If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-111-24651 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.7,"lon":-81.18,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Monroe | |
| Municipality: Wayne Township | |
| Operator Name: GULFPORT APPALACHIA LLC | |
| Well Pad ID: US-OH-001066 | |
| Farm/Lease Name: ROGER 210634 | |
| License Status: Producing | |
| License Date: 2016-03-08 | |
| Spud Date: 2016-03-16 | |
| Spud Drilling Contractor: NOMAC DRILLING CORP | |
| Final Drill Date: 2016-10-11 | |
| Well Total Depth: 17729.00 ft | |
| Configuration: Horizontal | |
| Latitude: 39.700000 | |
| Longitude: -81.180000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2016-03-08 | Proposed Formations:UTICA THRU POINT PLESANT, Issued Date:3/8/2016, Expired Date:3/8/2018 12:00:00 PM, Drilling unit acres:599.85, Proposed Well Type:OG, Proposed Well Class:EOUT |
| Reached Total Depth | 2016-10-11 | |
| Correction to Well | 2017-09-01 | UPDATE TAKEPOINT PER AS-DRILLED PLAT RCVD 07/10/17-ALE |
| Completion Report Received | 2017-09-15 | |
| Record Last Modified | 2017-10-23 | |
| Construction Permit Expires | 2018-03-08 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2017-09-18 | 9581 | 9727 | 0 |
| 2017-09-18 | 17404 | 17561 | 0 |
| 17404 | 17561 | 0 | |
| 9581 | 9727 | 0 | |
| 9581 | 9727 | 0 |
For data sources see[3]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 01/30/2017 | 02/13/2017 | 9115 | 10,834,600.0 | 0 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Gulfport Energy | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 87.9123 | 90,414,500.0 |
| Other Chemical(s) | Listed Above | See Trade Name(s) List | Water | 7732-18-5 | 70 | 0.0521417 | 53625.8 | |
| Olefin | Proprietary | 5 | 0.00005744 | 59.07 | ||||
| Water | 7732-18-5 | 64 | 0.118405 | 121775 | ||||
| Methanol | 67-56-1 | 35 | 0.000402047 | 413.491 | ||||
| Water | 7732-18-5 | 55 | 0.0088478 | 9099.64 | ||||
| 2-Ethylhexanol | 104-76-7 | 10 | 0.000114871 | 118.14 | ||||
| Water | 7732-18-5 | 90 | 0.0316929 | 32595 | ||||
| Alcohols, C14-15, ethoxylated | 68951-67-7 | 5 | 0.00005744 | 59.07 | ||||
| 2-Propyn-1-ol | 107-19-7 | 5 | 0.00005744 | 59.07 | ||||
| Fatty acids, tall oil | 61790-12-3 | 5 | 0.00005744 | 59.07 | ||||
| Coconut oil acid diethanolamine | 68603-42-9 | 5 | 0.00005744 | 59.07 | ||||
| NEFE-180 | Chemplex | Corrosion Inhibitor/Iron Control | 2-Ethylhexanol | 104-76-7 | 10 | 0.000114871 | 118.14 | |
| 2-Propyn-1-ol | 107-19-7 | 5 | 0.00005744 | 59.07 | ||||
| Olefin | Proprietary | 5 | 0.00005744 | 59.07 | ||||
| Methanol | 67-56-1 | 35 | 0.000402047 | 413.491 | ||||
| Acetic acid | 64-19-7 | 65 | 0.000746659 | 767.911 | ||||
| Fatty acids, tall oil | 61790-12-3 | 5 | 0.00005744 | 59.07 | ||||
| Coconut oil acid diethanolamine | 68603-42-9 | 5 | 0.00005744 | 59.07 | ||||
| Alcohols, C14-15, ethoxylated | 68951-67-7 | 5 | 0.00005744 | 59.07 | ||||
| Bio B2512 | Lubrizol | Biocide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 10 | 0.00352143 | 3621.66 | |
| Water | 7732-18-5 | 90 | 0.0316929 | 32595 | ||||
| Sand (40/70 White Proppant) | Taylor Frac | Proppant | Silica Substrate | 14808-60-7 | 100 | 10.8109 | 11,118,700.0 | |
| Hydrochloric Acid (28%) | Oxy | Acidizing | Water | 7732-18-5 | 64 | 0.118405 | 121775 | |
| Hydrochloric Acid (Hydrogen Chloride) | 7732-18-5 | 36 | 0.0666029 | 68498.6 | ||||
| FRA-409 | Lubrizol | Friction Reducer | Water | 7732-18-5 | 70 | 0.0521417 | 53625.8 | |
| Distillates, Petroleum, Hydrotreated Light | 64742-47-8 | 30 | 0.0223465 | 22982.5 | ||||
| SI-20W | Stingray Pressure Pumping, LLC | Scale Inhibitor | Phosphinocarboxylic Acid | 110224-99-2 | 45 | 0.00723911 | 7445.16 | |
| Water | 7732-18-5 | 55 | 0.0088478 | 9099.64 | ||||
| Sand (100 Mesh Proppant) | Taylor Frac | Proppant | Silica Substrate | 14808-60-7 | 100 | 0.964838 | 992300 |
For data sources see[4]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2017-01-29 | H2O | 15 | 243138 Gal | 275078 | STINGRAY PRESSURE PUMPING LLC | STAGE 1 OF 44 |
| 2017-02-12 | H2O | 15 | 246372 Gal | 275400 | STINGRAY PRESSURE PUMPING LLC | STAGE 44 OF 44-SEE IMAGES FOR STAGES 2-43 |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2017 | GULFPORT ENERGY CORPORATION | 2903047 | 0 | 266 |
| 2018 | GULFPORT ENERGY CORPORATION | 1272449 | 0 | 363 |
| 2019 | GULFPORT ENERGY CORPORATION | 197215 | 0 | 90 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2017 | GULFPORT ENERGY CORPORATION | Brine | 44264 | 266 |
| 2018 | GULFPORT ENERGY CORPORATION | Brine | 16469 | 363 |
| 2019 | GULFPORT ENERGY CORPORATION | Brine | 2825 | 90 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1218574127 | 2020-4-15 0:00: | PW | No Violations | 0.30 |
| -1565251701 | 2016-3-17 0:00: | CS | No Violations | 2.00 |
| -1731110766 | 2016-4-19 0:00: | DD | No Violations | 1.00 |
| -1812429334 | 2016-4-12 0:00: | CS | No Violations | 5.00 |
| -2031705830 | 2016-11-7 0:00: | PL | No Violations | 0.50 |
| -422875094 | 2016-10-6 0:00: | DD | No Violations | 0.90 |
| 0422875094 | 2016-10-06 | Drill / Deepen / Reopen | No Violations | |
| 0748220929 | 2017-03-06 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection accompanied by ODNR Inspector Austin Gutridge. The area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. The lease road is stoned and in good repair. Signage is posted at the well pad entrance. Hybrid Services completion rig # 102 is on location drilling out the completion plugs on the Roger # 4-A well. The rig is situated on polymer containment with the well pad perimeter earthen berm serving as the primary containment with the pad drain valves closed. There is 6 total wells on the pad that have been drilled and stimulated that will now be completed and the initial flow back operations commenced. |
| 0796922730 | 2017-06-27 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the area affected by the well site construction has vegetation established and erosion control in place and is in compliance with ORC 1509.072. Addressing the well site. There is 6 producing wells on the pad all in line and selling product with tubing well heads installed on each well and the production valves in the open position. The wells are selling into gas processing units (GPU) with (6) units present. Also on the well site is the production fluid storage facility consisting of (4) steel production tanks all located inside a polymer lined steel containment dike area. The company has installed electrically controlled emergency shut down devices at each well head and also at the production facility and the well pad entrance. Located along the well site entrance lease road is a mid stream operation owned by Rice Energy in which all the wells on the pad sell into. Signage is posted at the well pad entrance and at each well head. |
| 1565251701 | 2016-03-17 | Casing String Witnessed | No Violations | The said well was spudded on 03/16/2016 with a 110 x 36 conductor borehole being drilled by Butches Rat Hole Service and -110 of 26 .375 wall-weld connection conductor pipe was set and cemented by Stingray Cement Service using 490 sacks of Class A cement with 2% calcium and .125 lb/sk lcm additives. Circulation was established prior to cementing and maintained throughout the job with cement displaced with 62 barrels of fresh water and cement returns witnessed to surface |
| 1731110766 | 2016-04-19 | Drill / Deepen / Reopen | No Violations | Status check inspection to document the 9.625 casing cement job. On 04/17/2016 the 12.250 borehole was drilled to a measured depth of 8,597 and 8,488 of 43.5 lb/ft 9.625 casing was set and cemented with Nomac Drilling rig # 83 on location driling and Stingray Cement Service conducting the cement job with circulation established prior to cementing and 67 barrels of cement returns to surface reported. |
| 1812429334 | 2016-04-12 | Casing String Witnessed | No Violations | On site inspection to witness the 13.375surface casing cement job. Nomac Drilling rig # 83 is on the location and has drilled a 17.5 borehole to a depth of 1,345 and ran 13.375 54.4lb/ft casing to a depth of 1,345 with a float collar at 1,299 and guide shoe at 1,345 and proper centralizer placemen demonstrated. Stingray cement service was on location to cement the casing using 1,185 sacks of Class H cement with 25 barrels of 6% gel spacer ran ahead of the cement and circulation established prior to and maintained throughout the cement job with cement returns witnessed to surface and the casing pressure tested to 500 psi over lift pressure upon the landing of the cement plug. |
| 1865623479 | 2018-03-15 | Production Wells | No Violations | On this day, I found the well equipped with annular pressure monitoring devices. The pressure gauges are labeled with surface pressure reading 0 pounds per square inch, and the intermediate gauge reading 0 pounds per square inch. There are (6) total wellheads, all in production, with concrete barriers surrounding them, and an electronic shutdown button at each wellhead. The facility is gated with proper signage, and an electronic shutdown button on the left-side, prior to the pad. The back right-side of the pad is equipped with (4) 400 barrel steel tanks and (1) 50 barrel steel tank all within containment, and an electronic shutdown button is present. There are (6) gas processing units along the right-side of the pad with electronic shutdown buttons on each, and a midstream facility on the right, at the entrance. |
| 2031705830 | 2016-11-07 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well site meets ORC 1509.072. The well has been drilled and is awaiting completion. |
| 748220929 | 2017-3-6 0:00:0 | PL | No Violations | 0.50 |
| 796922730 | 2017-6-27 0:00: | PL | No Violations | 0.20 |
For data sources see[10]