Well ID: 34-111-24610 | |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Salem Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-001274 | |
Farm/Lease Name: PITTMAN | |
License Status: Producing | |
License Date: 2015-08-14 | |
Spud Date: 2015-08-17 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2015-11-19 | |
Well Total Depth: 24578.00 ft | |
Configuration: Horizontal | |
Latitude: 39.770000 | |
Longitude: -80.920000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-08-14 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:8/14/2015, Expired Date:8/13/2017 12:00:00 PM, Drilling unit acres:578.266, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2015-11-19 | |
Correction to Well | 2016-12-30 | CHANGE TARGET/TAKEPOINT/ACREAGE AS-DRILLED PLAT RCVD 12/5/16-ALE. |
Completion Report Received | 2017-03-01 | |
Construction Permit Expires | 2017-08-13 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2017-03-01 | 11086 | 24441 | 0 |
11086 | 24441 | 0 | |
11086 | 24441 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 10/11/2016 | 11/14/2016 | 10395 | 31,050,400.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | HYDROCHLORIC ACID - 15% | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 |
SAND-COMMON WHITE - 100 MESH | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
FDP-S1225-15 | Halliburton | Surfactant | Listed Below | Listed Below | 0 | 0 | 0 | |
Ethylene oxide | 75-21-8 | 0.01 | 0.00000033 | 1 | ||||
Alcohols, C12-13, ethoxylated | 66455-14-9 | 30 | 0.00001202 | 346 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00003339 | 100 | ||||
Ethoxylated alcohols | Proprietary | 30 | 0.00009951 | 298 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 5 | 0.00001937 | 58 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.0648377 | 194166 | ||||
Methanol | 67-56-1 | 60 | 0.000199022 | 596 | ||||
Olefins | Proprietary | 5 | 0.00004007 | 120 | ||||
Acetic acid | 64-19-7 | 60 | 0.000481526 | 1442 | ||||
Acetic anhydride | 108-24-7 | 100 | 0.000802098 | 2402 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 13.0922 | 39,206,400.0 | ||||
Reaction product of acetophenone,
formaldehyde, thiourea and oleic acid in dimethyl formamide |
68527-49-1 | 30 | 0.00009951 | 298 | ||||
Glycerine | 56-81-5 | 5 | 0.00001937 | 58 | ||||
Fatty acids, tall oil | Proprietary | 30 | 0.00009951 | 298 | ||||
FE-1A ACIDIZING COMPOSITION | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 86.474 | 258,959,000.0 | |
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.432637 | 1,295,590.0 | |
SAND-PREMIUM WHITE-40/70 | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-11-16 | H2O | 0 | 510214 Gal | 609996 | Halliburton | STAGE 1/67
36 SHOSTS STAGES 2-66 SEE IMAGES |
2016-11-14 | H2O | 15 | 453957 Gal | 598919 | Halliburton | STAGE 67/67
36 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ECLIPSE RESOURCES I LP | 397270 | 0 | 22 |
2017 | ECLIPSE RESOURCES I LP | 6823083 | 0 | 355 |
2018 | ECLIPSE RESOURCES I LP | 1257898 | 0 | 341 |
2019 | ECLIPSE RESOURCES I LP | 284373 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ECLIPSE RESOURCES I LP | Brine | 12584 | 22 |
2017 | ECLIPSE RESOURCES I LP | Brine | 69686 | 355 |
2018 | ECLIPSE RESOURCES I LP | Brine | 6126 | 341 |
2019 | ECLIPSE RESOURCES I LP | Brine | 1953 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1114919161 | 2015-8-19 0:00: | CS | No Violations | 2.00 |
-1569602562 | 2016-11-23 0:00 | CT | No Violations | 3.50 |
-2069872494 | 2016-11-7 0:00: | CT | No Violations | 6.00 |
-459537875 | 2016-12-21 0:00 | CT | No Violations | 3.00 |
-495750803 | 2015-11-10 0:00 | DD | No Violations | 2.50 |
-808539242 | 2017-12-13 0:00 | WR | No Violations | |
0271451859 | 2016-11-02 | Completion Testing | No Violations
Inspection of the lined sumps constructed outside the well pad at global positioning system (GPS) coordinates 39.776921 -80.925483 revealed no fluid and at 39.776714 -80.925548 revealed a pH of 6 and chloride levels of 643 parts per million (ppm) and a pH of 6 and chloride levels of 997 parts per million (ppm). Field tests performed on the well pad near the working tanks at the GPS coordinates 39.775895 -80.925601 revealed a pH of 6 and chloride levels of 3296 ppm. ESM was then instructed by Mr. King to dig a collection sump near the working tanks to collect fluids to be removed until frac is completed in 10 days. Mr. Lois performed initial conductivity tests within the well site boundaries to determine the impacted areas from the release and to determine a plan for further testing. | |
0317835798 | 2017-01-05 | Production Wells | No Violations
- stage vertical separator. Also present included 4-400 barrel tanks within containment, 2 filter separators, 2 vertical scrubbers, 2 heater treaters and a gas combustor all shared with 34111245920000 Holliday A 1H, 34111245910000 Holliday A 3H, 34111245960000 Holliday B 7H and 34111246090000 Circosta 1H. Fluid found in pit #1 at global positioning system (GPS) coordinates 39.776921 -80.925483 was field tested and revealed a pH of 7 and chloride levels of 160 parts per million (ppm). Fluid in pit #2 at GPS coordinates 39.776714 -80.925548 was field tested and revealed a pH of 7 and chloride levels of 203 ppm. The fluid found in the northwest sump was field tested and revealed a pH of 7 and chloride levels of 997 ppm. Various puddles were field tested on the well pad revealing a pH of 7 and chloride levels of < 250 ppm. We met with Eclipse EHS Technician Ken Durst and completed walk around revealing containment was being removed. I instructed Mr. Durst to fill the mouse holes in accordance with OAC 1501:9-11-11 and to continue to pull fluids out of the sump until the levels are acceptable. | |
0428288831 | 2018-05-22 | Production Wells | No Violations | Status check inspection found the well drilling and completion process now complete and the well producing through 2.875 production tubing with 2 manual and 2 emergency shut down in line valves present in the production flowline. Proper well identification is posted. Annular pressure monitoring is in place on the 13.375 and 9.625 well head sections with zero pressure on the 9.625 and 200 psi on the 13.375 well head sections. Production related equipment on site consists of 5 gas processing in line heaters and 5 sand trap separators along with a single glycol heater. The production fluid facility consists of 4 steel construction tanks of 400 barrel capacity situated inside a polymer lined steel containment area. |
0459537875 | 2016-12-21 | Completion Testing | No Violations
-80.925483 was field tested and revealed a pH of 7 and chloride levels of 219 parts per million (ppm). Fluid in pit #2 at GPS coordinates 39.776714 -80.925548 was field tested and revealed a pH of 7 and chloride levels of 650 ppm. The fluid found in the northwest sump was field tested and revealed a pH of 7 and chloride levels of 775 ppm. Various puddles were field tested on the well pad revealing a pH of 7 and chloride levels of < 250 ppm. | |
0495750803 | 2015-11-10 | Drill / Deepen / Reopen | No Violations | |
0808539242 | 2017-12-13 | Work Over Reconditioning | No Violations | Status check inspection found a snubbing unit work over rig set up on the well owned by Deep Well Service with a Quail Service Tools workover blow out preventer stack. The rig is fishing part of the 2.875 diameter production that was lost in the well bore curve between the depths of 10,361 and 11,071 . The company man on site indicated the well bore communicated with another well in the area being stimulated and there is sand in around the tubing string and they had to back the production string off down hole. They have made a clean out run down to the top of the lost string and stabilized the well bore with brine water. They are now pulling the workover string so they may put a fishing neck recovery tool onto the workover string to attempt the recovery process. Once they grab ahold of the lost string they will make an internal clean out run with a coil tubing unit so they can get downhole inside the tubing with wireline tools to free point the tubing. The service rig is situated on polymer containment. |
0968629520 | 2017-03-28 | Production Wells | No Violations
- stage vertical separator. Also present included 4-400 barrel tanks within containment, 2 filter separators, 2 vertical scrubbers, 2 heater treaters and a gas combustor all shared with 34111245920000 Holliday A 1H, 34111245910000 Holliday A 3H, 34111245960000 Holliday B 7H and 34111246090000 Circosta 1H. Fluid found in pit #1 at global positioning system (GPS) coordinates 39.776921 -80.925483 was field tested and revealed a pH of 7 and chloride levels of 151 parts per million (ppm). Fluid in pit #2 at GPS coordinates 39.776714 -80.925548 was field tested and revealed a pH of 7 and chloride levels of 255 ppm. The fluid found in the northwest sump was field tested and revealed a pH of 7 and chloride levels of 96 ppm. Various puddles were field tested on the well pad revealing a pH of 7 and chloride levels of 139 ppm. Issues have been remediated and Compliance Notice is resolved. | |
0988068894 | 2016-12-13 | Completion Testing | No Violations
-80.925483 was field tested and revealed a pH of 7 and chloride levels of 236 parts per million (ppm). Fluid in pit #2 at GPS coordinates 39.776714 -80.925548 was field tested and revealed a pH of 7 and chloride levels of 569 ppm. The fluid found in the northwest sump was field tested and revealed a pH of 7 and chloride levels of 412 ppm. Various puddles were field tested on the well pad revealing a pH of 7 and chloride levels of < 250 ppm. | |
1114919161 | 2015-08-19 | Casing String Witnessed | No Violations | The said well was spudded on 08/17/2015 by Precision Rat Hole with a 30 x 120 conductor borehole being drilled and 120 of 24 .375 wall 94.62# pound per foot weld connection casing being ran. Universal Well Service is the cement contractor on location to cement the casing using 320 sacks of class A-3% calcium .25 pound per sack loss circulation material with the pipe capacity being displaced with 53 barrels of fresh water and 10 barrels of 6% gel prior to cementing with good cement witnessed to surface. Inspector Brian Sefcik accompanied me on this day. |
1446055963 | 2015-10-25 | Casing String Witnessed | No Violations | On site to witness running and cementing of 13.375 surface casing, H&P rig 531 on site and they drilled 17.5 hole to 1774 and ran 1723 of 13.375 and it was cemented in place with 1390 sacks of Class A cement with 32 bbl. Returns to surface
Note: Measurements are from KB not ground level and sub structure is 30tall. |
1477938525 | 2016-10-31 | Completion Testing | Violations Noted | On the day of my inspection following up on a reported release on the pad from 10/30/16 at 0730, I met with EHS Supervisor Bruce Carpenter and EHS Technician Tyler Bryant. Mr. Carpenter stated that a Crescent employee was filling a 500 barrel produced water tank with fresh water and overflowed the tank by 200 barrels. The secondary containment failed resulting in the water flowing across the pad to the northwest side and an unknown amount of water breaching the well pad. Field tests performed on puddles found outside the well pad at global positioning system (GPS) coordinates 39.776921 -80.925483 and 39.776714 -80.925548 revealed a pH of 6 and chloride levels of 643 parts per million (ppm) and a pH of 6 and chloride levels of 843 ppm respectively. Field tests performed on the well pad near the working tanks at the GPS coordinates 39.775895 -80.925601 revealed a pH of 6 and chloride levels of 4933 ppm. Inspection of the north and west sump valves revealed that they appeared to be shut but the outlets could not be found. Owner/Operator tried to locate the outlets by unsuccessfully excavating. At 12:20 ODNR Engineering Tech Andy Thomas and ODNR Emergency Response Tech Nathan Lane arrived and completed walk around. Owner/Operator has removed 3 roll off boxes of contaminated materials to be disposed of in a proper landfill. Owner/Operator shall supply ODNR copies of the manifests for the disposal and continue to excavate the north and west sump drains to verify the valves are closed. Owner/Operator excavated two collection sumps which will be lined to collect water seeping from the pad. Owner/Operator shall continue to test, collect and dispose of contaminated waters and soils from the pad to ensure that all oilfield contaminates are removed and chloride levels are less than 250 ppm. |
1477949314 | 2016-10-30 | Completion Testing | No Violations | On this day I was contacted by Bruce Carpenter with Eclipse at 13:57 pm and informed they had ran a 500 barrel tank over while pumping fresh water into the tank with a reported 5 barrels of product spilled inside containment and a undetermined amount seeping through holes in the containment. Upon further questioning I was informed some well related product was inside the tank. I informed Mr. Carpenter to notify the divisions one call number and contacted my Supervisor. The producer currently has contractors on site stimulating the well. |
1569602562 | 2016-11-23 | Completion Testing | No Violations
-80.925483 was field tested and revealed a pH of 7 and chloride levels of 153 parts per million (ppm). Fluid in pit #2 at 39.776714 -80.925548 was field tested and revealed a pH of 7 and chloride levels of 1004 ppm. The fluid found in the northwest sump was field tested and revealed a pH of 7 and chloride levels of 720 ppm. Various puddles were field tested on the well pad revealing a pH of 7 and chloride levels of < 250ppm. I completed walk around with Eclipse Consultants Will Ochampaugh and Cristo Giannareas revealing that secondary containment was in place and in good shape and production equipment was being installed at the south end of the well pad. | |
1595843237 | 2016-12-07 | Drill / Deepen / Reopen | No Violations | The purpose of my inspection today is to follow up on a compliance notice -1477938525. During my inspection I witnessed Deep Well Services was onsite drilling out the 3411124592 Holliday A 1H. Field test in pit number one at the global positioning system coordinates 39.776921 -80.925483 found chloride levels of 46 parts per million. Field test in pit number two at the global positioning system coordinates 39.776714 -80.925548 found chloride levels of 275 parts per million. |
1667245715 | 2016-11-29 | Completion Testing | No Violations
-80.925483 was field tested and revealed a pH of 6 and chloride levels of 45 parts per million (ppm). Fluid in pit #2 at GPS coordinates 39.776714 -80.925548 was field tested and revealed a pH of 6 and chloride levels of 296 ppm. The fluid found in the northwest sump was field tested and revealed a pH of 6 and chloride levels of 371 ppm. Various puddles were field tested on the well pad revealing a pH of 7 and chloride levels of < 250ppm. I completed walk around with EHS Supervisor Bruce Carpenter and EHS Technician Ken Durst. | |
1730867276 | 2016-11-15 | Completion Testing | No Violations
-80.925483. Fluid in pit at 39.776714 -80.925548 was field tested and revealed a pH of 7 and chloride levels of 919 parts per million (ppm). No fluid was found on the well pad. | |
2007509170 | 2017-03-21 | Preliminary Restoration | No Violations | Preliminary Restoration found the area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. The lease road is in good repair and stoned. The location entry point is posted with the owners contact information. The location is fenced with chain link fence. There is a total of 6 wells on the pad 5 of which are complete and all 6 have identification posted. The said well has a casing and tubing well head in place and is equipped with tubing head valves and B section cross valves. There is a Hydraulic operated electrically controlled emergency valve on the tubing head output flow line that has shut down points at the well head and production facility along with at the well pad entry point. Also on location downstream from the well head is a sand trap and line heater and then a mechanical separator. The mechanical separator sends the processed fluid to the production facility that consists of 4 steel construction 400 barrel capacity production tanks located inside a polymer lined steel containment area. There is also 2 dehydration units on location that service the 6 total line heaters on the pad. |
2069872494 | 2016-11-07 | Completion Testing | No Violations
-80.925483. Fluid in pit at 39.776714 -80.925548 was field tested and revealed a pH of 7 and chloride levels of 561 parts per million (ppm). No fluid was found on the well pad. Mr. Carpenter stated that Eclipse will present a plan for remediation late Wednesday or early Thursday for ODNR to approve prior to commencement. | |
271451859 | 2016-11-2 0:00: | CT | No Violations | 8.00 |
317835798 | 2017-1-5 0:00:0 | PW | No Violations | 2.00 |
428288831 | 2018-5-22 0:00: | PW | No Violations | 0.30 |
968629520 | 2017-3-28 0:00: | PW | No Violations | 2.00 |
987233843 | 2020-5-22 0:00: | PW | No Violations | 1.00 |
988068894 | 2016-12-13 0:00 | CT | No Violations | 3.00 |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1477938525 | US-OH-113666 | 2016-11-25 | Pollution and contamination |
For data sources see[10]