Well ID: 34-111-24569 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.82,"lon":-80.92,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Switzerland Township | |
Operator Name: CNX GAS COMPANY LLC | |
Well Pad ID: US-OH-001216 | |
Farm/Lease Name: ILONA BABER ET AL | |
License Status: Producing | |
License Date: 2015-02-09 | |
Spud Date: 2015-06-01 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2016-11-16 | |
Well Total Depth: 16740.00 ft | |
Configuration: Horizontal | |
Latitude: 39.820000 | |
Longitude: -80.920000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-02-09 | Proposed Formations:POINT PLEASANT, Issued Date:2/9/2015, Expired Date:2/8/2017 12:00:00 PM, Drilling unit acres:1046.57, Proposed Well Type:OG, Proposed Well Class:EDPW |
Correction to Well | 2015-05-15 | INCREASE IN UNIT SIZE |
Correction to Well | 2015-06-05 | CORRECTION TO CASING PROGRAM FROM REQUEST BY OPERATOR. |
Correction to Well | 2016-05-14 | DECREASE IN UNIT SIZE-ALE |
Correction to Well | 2016-07-22 | Updated acreage per as proposed well plat |
Reached Total Depth | 2016-11-16 | STATUS UPDATED FROM PRODUCTION |
Construction Permit Expires | 2017-02-08 | STATUS UPDATED FROM PRODUCTION |
Correction to Well | 2017-02-10 | UPDATE TARGET/TAKEPOINT/ACREAGE PER AS DRILLED PLAT-ALE |
Completion Report Received | 2018-01-09 | STATUS UPDATED FROM PRODUCTION |
Record Last Modified | 2018-02-15 | STATUS UPDATED FROM PRODUCTION |
Correction to Well | 2018-02-16 | UPDATE TAKE PER AS-DRILLED PLAT |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-01-17 | 10849 | 10996 | 6 |
2018-01-17 | 16489 | 16640 | 9 |
16489 | 16640 | 9 | |
10849 | 10996 | 6 | |
10849 | 10996 | 6 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 01/28/2017 | 04/12/2017 | 10500 | 12,102,900.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 10.6112 | 12,128,100.0 |
X-Chem SFR-451 | X-Chem, LLC | Friction Reducer | Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.020251 | 23146 | |
Alcohols, C12-14, ethoxylated | 68439-50-9 | 5 | 0.003375 | 3857.67 | ||||
Ammonium acetate | 631-61-8 | 10 | 0.00675 | 7715.33 | ||||
Alcohols, C10-16, ethoxylated | 68002-97-1 | 5 | 0.003375 | 3857.67 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 5 | 0.003375 | 3857.67 | ||||
Xchem SC-30 | X-Chem, LLC | Scale Inhibitor | Sodium hydroxide | 1310-73-2 | 1.5 | 0.000131 | 149.494 | |
ICA-4000 | U.S. Well Services, LLC | Iron Control Additive | Hydroxyacetic acid | 79-14-1 | 5 | 0.000222 | 254.203 | |
Ethylene Glycol | 107-21-1 | 20 | 0.001002 | 1144.92 | ||||
Ammonium acetate | 35249-89-9 | 20 | 0.000711 | 812.65 | ||||
AP One | U.S. Well Services, LLC | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.000918 | 1049 | |
AI-303 | U.S. Well Services, LLC | Acid Corrosion Inhibitors | Polyether | 60828-78-6 | 10 | 0.00008800 | 100.08 | |
Formic acid | 64-18-6 | 20 | 0.000175 | 200.16 | ||||
Acetophenone,thiourea,formaldehyde polymer | 68527-49-1 | 5 | 0.00004400 | 50.04 | ||||
Ethylene glycol | 107-21-1 | 40 | 0.000501 | 572.458 | ||||
Cinnamaldehyde | 104-55-2 | 20 | 0.000181 | 206.965 | ||||
Butyl cellosolve | 111-76-2 | 20 | 0.000158 | 180.344 | ||||
Water | Consol Energy | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 88.3139 | 100,938,000.0 | |
LGC-15 | U.S. Well Services, LLC | Gelling Agents | Petroleum Distillates | 64742-47-8 | 60 | 0.033792 | 38622.6 | |
Guar Gum | 9000-30-0 | 50 | 0.035681 | 40781.6 | ||||
Suspending agent (solid) | 14808-60-7 | 3 | 0.005457 | 6237.19 | ||||
Surfactant | 68439-51-0 | 3 | 0.002141 | 2446.9 | ||||
X-Chem B-84 | X-Chem, LLC | Anti-Bacterial Agent | Ethanol | 64-17-5 | 5 | 0.001292 | 1476.18 | |
Didecyl dimethyl ammonium chloride | 7173-51-5 | 10 | 0.002583 | 2952.36 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.007749 | 8857.08 | ||||
n-Alkyl(C12-C16) dimethyl benzyl ammonium chloride | 68424-85-1 | 10 | 0.002583 | 2952.36 | ||||
HCL Acid (12.6%-17.5%) | U.S. Well Services, LLC | Bulk Acid | Hydrogen Chloride | 7647-01-0 | 17.5 | 0.177753 | 203162 | |
Water | 7732-18-5 | 87.4 | 0.764536 | 873825 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-04-12 | H2O | 15 | 415548 Gal | 502198 | US Well Services Inc | STAGE 30
STAGES 2-29 SEE IMAGES |
2017-01-28 | H2O | 15 | 312328 Gal | 352047 | US Well Services Inc | STAGE 1/30
STAGES 2-29 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | CNX GAS COMPANY LLC | 916024 | 0 | 165 |
2018 | CNX GAS COMPANY LLC | 637454 | 0 | 270 |
2019 | CNX GAS COMPANY LLC | 176639 | 0 | 76 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | CNX GAS COMPANY LLC | Brine | 15563 | 165 |
2018 | CNX GAS COMPANY LLC | Brine | 7494 | 270 |
2019 | CNX GAS COMPANY LLC | Brine | 2053 | 76 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1065043283 | 2017-8-16 0:00: | PW | No Violations | 0.50 |
-1409546625 | 2016-8-18 0:00: | DD | No Violations | 2.50 |
-1610041582 | 2016-10-31 0:00 | CS | No Violations | 12.00 |
-1752638998 | 2016-8-29 0:00: | DD | No Violations | 2.00 |
-638303953 | 2016-8-22 0:00: | CS | No Violations | 3.00 |
0392656937 | 2016-08-25 | Drill / Deepen / Reopen | No Violations | Status check inspection on the well drilling process found Patterson Drilling rig 801 on location with the 17.5 1st intermediate well bore total drilling depth recently reached at 2,573 the rig is currently running the 13.37554.5 lb./ft. casing, Allied Cement Service is standing by to cement the casing. |
0638303953 | 2016-08-22 | Casing String Witnessed | No Violations | On site inspection to witness the 18.625 mine string annular side cement grout job. Allied Cement service was on location and pumped 92 sacks of class A cement (20 bbl) through a 1 grout string set to 300; the tubing was pulled to 200 and cleared and operations were then shut down to allow the cement to cure for 2.5 hours. A 2nd 31 barrel class A 3% calcium cement mix was spotted and will be allowed to cure before running the grout string back in and attempting to tag the cement top and finishing the top out job off. |
0905881244 | 2015-11-10 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the area affected by the well pad construction has been restored with proper erosion control and vegetation in place. There is a total of 5 wells spudded on the pad, none of which are completed at this time. No production equipment is present on the well pad. |
0930048350 | 2019-05-02 | Production Wells | No Violations | On this day, I found the pad gated with signage at the entrance. There are (5) producing wells , (4) gas processing units with sand traps, (4) 400-barrel steel production tanks within steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance, tanks, and wellheads. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 457 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 28 psi. The production records are current. |
1065043283 | 2017-08-16 | Production Wells | No Violations | The purpose of my inspection was a status check on a production well. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Pressure gauges present read 2613 pounds per square inch on the tubing, 2953 pounds per square inch on the 5.5 inch diameter casing, 135 pounds per square inch on the 13.375 inch diameter first intermediate casing, 855 pounds per square inch on the 9.625 inch diameter second intermediate casing. The production equipment consisted of four 400 barrel tanks, five sand traps, and five gas production units. Identification was posted at the wellhead. |
1220592323 | 2015-06-03 | Casing String Witnessed | No Violations | The said well by Express Energys top hole rig with a 100 x 36 conductor borehole being drilled and 100 of 30 conductor being set. Express Energy cement service cemented the casing using 275 sacks of class A -2% calcium .50 pound per sack loss circulation material 50% open hole excess cement with good cement returns witnessed to surface and the cement mix water tested for chlorides and PH. |
1409546625 | 2016-08-18 | Drill / Deepen / Reopen | No Violations | Status check inspection on the well drilling process found Patterson 801 on location with the 24 mine string borehole recently drilled to 768 and a coal seam encountered at 688 to 693, the company men on site called on the evening of 08/17/2016 and indicated they did not encounter a mine void, the rig was directed to load the hole with fresh water and if the hole loaded no formation packer or DV tool would be required. The well bore broke down under hydrostatic pressure and did not load. The Company will run the formation packer and DV tool above the mine void. Gas was also encountered in the mine void. At the time of my inspection at 12:00 pm the rig was waiting on additional joints of 18.625 casing and indicated they would not be ready for at least 6 hours. |
1471732504 | 2016-08-20 | Casing String Witnessed | No Violations | On site inspection to witness the Mine String -surface casing. Patterson rig 801 is on location and has drilled a 24 borehole to 770 with a mine void encountered at 688 to 693. The rig then ran 735 of 18.625 87.5 lb/ft J-55 casing with a guide shoe ran on bottom and a float collar set at 605; a swell packer was set at 563 with a 2 stage cement tool directly above. The bottom section cement job consisted of 280 sacks of 15.6 lb/gl class A cement with the tool being deployed and circulation was not established to surface before initiating the 2nd stage of the cementing process consisting of 1059 sacks of class A cement. Cement returns were not witnessed to surface on the 2nd stage. The company has indicated the formation packer deployed. I have instructed the company to run a 1 grout string and properly cement the 18.625 annular area accoringly. Only the bottom stage was witness due to the extended period of time on location with contact made with my supervisor Brent Bear before departing location after 8 hours on location. |
1478783668 | 2016-11-09 | Drill / Deepen / Reopen | No Violations | During my inspection Allied Oilfield Services was rigging down from cementing the 9.625 inch diameter Intermediate casing. The 9.625 inch diameter casing was set at a depth of 9306 feet. |
1528140710 | 2018-06-04 | Work Over Reconditioning | No Violations | Status check inspection found a workover rig on the well owned by Deep Well Services, there is a workover blow out preventer on the well. The rig is fishing a lost 2.375 workover string of coil tubing lost in the well bore with the top of the tubing located at 11,018. The company man on site indicated they have washed over the lost string down to 11,480. The company is maintaining control over the 3,143 psi surface pressure using barrel in barrel out circulation using 12.5 pound per gallon production fluid. The 5.5 diameter production casing was set to 16,740 and the top perforation is at 10,848. The company man on site indicated he has a 45 day allowed time frame to attempt to recover the tubing. |
1529514775 | 2018-06-20 | Completion Testing | No Violations | Status check inspection found a service rig owned by Well Service Group rigged up on the hole and fishing a lost section of 2.375 coil tubing. The tubing top is at 12,001 measured depth. The rig has been fishing on the tubing for 34 days. The top perforation in the 5.5 diameter production casing is at 10,848 and the well bore true vertical depth is 10,400. |
1533578388 | 2018-08-06 | Work Over Reconditioning | No Violations | Status check inspection on the efforts to recover a lost 2.375 coil tubing string inside the 5.5diameter production casing string. The top of the tubing is currently at a measured depth of 14,672 . A service rig owned by Key Energy is rigged up on the well and is running in the hole with a wash over string consisting of 18 joints of 3.5 diameter 2,920 inside diameter high drill wash over pipe, the joint length is 32 average and the workover string is 2.875 PH6 tubing. The well bore true vertical depth is 10,400. The well bore is static with 9.6 pound per gallon brine. There is a BOP stack and snubbing unit on the well. The rig and support equipment is situated on polymer liner. This is a multi well pad. |
1610041582 | 2016-10-31 | Casing String Witnessed | No Violations | The purpose of my inspection is to witness the 18.625 inch diameter surface casing being cemented in a 24 inch diameter hole from a depth of 785 feet to 100 feet and a 30 inch diameter hole from 100 feet to surface. The casing shoe is at 745 feet and the Differential Valve Tool (DV Tool) is at 438 feet. Allied Oilfield Services are on location to complete the 2 stage cement job. During my inspection I attended the Pre-job safety meeting and then stood by the Allied company truck watching the computer that reads the density and the pressures of the pump truck. 240 barrels of H20 were used to break circulation, 10 barrels of gel and 10 barrels of water were pumped ahead of the 47.5 barrels of cement at 15.6 pounds per gallon. A sample of the cement was pulled and weighed in the portable field scales and the cement weighed 15.6 pounds per gallon. The pump truck shut down and the plug was released. The packer was set at 440 feet. The DV tool was opened and stage two began. 140 barrels were pumped to break circulation. 25 barrels of gel, 10 barrels of H20, and 150 barrels of cement at 15.6 pounds per gallon were pumped. A sample of the cement was pulled and weighed in the portable field scales and the cement weighed 15.6 pounds per gallon. The pump truck shut down to release the plug. 134 barrels were used for displacement and I witnessed roughly 45 barrels of cement returned to surface to the half round tanks. |
1675142807 | 2016-11-07 | Drill / Deepen / Reopen | No Violations | During my inspection Patterson 801 was at a depth of 8749 feet drilling a 12.25 inch diameter borehole. |
1750340096 | 2020-3-11 0:00: | PW | No Violations | 1.00 |
1752638998 | 2016-08-29 | Drill / Deepen / Reopen | No Violations | My inspection today finds the drilling rig Patterson Drilling 801 is drilling a 12.25 borehole at a depth of 6413. The company representative anticipated cementing the string on Thursday. |
1765402363 | 2016-08-25 | Drill / Deepen / Reopen | No Violations | The inspection today revealed that CNX Patterson 801 was currently getting ready to cement the 1st intermediate casing in the 17.5 inch diameter bore hole at 2573 feet measured depth. Allied cement was on site to cement the casing in the well head. |
392656937 | 2016-8-25 0:00: | DD | No Violations | |
905881244 | 2015-11-10 0:00 | PL | No Violations | 0.50 |
930048350 | 2019-5-2 0:00:0 | PW | No Violations | 0.10 |
For data sources see[10]