X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24629

Well Details

Well ID: 34-111-24629
Country: United States
State: Ohio
County: Monroe
Municipality: Salem Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-001390
Farm/Lease Name: MOSER A
License Status: Producing
License Date: 2016-07-20
Spud Date: 2016-08-14
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2016-09-04
Well Total Depth: 19091.00 ft
Configuration: Horizontal
Latitude: 39.780000
Longitude: -80.880000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-10-30 Proposed Formations:TRENTON, Issued Date:10/30/2015, Expired Date:10/29/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2016-07-20 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:7/20/2016, Expired Date:7/20/2018 12:00:00 PM, Drilling unit acres:651.991, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2016-09-04
Correction to Well 2017-03-22 UPDATE TARGET/TAKEPOINT PER AS-DRILLED PLAT-RC
Completion Report Received 2017-07-14
Record Last Modified 2018-02-22
Construction Permit Expires 2018-07-20

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-08-22 11120 11278 0
2017-08-22 18831 18935 36
18831 18935 36
11120 11278 0
11120 11278 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 03/22/2017 04/26/2017 10698 20,392,700.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SAND-PREMIUM WHITE-40/70 Halliburton Proppant Listed Below Listed Below 0 0 0
SAND-CRC PREMIUM-30/50 Halliburton Proppant Listed Below Listed Below 0 0 0
SAND-COMMON WHITE-100 MESH Halliburton Proppant Listed Below Listed Below 0 0 0
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
Fresh Water Operator Base Fluid Water 7732-18-5 100 82.2475 159,923,000.0
MB-7530 OneAqua Source Biocide Listed Below Listed Below 0 0 0
HP-2814 OneAqua Source Friction Reducer Listed Below Listed Below 0 0 0
HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
HP-9601 OneAqua Source Additive Listed Below Listed Below 0 0 0
Produced Water Operator Base Fluid Water 7732-18-5 100 5.52724 10,747,300.0
FE-1A ACIDIZING COMPOSITION Halliburton Additive Listed Below Listed Below 0 0 0
Ingredients Listed Above Listed Above Water 7732-18-5 100 0.217165 422260
HP-2220 OneAqua Source Scale Inhibitor Listed Below Listed Below 0 0 0
OILPERM A Halliburton Non-ionic Surfactant Listed Below Listed Below 0 0 0
Hexamethylenetetramine 100-97-0 2 0.00777353 15116
Heavy aromatic petroleum naphtha 64742-94-5 30 0.00004996 98
Ammonium Chloride 12125-02-9 1.5 0.00004416 86
Ammonium chloride 12125-02-9 1.5 0.00057575 1120
Acetic anhydride 108-24-7 100 0.000990734 1927
Ethoxylated alcohols Proprietary 30 0.00004916 96
Dazomet 533-74-4 24 0.00559803 10885
Olefins Proprietary 5 0.00001966 40
Naphthalene 91-20-3 5 0.00000833 17
1,2,4 Trimethylbenzene 95-63-6 1 0.00000167 4
Crystalline silica, quartz 14808-60-7 100 11.9281 23,193,200.0
Distillates (petroleum, hydrotreated light) 64742-47-8 18 0.00743897 14465
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,

branched

127087-87-0 5 0.00000833 17
Methanol 67-56-1 60 0.00009832 192
Ethanol 64-17-5 60 0.00009991 195
Organic phosphate copolymer 71050-62-9 25 0.00299939 5833
Sodium Hydroxide 1310-73-2 4 0.000933005 1815
Propargyl alcohol 107-19-7 10 0.00001639 32
Oxyalkylated phenolic resin Proprietary 30 0.00006661 131
Ammonium Persulfate 7727-54-0 100 0.00207363 4033
Phenol / formaldehyde resin 9003-35-4 5 0.0194338 37788
Hydrochloric acid 7647-01-0 15 0.03257 63339
Reaction product of acetophenone,

formaldehyde, thiourea and oleic acid in dimethyl formamide

68527-49-1 30 0.00004916 96
Fatty acids, tall oil Proprietary 30 0.00004916 96
Acetic acid 64-19-7 60 0.00059444 1156
HP-2816 OneAqua Source Additive Listed Below Listed Below 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-03-22 H2O 15 497031 Gal 584850 Halliburton STAGE 1/39

STAGES 2-38 SEE IMAGES

2017-04-26 H2O 15 520645 Gal 984170 Halliburton STAGE 39/39

STAGES 2-38 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 ECLIPSE RESOURCES I LP 2969217 0 209
2018 ECLIPSE RESOURCES I LP 1974909 0 362
2019 ECLIPSE RESOURCES I LP 284830 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 ECLIPSE RESOURCES I LP Brine 52151 209
2018 ECLIPSE RESOURCES I LP Brine 28049 362
2019 ECLIPSE RESOURCES I LP Brine 4485 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1708762680 2016-8-25 0:00: DD No Violations 1.00
0749390114 2016-08-25 Drill / Deepen / Reopen No Violations The inspection today revealed that H&P rig 531 has Schlumberger is on site and awaiting to cement the 2nd intermediate casing at 9940 feet measured depth. They have the casing set at 9885 feet measured depth and they plan on having a 2 joint shoe which is about an 85 foot shoe.
1471233450 2016-08-14 Casing String Witnessed No Violations On site inspection to witness the surface-mine string cement job found H&P Drilling rig 531 on location and the rig has drilled a 24 borehole to a depth of 868with a mine void being encountered at 784 to 793. The rig then ran 824 of J-55 Buttress thread 87.50 lb./ft. casing with a guide shoe and float collar ran along with a Blackhawk External Casing Packer set at 653 with a stage tool directly above the packer set at 651, a cement basket was ran below the stage tool at 670. Schlumberger Cemented the casing string in a 2 stage cement process with the bottom section cemented to isolate the casing shoe and mine void using 300 sacks of class A cement displaced with a wiper plug to the float collar using 246 barrels of water, upon landing of the cement plug casing integrity was verified by pressure @ 300 psi with pressure then increasing to 360 psi to inflate the packer and then being increased to 500 psi to activate the DV tool circulating ports; allowing the upper section to be cemented by pumping 200 barrels of fresh water followed by 1,110 sacks of Class A cement displaced with 200 barrels of fresh water and the casing integrity once again verified by increasing displacement pressure to 500 psi over lift pressure. Cement returns were witnessed to surface upon the landing of the 2nd plug. The 18.625 casing shoe bottom section cement balance job is to be verified be before proceeding.
1504198413 2017-08-31 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the well site meets ORC 1509.072 with the area affected by the well pad construction restored and vegetation established. The well pad perimeter is fenced with a 8 chain link fence and signage posted at the well pad entrance as well as at each well head and at the tank battery. Emergency shut down devices are located at the well pad entrance the tank battery and Gas processing units and also inside the remote transmission unit building, and finally at the well head. On location a total of (8) wells are present with all wells drilled- stimulated and completed with the production valves in the open position at the well head. Also present on the well heads is annular pressure monitoring gauges with zero pressure showing between the 13.375 and 9.625, and 750 psi between the 5.5 and 9.625. The company is monitoring and addressing any annular pressure. On the South side of the well pad is the production facility consisting of a total of (4) steel construction production tanks with a total of 400 barrels fluid capacity each. On the East side of the well pad is the production filtration and separation equipment consisting of a total of (8) gas processing units and (2 )dehydration units. Directly on the North East side of the well pad is the gas distribution point where the gas product is transferred over to Eureka Midstream.
1587130986 2020-4-17 0:00: PW No Violations 0.30
1638990987 2016-07-26 Casing String Witnessed No Violations 07/26/2016- On site inspection to witness the conductor casing cement job. Precision Rat hole has drilled a 36 x 120 conductor borehole with no surface water encountered. 120 of 30 x .375 wall with weld connections conductor pie was ran. Universal Well Service cement company cemented the casing using 471 sacks of Type 1 cement with circulation established and 10 barrels of 6% gel ran ahead of he cement. Cement returns were witnessed at 50 barrels into a total of 91 barrels of fresh water displacement with cement visible inside the cellar and cement staying up to surface level.
1708762680 2016-08-25 Drill / Deepen / Reopen No Violations Status check inspection on the well driling process found H&P Rig 531 on location with the 12.250 well bore total drilling depth recently reached at 9,940 Measured depth. The rig is running the 9.625 40 lb/ft HCP110 casing and Slumberger Cement Service is standing by to cement the casing.
749390114 2016-8-25 0:00: DD No Violations 4.00

For data sources see[10]

References