If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-111-24562 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.64,"lon":-81.19,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Monroe | |
| Municipality: Washington Township | |
| Operator Name: GULFPORT APPALACHIA LLC | |
| Well Pad ID: US-OH-001192 | |
| Farm/Lease Name: DONATO 210568 | |
| License Status: Producing | |
| License Date: 2015-07-20 | |
| Spud Date: 2015-04-18 | |
| Spud Drilling Contractor: H&P DRILLING | |
| Final Drill Date: 2015-11-01 | |
| Well Total Depth: 19625.00 ft | |
| Configuration: Horizontal | |
| Latitude: 39.640000 | |
| Longitude: -81.190000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2014-12-16 | Proposed Formations:TRENTON, Issued Date:12/16/2014, Expired Date:12/15/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
| APP | 2015-05-05 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:5/5/2015, Expired Date:5/4/2017 12:00:00 PM, Drilling unit acres:468.061, Proposed Well Type:OG, Proposed Well Class:EDPW |
| Change of Owner | 2015-07-17 | Operator changed from 9193, AMERICAN ENERGY UTICA LLC to 8799, GULFPORT ENERGY CORPORATION |
| APP | 2015-07-20 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:7/20/2015, Expired Date:7/19/2017 12:00:00 PM, Drilling unit acres:462.734, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2015-11-01 | PR STATUS BASED ON 2Q PRODUCTION REPORTED...SO |
| Correction to Well | 2016-03-25 | change in target/takepoint per as drilled plat-ALE |
| Construction Permit Expires | 2017-07-19 | PR STATUS BASED ON 2Q PRODUCTION REPORTED...SO |
| Completion Report Received | 2017-11-21 | PR STATUS BASED ON 2Q PRODUCTION REPORTED...SO |
| Record Last Modified | 2017-11-22 | PR STATUS BASED ON 2Q PRODUCTION REPORTED...SO |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2017-11-20 | 9718 | 9862 | 50 |
| 2017-11-20 | 19010 | 19153 | 40 |
| 19010 | 19153 | 40 | |
| 9718 | 9862 | 50 | |
| 9718 | 9862 | 50 |
For data sources see[3]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 11/20/2016 | 12/31/2016 | 9219 | 12,592,700.0 | 0 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Bio B2512 | Lubrizol | Biocide | Water | 7732-18-5 | 90 | 0.0358735 | 35882.8 |
| 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 10 | 0.00398595 | 3986.98 | ||||
| FRA-409 | Lubrizol | Friction Reducer | Water | 7732-18-5 | 70 | 0.0553473 | 55361.6 | |
| Distillates, Petroleum, Hydrotreated Light | 64742-47-8 | 30 | 0.0237203 | 23726.4 | ||||
| Sand (100 Mesh Proppant) | Taylor Frac | Proppant | Silica Substrate | 14808-60-7 | 100 | 0.955272 | 955520 | |
| Hydrochloric Acid (28%) | Oxy | Acidizing | Hydrochloric Acid (Hydrogen Chloride) | 7732-18-5 | 36 | 0.107575 | 107603 | |
| Water | 7732-18-5 | 64 | 0.191245 | 191295 | ||||
| SI-20W | Stingray Pressure Pumping, LLC | Scale Inhibitor | Phosphinocarboxylic Acid | 110224-99-2 | 45 | 0.00862793 | 8630.17 | |
| Water | 7732-18-5 | 55 | 0.0105452 | 10548 | ||||
| Sand (40/70 CL Proppant) | Carbo Ceramic Inc. | Proppant | Ceramic materials and wares, chemicals | 66402-68-4 | 100 | 10.1215 | 10,124,100.0 | |
| NEFE-180 | Chemplex | Corrosion Inhibitor/Iron Control | 2-Ethylhexanol | 104-76-7 | 10 | 0.00002308 | 23.09 | |
| Acetic acid | 64-19-7 | 65 | 0.000150046 | 150.085 | ||||
| Fatty acids, tall oil | 61790-12-3 | 5 | 0.00001154 | 11.545 | ||||
| 2-Propyn-1-ol | 107-19-7 | 5 | 0.00001154 | 11.545 | ||||
| Alcohols, C14-15, ethoxylated | 68951-67-7 | 5 | 0.00001154 | 11.545 | ||||
| Olefin | Proprietary | 5 | 0.00001154 | 11.545 | ||||
| Methanol | 67-56-1 | 35 | 0.00008079 | 80.815 | ||||
| Coconut oil acid diethanolamine | 68603-42-9 | 5 | 0.00001154 | 11.545 | ||||
| Water | Rice Energy | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 88.4859 | 88,508,900.0 | |
| BS-648 | Lubrizol | Scale Inhibitor | Methanol | 67-56-1 | 5 | 0.00000704 | 7.041 | |
| Ammonia | 7664-41-7 | 5 | 0.00000704 | 7.041 | ||||
| Ammonium chloride | 12125-02-9 | 10 | 0.00001408 | 14.082 | ||||
| Water | 7732-18-5 | 80 | 0.000112628 | 112.658 |
For data sources see[4]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2016-12-16 | H2O | 15 | 87486 Gal | 19680 | STINGRAY PRESSURE PUMPING LLC | STAGE 1/53
STAGES 2-52 SEE IMAGES |
| 2016-12-30 | H2O | 15 | 212940 Gal | 208580 | STINGRAY PRESSURE PUMPING LLC | STAGE 53/53
STAGES 2-52 SEE IMAGES |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2017 | GULFPORT ENERGY CORPORATION | 2139783 | 0 | 272 |
| 2018 | GULFPORT ENERGY CORPORATION | 1174460 | 0 | 361 |
| 2019 | GULFPORT ENERGY CORPORATION | 208793 | 0 | 90 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2017 | GULFPORT ENERGY CORPORATION | Brine | 38022 | 272 |
| 2018 | GULFPORT ENERGY CORPORATION | Brine | 16294 | 361 |
| 2019 | GULFPORT ENERGY CORPORATION | Brine | 2982 | 90 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1593471612 | 2018-3-5 0:00:0 | PW | No Violations | 0.20 |
| -1836215490 | 2015-12-9 0:00: | PB | No Violations | 0.50 |
| 1444751813 | 2015-10-13 | Casing String Witnessed | No Violations | 10/13/2015-H&P Drilling rig 628 is now on the hole and has drilled a 17.5 surface hole to a depth of 1,410 and ran 13.375 54.5# J-55 casing to a depth of 1,402. Stingray cement service is on location to cement the casing using 1,307 sacks of class H cement with 25 barrels of 6% bentonite gel spacer ran ahead along with circulation established prior to cementing, the casing was pressure tested to 500 psi over lift pressure upon the landing of the cement plug with good cement returns witnessed to surface. |
| 1446051421 | 2015-10-28 | Drill / Deepen / Reopen | No Violations | |
| 1446597546 | 2015-11-03 | Drill / Deepen / Reopen | No Violations | Status check inspection to document the final drilling process in which was completed on 10/30/2015 by H&P Drilling rig # 628 by drilling the 8.5 production borehole to a depth of 19,265 and running 19,263 of 5.5 20# P-110 Casing with a float shoe and collar ran along with proper centralizer placement being demonstrated. Stingray Cement Service cemented the casing using a single slurry of 3,620 sacks of class H cement. |
| 1481577456 | 2016-12-12 | Completion Testing | No Violations | On site status check inspection on the well stimulation process- currently the company has a service rig contractor on the hole owned by Hybrid Services. The rig is attempting to recover a lost completion tools in the 5.5 diameter casing at measured depth of 19,160. The well bore is static and NOV services is providing well head surface control. Nine Energy Services is on location standing by to disarm the wireline guns once recovered. |
| 1520275141 | 2018-03-05 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. The well pad entrance is gated with signage posted. The well head is equipped with a multi bowl assembly and is set up to be produced from the tubing head well head section with (2) master control valves vertically above the tubing head and a flow cross above the upper valve. Attached to the flow cross is another master valve and then an emergency shut down. The emergency shut down valve has multiple control points on location identified as being at the well head the gas processing unit and production facility with a emergency shut down button at the location entry point also. Annular pressure monitoring gauges are present on both the 13.375casing and 9.625 casing well head section with 40 pounds per square inch (psi) between the 13.375 diameter casing and 9.625 diameter casing. 1,600 psi between the 9.625 diameter casing and the 5.5 diameter casing. The production tubing valves are open and no flow lines are attached the 5.5 diameter casing well head section. On the left (West) side of the well pad is (4) gas processing units and the production fluid storage area consisting of (4) steel tanks capable of holding 400 barrels fluid each. The tanks are situated inside a polymer lined steel containment dike area. The well pad perimeter earthen berm is intact and in good repair. The lease road and well pad has a gravel surface and is also in good repair. |
| 1593471612 | 2018-03-05 | Production Wells | No Violations | On this day, I accompanied ODNR Inspector William Stolarik. Please refer to his comments for a detailed report. The lease road is gated with an emergency shutdown button on the left, at the entrance. The well is equipped with annular pressure monitoring and an emergency shutdown button is located at the wellhead. There are (4) gas processing units on the left of the pad, and all are equipped with an emergency shutdown button. At the backside of the pad are (4) 400 barrel steel tanks within containment. There is also a midstream processing facility at the back righthand side of the pad. |
| 1633655881 | 2015-04-23 | Drill / Deepen / Reopen | No Violations | The said well was spudded on 04/18/2015 by Precision Rathole with a 100 x 36 conductor borehole being drilled. Allied Cement Service was on location to cement the casing using 270 sacks of Class A 2% calcium .125 pps flake -50% open hole excess cement with circulation established prior to cementing and good cement returns to surface. |
| 1805115077 | 2020-4-30 0:00: | PW | No Violations | 1.00 |
| 1836215490 | 2015-12-09 | Plug / Plug Back | No Violations | Preliminary Restoration status check inspection found the area affected by the well pad construction has been restored with vegetation and erosion control established. Addressing the well- upon inspection it was observed that the well drilling process is complete and the well is awaiting the final completion process. No production equipment has been set on the well pad. |
| 1996036082 | 2020-7-17 0:00: | PW | No Violations | 0.40 |
For data sources see[10]