If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24612 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.8,"lon":-81.25,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Summit Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-001310 | |
Farm/Lease Name: CLARA UNIT | |
License Status: Producing | |
License Date: 2015-09-10 | |
Spud Date: 2015-09-19 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2016-02-18 | |
Well Total Depth: 17955.00 ft | |
Configuration: Horizontal | |
Latitude: 39.800000 | |
Longitude: -81.250000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-09-10 | Proposed Formations:POINT PLEASANT, Issued Date:9/10/2015, Expired Date:9/9/2017 12:00:00 PM, Drilling unit acres:690.723, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2015-11-27 | UPDATE TO TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) AND UNIT SIZE. |
Reached Total Depth | 2016-02-18 | |
Correction to Well | 2016-04-22 | CHANGE IN TARGET/TAKEPOINT/ACREAGE PER AS DRILLED PLAT-ALE |
Completion Report Received | 2016-10-11 | |
Construction Permit Expires | 2017-09-09 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-10-11 | 8821 | 17862 | 0 |
8821 | 17862 | 0 | |
8821 | 17862 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 07/20/2016 | 08/03/2016 | 8606 | 15,085,900.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | WFRA-405 | U.S. Well Services | Friction Reducer | Hydrated light distillate (petroleum) | 64742-47-8 | 30 | 0.02557 | 36944.8 |
2-Propenoic acid, polymer with 2 propenamide | 9003-06-9 | 30 | 0.03177 | 45894.2 | ||||
Ethoxylated alcohol blend | 68002-97-1 | 4 | 0.00424 | 6119.22 | ||||
Water | 7732-18-5 | 60 | 0.06353 | 91788.4 | ||||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 12.5213 | 18,089,800.0 | |
SI-1100s | U.S. Well Services | Scale Inhibitor | Water | 7732-18-5 | 80 | 0.00982 | 14184.7 | |
Hexamethylene diamine penta (methylene phosphonic acid) | 23605-74-5 | 2 | 0.00032 | 461.002 | ||||
Phosphino carboxylic acid polymer | 71050-62-9 | 5 | 0.0008 | 1152.5 | ||||
Hexamethylene tramine penta (methylene phosphonic acid) | 34690-00-1 | 5 | 0.0008 | 1152.5 | ||||
Copolymer of Maleic and Acrylic acid | 52255-49-9 | 10 | 0.00145 | 2092.24 | ||||
Potassium salt of diethylene triamine
penta (methylene phosphonic acid) |
15827-60-8 | 7.5 | 0.00124 | 1795.25 | ||||
AI-302 | U.S. Well Services | Acid Corrosion Inhibitors | 2-Propyn-1-olcompound with methyloxirane | 38172-91-7 | 15 | 0.00005000 | 73.809 | |
Water | 7732-18-5 | 95 | 0.00032 | 467.457 | ||||
HCL Acid (12.6%-18.0%) | U.S. Well Services, LLC | Bulk Acid | Water | 7732-18-5 | 87.5 | 0.14886 | 215061 | |
Hydrogen Chloride | 7647-01-0 | 18 | 0.03556 | 51371.1 | ||||
AP One | U.S. Well Services | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.00085 | 1230 | |
LGC-15 | U.S. Well Services | Gelling Agents | Guar Gum | 9000-30-0 | 50 | 0.02779 | 40152.1 | |
Petroleum Distillates | 64742-47-8 | 60 | 0.02632 | 38026.4 | ||||
Suspending agent (solid) | 14808-60-7 | 3 | 0.00425 | 6140.91 | ||||
Surfactant | 68439-51-0 | 3 | 0.00167 | 2409.13 | ||||
Water | Antero Resources | Base Fluid | Water | 7732-18-5 | 100 | 87.0871 | 125,817,000.0 | |
K-BAC 1020 | U.S. Well Services | Anti-Bacterial Agent | Deionized Water | 7732-18-5 | 28 | 0.00234 | 3379.03 | |
2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00409 | 5915.72 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-07-20 | H2O | 0 | 7477 Bbl | 351220 | US Well Services Inc | STAGE 1/52
60 SHOTS STAGES 2-51 SEE IMAGES |
2016-08-03 | H2O | 0 | 6183 Bbl | 352680 | US Well Services Inc | STAGE 52/52
60 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ANTERO RESOURCES CORPORATION | 1653300 | 218 | 122 |
2017 | ANTERO RESOURCES CORPORATION | 1861792 | 363 | 364 |
2018 | ANTERO RESOURCES CORPORATION | 772436 | 320 | 365 |
2019 | ANTERO RESOURCES CORPORATION | 142127 | 108 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ANTERO RESOURCES CORPORATION | Brine | 37784 | 122 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 18851 | 364 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 6559 | 365 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 1199 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1014367752 | 2015-12-8 0:00: | CS | No Violations | 2.50 |
-1078480882 | 2016-9-22 0:00: | PL | No Violations | 0.60 |
-1195526123 | 2018-3-2 0:00:0 | PL | No Violations | 0.20 |
-1612269974 | 2015-12-1 0:00: | CS | No Violations | 6.00 |
-352456800 | 2017-2-21 0:00: | PW | No Violations | 0.50 |
-504189328 | 2016-7-25 0:00: | CT | No Violations | 2.00 |
-70899019 | 2018-3-13 0:00: | PW | No Violations | 0.50 |
-715338270 | 2016-9-22 0:00: | PL | No Violations | 0.50 |
0021306290 | 2019-02-07 | Production Wells | No Violations | On this day, I found the pad gated with signage at the entrance. There are (4) producing wells, (4) gas processing units, (8) 400-barrel steel production tanks within polymer-lined steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 0 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 0 psi. |
0070899019 | 2018-03-13 | Production Wells | No Violations | On site inspection to document annular pressure on the well head. The 13.375 well head section has 0 pounds per square inch pressure and the 9.625 well head section has 650 pounds per square inch pressure. Crews were scheduled to be on site this morning to hook up flow back iron and flow test the Clara 4-H annular pressure to begin a time pressure study of the well. I spoke with Antero production supervisor Doug Stebbins who indicated they were running behind and would not be ready until the afternoon. |
0352456800 | 2017-02-21 | Production Wells | No Violations | Production well status check inspection found the well drilling and stimulation process is complete and the well is in production. There is 4 gas processing units on location one associated with each well on the pad. There is a total of 8 production tanks each with a total capacity of 800 barrels. The lease road is in good repair and a Myers water truck was on location removing production fluid from the production tanks. No standing water was observed inside the tank battery or on location. |
0504189328 | 2016-07-25 | Completion Testing | No Violations | |
0715338270 | 2016-09-22 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection accompanied by ODNR Division staff member Jimmy Wiles found the area affected by the well pad construction restored according to ORC 1509.072 with erosion control in place and vegetation established. Addressing the 4 wells on location- The well drilling and completion process is now complete with casing and tubing well heads installed and a flow back company identified as Solid Oak on site flow testing the wells. A production facility is located on the West side of the well pad consisting of 8-400 barrel production tanks all located in a poly lined steel containment dike area. |
1014367752 | 2015-12-08 | Casing String Witnessed | No Violations | Status check inspection on the running and cementing of the 9.625casing string set as a 1st intermediate string. Patterson Drilling rig 332 is on location and has drilled a 12.250 well bore to a measured depth of 7,821 with a true vertical depth of 7,685 and ran 7,821 of 40lb/ft buttress thread casing with a casing guide shoe and float collar ran and proper centralizer placement demonstrated. CalFrac Cement service was on location to cement the casing using a 11.5 ppg Dynapro Light lead cement mix along with a Class A tail cement mix with 80 barrels of cement spacer returned to surface along with 195 barrels of cement returns reported to surface. |
1078480882 | 2016-09-22 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection accompanying Inspector Bill Stolarik. Addressing the restoration of the area affected by the well pad construction; upon inspection it was observed that there is erosion control and vegetation in place according to ORC 1509.072. There is 4 wells in production on the well pad with a total of 8 -400 barrel production tanks present. |
1195526123 | 2018-03-02 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well site meets ORC 1509.072. The well pad entry point is gated and locked with signage posted. The lease road is graveled along with the well pad, both are in good repair. Addressing the well head - The well is equipped with a B section along with a 9.65 and 5.5 casing well head section and a tubing well head. The tubing well head has 2 manually controlled valves and one emergency shut down valve. Annular pressure monitoring is in place with 0 (psi) pound per square inch indicated between the 9.65 and 13.375 and 650 psi between the 5.5 and 9.625. Proper well identification is posted at the well head. Also on location is (4) gas processing units one for each well head on location. At the right front corner of the well pad is the production fluid storage area consisting of a total of 8 steel construction tanks all situated inside a polymer lined steel containment dike area. Emergency shut down devices are situated at the well pad entrance and at the tank battery loading site. Antero Production Superintendent Doug Stebbins was contacted on this day and met with me on site to discuss annular pressure. |
1442750591 | 2015-09-20 | Casing String Witnessed | No Violations | The said well was spudded on 09/19/2015 by Express Energys top hole rig with a 32 x 100 conductor borehole being drilled. 09/20/2015 the conductor was set and cemented by Express Energy Cement service using 330 sacks of Class A cement with circulation established prior to cementing and the cement displaced with 55 barrels of fresh water and good cement returns witnessed to surface. |
1455729813 | 2016-02-17 | Casing String Witnessed | No Violations | |
1494567107 | 2020-5-15 0:00: | PW | No Violations | 1.20 |
1612269974 | 2015-12-01 | Casing String Witnessed | No Violations | My inspection today finds the drilling rig installed 1343 of 13.625 casing. Eight centralizers were placed on the casing to provide stand off. Calfrac cemented the casing in place by circulating 1290 sacks of class A cement with .5% CaCl into the annular void. I witnessed 60 barrels of cement circulate back to surface. The casing integrity test was passed by pressuring up 500 psi over after landing the latch down plug. |
21306290 | 2019-2-7 0:00:0 | PW | No Violations | 0.10 |
For data sources see[10]