 2.5 0.00007563 62.021

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-12-09 H2O 15 256914 Gal 275360 STINGRAY PRESSURE PUMPING LLC STAGE 35/35

STAGES 2-34 SEE IMAGES

2016-11-20 H2O 15 274638 Gal 275460 STINGRAY PRESSURE PUMPING LLC STAGE 1/35

STAGES 2-34 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 GULFPORT ENERGY CORPORATION 2070921 0 271
2018 GULFPORT ENERGY CORPORATION 920635 0 361
2019 GULFPORT ENERGY CORPORATION 161181 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 GULFPORT ENERGY CORPORATION Brine 42567 271
2018 GULFPORT ENERGY CORPORATION Brine 17385 361
2019 GULFPORT ENERGY CORPORATION Brine 3327 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-121223962 2018-3-5 0:00:0 PW No Violations 0.20
-1253515996 2020-7-17 0:00: PW No Violations 0.40
-1359058288 2015-12-9 0:00: PL No Violations 0.50
0121223962 2018-03-05 Production Wells No Violations On this day, I accompanied ODNR Inspector William Stolarik. Please refer to his comments for a detailed report. The lease road is gated with an emergency shutdown button on the left, at the entrance. The well is equipped with annular pressure monitoring and an emergency shutdown button is located at the wellhead. There are (4) gas processing units on the left of the pad, and all are equipped with an emergency shutdown button. At the backside of the pad are (4) 400 barrel steel tanks within containment. There is also a midstream processing facility at the back righthand side of the pad.
0176457339 2018-03-05 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. The well pad entrance is gated with signage posted. The well head is equipped with a multi bowl assembly and is set up to be produced from the tubing head well head section with (2) master control valves vertically above the tubing head and a flow cross above the upper valve. Attached to the flow cross is another master valve and then an emergency shut down. The emergency shut down valve has multiple control points on location identified as being at the well head the gas processing unit and production facility with a emergency shut down button at the location entry point also. Annular pressure monitoring gauges are present on both the 13.375casing and 9.625 casing well head section with 0 pounds per square inch (psi) between the 13.375 diameter casing and 9.625 diameter casing and 0 psi between the 9.625 diameter casing and the 5.5 diameter casing. The production tubing valves are open and no flow lines are attached the 5.5 diameter casing well head section. On the left (West) side of the well pad is (4) gas processing units and the production fluid storage area consisting of (4) steel tanks capable of holding 400 barrels fluid each. The tanks are situated inside a polymer lined steel containment dike area. The well pad perimeter earthen berm is intact and in good repair. The lease road and well pad has a gravel surface and is also in good repair.
1359058288 2015-12-09 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the area affected by the well pad construction has been restored with vegetation and erosion control established. Addressing the well- upon inspection it was observed that the well drilling process is complete and the well is awaiting the final completion process. No production equipment has been set on the well pad.
1441480358 2015-09-05 Casing String Witnessed No Violations Status check inspection to witness the surface casing cement job. Upon inspection it was observed the H&P Drilling rig # 628 is now on location and has drilled a 17.5 surface borehole to the depth of 1,,607 and ran 1,523 of 13.375 casing with a guide shoe and float collar along with bow spring centralizer casing equipment ran. Stingray cement service is on location to cement the casing using 1,483 sacks of class H cement with 30% open hole cement excess ran and circulation established to surface prior to cementing with 25 barres of 6% gel spacer ran ahead of the cement. Good cement returns were witnessed to surface and the casing was pressure tested to 500 psi over cement displacement lift pressure upon the landing of the plug.
176457339 2018-3-5 0:00:0 PL No Violations 0.50
1769475798 2015-04-23 Drill / Deepen / Reopen No Violations The said well was spudded on 04/18/2015 by Precision Rathole with a 100 x 36 conductor borehole being drilled. Allied Cement Service was on location to cement the casing using 270 sacks of Class A 2% calcium .125 pps flake -50% open hole excess cement with circulation established prior to cementing and good cement returns to surface.
1960945791 2020-4-30 0:00: PW No Violations 1.00

For data sources see[10]

References